Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Fresh thoughts on framework construction

7196 views
32 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Monday, August 19, 2019 3:25 PM

A friend's around-the-room layout is supported by shelf brackets, which works well enough.  However, it more-or-less wastes the space below it, unless you use it for open storage, which often results in a lot of unsightly clutter.

I opted for very sturdy benchwork, which includes shelving about 6" above the floor (not necessary yet, but a good idea if your basement floods regularly)....

The layout supports and shelving are set-back from the layout's fascia, and include either sliding doors or lift-off panels to hide the clutter...

However, I did opt for shelf brackets to support most of the partial upper level.  All but one consist of uprights of 1 1/2" angle iron, about 7" long, to which a crossmember of 1" angle iron has been welded.  Most are about 31" long.  The brackets are lag-bolted to the wall studs with 3" bolts...

The one exception is for an outside corner of the room, with two horizontal supports, as shown below...

For it, the 1 1/2" angle bolted to the corner studs is about 21" long to account for the greater load.

Under normal viewing when operating on the lower level, seated on a rolling office chair, the brackets are, at worst, only partially visible...

Wayne

 

  • Member since
    June 2007
  • 8,892 posts
Posted by riogrande5761 on Tuesday, August 20, 2019 7:49 AM

cuyama

Despite the bashing, L-girder still works great for curved benchwork edges, long spans, and major elevation changes

I don't think anyone is bashing L-girder, rather may may consider it unnecessary and can generally achieve most needs with ordinary open grid, including curved fascia, as has been demonstrated in this topic.

Often it seems that more time is spent ruminating on benchwork approach than it would take to build it.

Byron

It may seem so, but I'm guessing many ruminate on it while away from the house.

Rio Grande.  The Action Road  - Focus 1977-1983

  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Tuesday, August 20, 2019 9:18 AM

 I usually meditate on it while floating in my pool. Big Smile

Bottom line really is, both have their places and uses. I know I will have both on my layout, in some places I will have long runs where I want few if any legs - L girder will do that for me, better than open grid would. And I have other areas that will be built cantilever from a wall, which will also support the backdrop isolating the two sides. Since it's a net new interior wall, I can just run horizontal members out from the studs to support the benchwork on both sides. ANd to keep deck heights reasonable, the upper deck ill need to be as thin as possible, so metal support brackets and definitely NOT L girder up there.

 The section that will cantilever from the new wall is a flat area - yard and city scene, so free-flowing vertical changes are not necessary. So it all works out perfectly. 

                                 --Randy

 


Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!