Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Critique My Layout

4398 views
32 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    May 2017
  • 121 posts
Posted by restorator on Tuesday, March 26, 2019 5:54 PM

That is awesome! You are da man!

It looks so different on "paper". Wow.

 

  • Member since
    January 2014
  • 1,500 posts
Posted by ROBERT PETRICK on Monday, March 25, 2019 9:48 AM

Here's the first draft of the track plan. Not great, but not too horribly bad. A little fuzzy because I had to compress the .JPG file to fit.

Robert

LINK to SNSR Blog


  • Member since
    March 2018
  • 688 posts
Posted by BNSF UP and others modeler on Friday, March 22, 2019 7:21 PM

If you give me all the dimensions (including fascia curve radius), I can make a 3d model using sketchup. I did it for my layout and it works splendidly. The basic version is free too. Here is a screenshot:

 

I haven't "laid" too much track yet, and my layout in real life isn't much further in progress, so thats why it looks so primitive and plain.

I'm beginning to realize that Windows 10 and sound decoders have a lot in common. There are so many things you have to change in order to get them to work the way you want.

  • Member since
    January 2014
  • 1,500 posts
Posted by ROBERT PETRICK on Friday, March 22, 2019 5:39 PM

restorator

The overall length with staging would be an additional 130 inches added to the 170 on that axis ( perpendicular to the stairs) for 300 inches total

I revised the sketch in the previous post to reflect these comments and additional info. No sense clogging up the thread with a lot of preliminary stuff. Plenty of time to clog things up later.

Robert

LINK to SNSR Blog


  • Member since
    May 2017
  • 121 posts
Posted by restorator on Friday, March 22, 2019 3:25 PM

The overall length with staging would be an additional 130 inches added to the 170 on that axis ( perpendicular to the stairs) for 300 inches total

  • Member since
    May 2017
  • 121 posts
Posted by restorator on Friday, March 22, 2019 3:21 PM

The 164 is the horizontal in your image (parallel with the stairs). The 170x164 is the main layout room ONLY and does not include the stairs nor staging areas at all. All shelves around the walls in the main room are exactly 2ft wide not including the center penninsula section

  • Member since
    January 2014
  • 1,500 posts
Posted by ROBERT PETRICK on Friday, March 22, 2019 2:32 PM

Basic stuff.

The first thing I need to know . . . If the room is 170"x164", which dimension is which.

The grid shown is 12"x12". The lower left corner is (0,0).

EDIT:  Revised sketch.

LINK to SNSR Blog


  • Member since
    May 2017
  • 121 posts
Posted by restorator on Friday, March 22, 2019 1:44 PM

in the meantime I can tell you all the mainline curves (and mostly all of them on the layout) are 24 inch min radius except the big center one which is approx 26 radius

  • Member since
    January 2014
  • 1,500 posts
Posted by ROBERT PETRICK on Friday, March 22, 2019 12:04 PM

restorator

Here is a link to a google photos album on the layout with measurements.
main room overall 170" x 164" almost 14'x14'

https://photos.app.goo.gl/fPVssp9TdCVsKNeB8

Okay. Those photos are good, and there are a lot of them.

Later on, we might need some more and some that look kinda like this:

No need to worry about this right now. Let me noodle around a while and see how the rough layout goes. One thing we will need are some specific dimensions of the stairs.

Robert

 

LINK to SNSR Blog


  • Member since
    May 2017
  • 121 posts
Posted by restorator on Friday, March 22, 2019 11:09 AM

Here is a link to a google photos album on the layout with measurements.
main room overall 170" x 164" almost 14'x14'


https://photos.app.goo.gl/fPVssp9TdCVsKNeB8

  • Member since
    June 2007
  • 8,892 posts
Posted by riogrande5761 on Friday, March 22, 2019 10:22 AM

joe323
 

u

You know someone is going to try that now

 
Ol Putin seems to want to fry the earth lately.

Rio Grande.  The Action Road  - Focus 1977-1983

  • Member since
    April 2009
  • From: Staten Island NY
  • 1,734 posts
Posted by joe323 on Friday, March 22, 2019 6:24 AM

Lone Wolf and Santa Fe

 

 
restorator

 

 
Pruitt

It looks great to me, restorator!

Is that an Alexa sitting on the table? Can you say "Alexa, run my GG1" and have it start the train? Big Smile

 

 

 
Ha, not yet, but I can tell her to turn the lights on and off and play music while I am working.

But that does give me an idea, I could put an Alexa controlled outlet or even a few, for the command station and other powered items that I could tell her to shutdown, which could work both in an emergency, and for the night.

"Alexa!, Shut down the layout, we got a runaway!"
 

 

 

Just don't ask Alexa to play, "Global Thermonuclear War" Wink

 

u

You know someone is going to try that now

Joe Staten Island West 

  • Member since
    January 2014
  • 1,500 posts
Posted by ROBERT PETRICK on Friday, March 22, 2019 12:19 AM

restorator
I have wanted a copy of my track plan and have asked others and even offered payment, but no bites, only references to several different software choices to use.

Okay, we'll give it a shot.

I've seen the video. Do you have still photos? The plan is to work out a rough draft of the overall layout using a bunch of photos pieced together and arranged in a kind of mosaic. Overhead viewpoint shots. The higher, the wider, the better. And some general dimensions. Rough dimensions for now; more, tighter dims later as things start to gel.

Robert

LINK to SNSR Blog


  • Member since
    May 2017
  • 121 posts
Posted by restorator on Thursday, March 21, 2019 6:46 PM

ROBERT PETRICK


Sadly I cannot seem to successfully work with track planning software, hence the reason I posted the video.

 

Hey Rest-

Do you want a track plan? Personally, I can see a lot of reasons for a plan even if the layout is completely 100% built, and as we all know, no layout is ever 100% built. Maybe a large illustrated plan to tape to the wall, or just something on letter-size paper to figure out wiring schemes or something.

I'm asking if you really really want a plan because there are people on this forum who can easily prepare one for you. I know of at least one who enjoys doing forensic sort of work who could even work out a workable plan from the video.

So, if you can take some photos and maybe include a few rough measurements (or even manage to stick a yardstick or tape measure into the scene for reference), a rough layout plan might show up all by itself. Who knows?

Robert 

 

 

YES! I have wanted a copy of my track plan and have asked others and even offered payment, but no bites, only references to several different software choices to use.

  • Member since
    May 2017
  • 121 posts
Posted by restorator on Thursday, March 21, 2019 6:43 PM

Doughless

...

If you must have a critique, the only possible issue I noticed is that a lot of the spurs have a lot of cars on them.  I don't know if you have a switch list or operating plan, but sometimes a lot of cars on spurs hinders the ability to switch out industries.  It sometimes is a benfit to keep some nearby tracks empty as to give the crew places to spot cars out of the way while switching industries.  

...

 

I am using JMRI operations and it gives pretty good car movement. Sometimes its easy and sometimes a bit more of a puzzle. Sometimes things are full, sometimes empty, and sometimes in between. It makes it so you dont really know whether the work for the day is going to be a challange or easy until you get your switchlist. I like it.

  • Member since
    January 2015
  • From: Southern California
  • 1,682 posts
Posted by Lone Wolf and Santa Fe on Thursday, March 21, 2019 12:15 PM

restorator

 

 
Pruitt

It looks great to me, restorator!

Is that an Alexa sitting on the table? Can you say "Alexa, run my GG1" and have it start the train? Big Smile

 

 

 
Ha, not yet, but I can tell her to turn the lights on and off and play music while I am working.

But that does give me an idea, I could put an Alexa controlled outlet or even a few, for the command station and other powered items that I could tell her to shutdown, which could work both in an emergency, and for the night.

"Alexa!, Shut down the layout, we got a runaway!"
 

Just don't ask Alexa to play, "Global Thermonuclear War" Wink

Modeling a fictional version of California set in the 1990s Lone Wolf and Santa Fe Railroad
  • Member since
    January 2014
  • 1,500 posts
Posted by ROBERT PETRICK on Thursday, March 21, 2019 9:40 AM

restorator
Sadly I cannot seem to successfully work with track planning software, hence the reason I posted the video.

Hey Rest-

Do you want a track plan? Personally, I can see a lot of reasons for a plan even if the layout is completely 100% built, and as we all know, no layout is ever 100% built. Maybe a large illustrated plan to tape to the wall, or just something on letter-size paper to figure out wiring schemes or something.

I'm asking if you really really want a plan because there are people on this forum who can easily prepare one for you. I know of at least one who enjoys doing forensic sort of work who could even work out a workable plan from the video.

So, if you can take some photos and maybe include a few rough measurements (or even manage to stick a yardstick or tape measure into the scene for reference), a rough layout plan might show up all by itself. Who knows?

Robert 

LINK to SNSR Blog


  • Member since
    November 2015
  • 723 posts
Posted by UNCLEBUTCH on Thursday, March 21, 2019 9:18 AM

restorator
This layout is the result of no serious planning and several changes during development. It is pretty fun and reasonably straightforward to work

That is the correct way. If it works the way you want; you done good.

  • Member since
    February 2005
  • 869 posts
Posted by davidmurray on Thursday, March 21, 2019 9:00 AM

What is left to plan?

Things look good, even better than just good.

Work on buildings and operate, either alone or with a crew, depending on your desires.  If after a year or so you start thinking "I wish that track was longer" then add some length.

Then do detailed scenery.

Then start publishing how to clinics.

Dave

 

David Murray from Oshawa, Ontario Canada
  • Member since
    February 2008
  • 2,360 posts
Posted by kasskaboose on Thursday, March 21, 2019 8:22 AM

Finally a layout I can see!  I like what you did with the variety of industries.  The lack of roofs on buildings is to make adding lights later easier? 

I saw at the 1:00 mark on the video stub tracks that might be too close to the curved track.  It was difficult to determine the distance between them.  Perhaps they are farther in real life.

I've had great success with the SCARM free-ware.  It hs libraries from various track companies (e.g, Walthers, Atlas, etc).   You also can add elevation, bridges, etc.  The learning curve is not too steep either.  Youtube has tutorials on it.

Thanks for sharing! I can't wait for further updates.  Good luck and have fun.

 

  • Member since
    June 2007
  • 8,892 posts
Posted by riogrande5761 on Thursday, March 21, 2019 7:41 AM

restorator
Sadly I cannot seem to successfully work with track planning software, hence the reason I posted the video.

 

You may want to consider getting an 11x17 pad of graph paper, a scale rule and a decent compass and draw track plans on paper old school like this:

First measure the boundaries of the room and the location of doors or other obstacles.  Then draw them to scale on the pad as large as will fit.  Then you have the basis to plan, design and draw a track plan.

Rio Grande.  The Action Road  - Focus 1977-1983

  • Member since
    December 2008
  • From: Heart of Georgia
  • 5,406 posts
Posted by Doughless on Thursday, March 21, 2019 7:35 AM

I think it looks great.  Obviously you are continuing to progress with scenery and details.  Its hard to study the trackplan for possible inefficiencies by looking at the video, if that's what you're after.

If you must have a critique, the only possible issue I noticed is that a lot of the spurs have a lot of cars on them.  I don't know if you have a switch list or operating plan, but sometimes a lot of cars on spurs hinders the ability to switch out industries.  It sometimes is a benfit to keep some nearby tracks empty as to give the crew places to spot cars out of the way while switching industries.  

Other than that possibility, I got nothing.  Looks like fun.

- Douglas

  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,797 posts
Posted by hon30critter on Wednesday, March 20, 2019 11:42 PM

restorator
Sadly I cannot seem to successfully work with track planning software, hence the reason I posted the video.

What's to plan? You have a great looking layout! Go with it! By all means fine tune the track arrangements if you feel the need, but AFAIC you should be enjoying what you have already done.

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    July 2006
  • From: Phoenix, AZ
  • 1,835 posts
Posted by bearman on Wednesday, March 20, 2019 9:35 PM

Looks good to me.  I was looking for the dreaded S curves and could not see any.  I am impressed that you have a fold down which is part of a reversing wye.

Bear "It's all about having fun."

  • Member since
    March 2017
  • 8,173 posts
Posted by Track fiddler on Wednesday, March 20, 2019 7:51 PM

Looks good to me restorator.  I especially like the warehouse district and the buildings in progress there.  A lot of nice yards too.  I don't think you'll ever get bored in your basement.  I could only wish I had your kind of extra space available.

TF

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Wednesday, March 20, 2019 7:44 PM

restorator
Sadly I cannot seem to successfully work with track planning software, hence the reason I posted the video.

I wouldn't worry about a track plan now, you have it down and running.  A plan at this point isn't going to change anything.  It isn't going to show you anything that you haven't worked out already.

I don't think you need to add any more track, unless you like the "busy" look, or as some might call "cluttered".

It looks good, work on scenery, and structures.

Mike..

  • Member since
    May 2017
  • 121 posts
Posted by restorator on Wednesday, March 20, 2019 6:44 PM

Pruitt

It looks great to me, restorator!

Is that an Alexa sitting on the table? Can you say "Alexa, run my GG1" and have it start the train? Big Smile

 
Ha, not yet, but I can tell her to turn the lights on and off and play music while I am working.

But that does give me an idea, I could put an Alexa controlled outlet or even a few, for the command station and other powered items that I could tell her to shutdown, which could work both in an emergency, and for the night.

"Alexa!, Shut down the layout, we got a runaway!"
  • Member since
    February 2001
  • From: Wyoming, where men are men, and sheep are nervous!
  • 3,392 posts
Posted by Pruitt on Wednesday, March 20, 2019 6:15 PM

It looks great to me, restorator!

Is that an Alexa sitting on the table? Can you say "Alexa, run my GG1" and have it start the train? Big Smile

  • Member since
    May 2017
  • 121 posts
Posted by restorator on Wednesday, March 20, 2019 5:57 PM
Sadly I cannot seem to successfully work with track planning software, hence the reason I posted the video.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!