Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Small switching layout ideas

11466 views
17 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    May 2017
  • 12 posts
Small switching layout ideas
Posted by MBmodeler on Sunday, February 18, 2018 12:07 PM

I thinking of building a 2x8 switching layout that I could add on modules later. I’m looking for ideas of what a ho switching layout would look like. If anyone has any pictures or track plans that would be great. 

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Sunday, February 18, 2018 12:11 PM

I Goggel Images searched on "2 x 8 ho track plans" and got a lot. 

A straight Google search got some interesting results as well. 

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    July 2006
  • From: Sebring FL
  • 842 posts
Posted by floridaflyer on Sunday, February 18, 2018 12:31 PM

You can also use this site. Go to "how to" at the top on the page, hit track plan datebase on the drop down. put in your info and plans will appear.

  • Member since
    July 2009
  • From: lavale, md
  • 4,678 posts
Posted by gregc on Sunday, February 18, 2018 1:38 PM

 

greg - Philadelphia & Reading / Reading

  • Member since
    January 2017
  • 2,980 posts
Posted by NWP SWP on Sunday, February 18, 2018 2:18 PM

I am currently negotiating rights of use foe 6x8 alcove to build a layout in...

I'll have a mine and logging camp that sends loads to the terminal which has engine service facilities where the head out bound off layout, then empties come back and go back to the industries... kinda gonna be tight but I think it'll give me reasonable ops... best of luck on your own layout!

Steve

If everything seems under control, you're not going fast enough!

  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Sunday, February 18, 2018 2:21 PM

gregc

 

 

 Truly a great operating layout - even more info if you go back to the August and November 1939 MR (color shot on the cover in August). Simple - but prototypically accurate. Now, getting it into a 2x8 is going to be tough, even in N scale (original is 17/64 O scale).

                                    --Randy


Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

  • Member since
    July 2009
  • From: lavale, md
  • 4,678 posts
Posted by gregc on Sunday, February 18, 2018 3:02 PM

rrinker
getting it into a 2x8 is going to be tough

MBmodeler
thinking of building a 2x8 switching layout that I could add on modules later.

a plan for later and some choices for now.   maybe two 1x8 (or smaller) sections now

greg - Philadelphia & Reading / Reading

  • Member since
    October 2007
  • From: Fullerton, California
  • 1,364 posts
Posted by hornblower on Sunday, February 18, 2018 5:16 PM

While longer than 8' in HO, check out the Fall Creek Branch track plan.  The MR article it was featured in includes a complete operating scheme with 12 separate sessions before cycling back to Session 1.  I'm currently helping a neighbor build an N scale version only 6' long.

Hornblower

  • Member since
    December 2001
  • From: Northern CA Bay Area
  • 4,387 posts
Posted by cuyama on Sunday, February 18, 2018 6:44 PM

This one I designed for a client is a little longer at 9 feet, but has a lot of operating potential, combining a small yard, a runaround, and industries. Like many good small switching layouts, there are echoes Of Linn Westcott's "Switchman's Nightmare". The two “Running Tracks” down the center (in blue) are broader radii, so it would be a nice addition to other sections in a larger layout.

Folks may read more about this layout (and some other alternatives that I thought were less successful) in this reprint from the Layout Design Journal.

Good luck with your layout.

Byron

 

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Sunday, February 18, 2018 6:49 PM

cuyama
Folks may read more about this layout (and some other alternatives that I thought were less successful in this reprint from the Layout Design Journal.

I always liked this one, Byron. 

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Monday, February 19, 2018 7:38 AM

 Now that one I could build now and have something the run, and eaily incorporate in my layout, the 30" radius of the 'through' tracks makes that entirely usable. I'd almost have to make it a module for the upper level, since with the distances involved there's not likely be a second yard on the lower level.

 Then I'm thinking that would require me to figure out exactly how I am going to build the upper level benchwork - but, no, it doesn't. If I frame something like that out but use risers and cleats, and screw up from the bottom, I cna always unscrew the entire plywood top and mount it to whatever I want later.

                                   --Randy

 


Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

  • Member since
    November 2006
  • From: Northeast
  • 746 posts
Posted by GraniteRailroader on Monday, February 19, 2018 8:18 AM

 Truly a great operating layout - even more info if you go back to the August and November 1939 MR (color shot on the cover in August). Simple - but prototypically accurate. Now, getting it into a 2x8 is going to be tough, even in N scale (original is 17/64 O scale).

                                    --Randy

Modifying this to N scale, and 2x8, seems plausible with some minor tweaks and changes. Varying a divider to run curved and at angles to the long edge would force some of the perspective angles of the original plan. 

Keeping the upper towns to a 3 foot length each, with a 2x2 180* turn of 11" radius at the end would almost get you there. The lower half is entirely doable simply with some minor compression. 

The quarry could wrap around the inside of the curve, and there's likely room for an added industry track there for flats/company boxcars, and a small loading dock to give another switching opportunity. 

The lower left end of the plan gets a small freight house and dock, perhaps one additional track leading to the right and off the front edge to simulate interchange with another railroad. This could be staging for a handful of cars both inbound and outbound, using the wooded hill to help separate it from the rest of the scene...

I kind of like the idea of a free standing 2x8 version of this set in the late 40s or early 50s, with early diesels and small steam switchers moving 40' cars. Perhaps an RDC type unit pulling a RPO for mail and basic passenger service. 

This space reserved for SpaceMouse's future presidential candidacy advertisements

  • Member since
    November 2018
  • 4 posts
Posted by Jerseysailor on Tuesday, November 22, 2022 5:32 PM

Will this plan work on a 24"wide shelf

  • Member since
    October 2010
  • 383 posts
Posted by Billwiz on Tuesday, November 29, 2022 7:54 PM

Jerseysailor
Will this plan work on a 24"wide shelf

are you looking at HO or N?

 

  • Member since
    March 2011
  • 1,950 posts
Posted by NVSRR on Wednesday, November 30, 2022 5:51 AM

I would recommend looking into industrial railroads, business parks, city trackage and water front.  Always great switching layouts to be found in any era from those areas

 

shane

A pessimist sees a dark tunnel

An optimist sees the light at the end of the tunnel

A realist sees a frieght train

An engineer sees three idiots standing on the tracks stairing blankly in space

  • Member since
    March 2011
  • 1,950 posts
Posted by NVSRR on Wednesday, November 30, 2022 5:52 AM

And I just noticed this post is from 2018

A pessimist sees a dark tunnel

An optimist sees the light at the end of the tunnel

A realist sees a frieght train

An engineer sees three idiots standing on the tracks stairing blankly in space

  • Member since
    October 2005
  • From: Central Texas
  • 365 posts
Posted by MJ4562 on Wednesday, November 30, 2022 9:28 AM

No harm done and happy mistake.  At least I enjoyed reading this thread I had never read or can't remember Big Smile.  Some advice never gets old.

SBX
  • Member since
    March 2008
  • From: Ipswich, UK
  • 122 posts
Posted by SBX on Friday, December 2, 2022 7:07 AM

This is my little N Scale switching layout 6' x 1' 2" using Kato track.

 

Long Haired David
A.K.A. David Pennington
main man on the Sunset and North Eastern R.R.
http://www.gmrblog.co.uk
from the UK

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!