Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Track overpass height

9080 views
8 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    March 2004
  • From: Eaton, Oh.
  • 11 posts
Track overpass height
Posted by RBOLIN2828 on Monday, October 15, 2012 5:20 PM

Just trying to see if i'm right. Using the NMRA standards gauge, from the top of the rails I need a 3" clearance for an overpass. Thanks in advance.

Randy

 

 

 

  • Member since
    September 2010
  • 547 posts
Posted by eaglescout on Monday, October 15, 2012 5:29 PM

I have read everything from 3 1/2 inches to slightly higher than your highest car.  I was challenged for space to keep my grade under the 4% maximum so went with 2 3/4 inches.  I believe I read that there was no prototypically standard height of tunnels and overpasses.

  • Member since
    December 2010
  • From: The place where I come from is a small town. They think so small, they use small words.
  • 1,141 posts
Posted by twcenterprises on Monday, October 15, 2012 7:25 PM

Also depends on your era.  Back in the '50s, cars weren't generally as tall, TOFC and intermodal was still in its infancy.  So you could get away with lower clearances than you would need for double-stacks and auto-racks.  Since I do model the 50's, my minimum clearance (on my branchline) will be 16 scale feet, or *about* 2-1/4 inches ... might just go 2-1/2 just to round things more evenly.  The main will probably use closer to 3", just in case I want to run an oversize load.

Brad

EMD - Every Model Different

ALCO - Always Leaking Coolant and Oil

CSX - Coal Spilling eXperts

  • Member since
    September 2003
  • From: California - moved to North Carolina 2018
  • 4,422 posts
Posted by DSchmitt on Monday, October 15, 2012 7:31 PM

eaglescout

I have read everything from 3 1/2 inches to slightly higher than your highest car.  I was challenged for space to keep my grade under the 4% maximum so went with 2 3/4 inches.  I believe I read that there was no prototypically standard height of tunnels and overpasses.

Prototype "standards" varied between the railroads.  Even in the 1930"s and before there  were lines that could not handle the tallest cars. The advent of "excess height" cars and double stacks really raised the bar.

The Western Pacific Railroad cut notches into the roof of many of their tunnels to accomodate double stacks in the Feather River Canyon.  In Niles Canyon, they lowered the grade of the track.

If you determine the height of tallest equipment you will run you can set the clearance based on that.  However,  you should have more clearence if possible, in case you want to run taller equipment in in the future, or a an oversize load.

I tried to sell my two cents worth, but no one would give me a plug nickel for it.

I don't have a leg to stand on.

  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,797 posts
Posted by hon30critter on Monday, October 15, 2012 7:42 PM

Don't forget to measure the caboose smoke jacks!

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Monday, October 15, 2012 8:21 PM

As with all planning, consider contingencies!  Is your current taste and interest likely to be locked for the duration of your layout's usefulness to you?  Is it possible that you might want to have a MOW or wrecker train?   If so, you will want more height for the boom.  As stated just above, the stacks on cabees can sometimes surprise you.  Happened to me with a True Line CPR caboose.  A catenary or double-stacks will add to the height requirement.  At full extension, a pantograph on a Trix HO  GG1 is nearly 4" off the deck!!!

Think ahead.

 

Crandell

  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Monday, October 15, 2012 9:53 PM

My minimum clearance was determined by the allowable grades, and at just under 2 1/2", won't allow certain equipment to use this wye:




Out on the mainline, the minimum is 2 3/4" and will allow most equipment to pass.  However, the loaded car shown below exceeds that limit, and is routed to avoid the obstacles:


When these cars are emptied, they're returned to the shipper via the same route, as the semi-permanent rack supporting the load must always be at the south end of the car.


Many industrial sidings have limited clearances, both at the sides and overhead.  I deliberately placed the elevated storage bins at GERN Industries so that the clearance under them is very limited.  Not only are all locos prohibited from the tracks beneath the bins, but many freight cars are also too high.  Crews need to ensure that cars to be spotted for loading meet the height restrictions, but also need to be careful when selecting idler cars to pick-up cars spotted some distance into the 220'-long siding - flats and gondolas work well, but many house cars exceed the 2 1/8" overhead restriction.


If you're regularly running tall equipment, your mainline clearances should reflect that, but don't be afraid to introduce areas elsewhere that have restrictions of some sort, as it adds operational interest.


Wayne

  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,797 posts
Posted by hon30critter on Monday, October 15, 2012 10:26 PM

Something to consider is that the upper track doesn't have to be the only track with a grade. You can put the lower track in a depression to achieve more clearance.

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    January 2001
  • From: SE Minnesota
  • 6,845 posts
Posted by jrbernier on Monday, October 15, 2012 11:26 PM

  Not sure what the NMRA gauge is set for.  I have a Mark II gauge, but there are newer ones.  The prototype has 'Plates' with similar clearance diagrams like the NMRA gauge.  I have 3" from rail to the bottom of a bridge(22 scale ft)..  Our club uses the same or better - and they run double stacks, tri-level auto racks, etc with no problems. 

  The following chart was lifted from Wikipedia(and I suspect they got it from the AAR web site):

PlateWidthHeightTruck centersComments
B 10 ft 8 in 3.25 m 15 ft 2 in 4.62 m 41 ft 3 in 12.57 m For longer truck centers, the width is decreased according to graph AAR Plate B-1.
C 10 ft 8 in 3.25 m 15 ft 6 in 4.72 m 46 ft 3 in 14.10 m For longer truck centers, the width is decreased according to graph AAR Plate C-1.[21]
D 10 ft 8 in 3.25 m 15 ft 2 in 4.62 m as with Plate B, but the car cross-section is larger at the top and a little larger at the bottom.
E 10 ft 8 in 3.25 m 15 ft 9 in 4.80 m as with Plate C.
F 10 ft 8 in 3.25 m 17 ft 0 in 5.18 m as with Plate C.
H 20 ft 2 in 6.15 m e.g. Double Stacks.[23]
J 9 ft 11 38 in 3.03 m e.g. 89 ft (27.1 m) Long flatcars.[24]
K 10 ft 8 in 3.25 m 20 ft 2 in 6.15 m e.g., Autorack (road vehicles on trains).[25][26]

  As you can see, 20' 2" seems to be the maximum clearance  standard for double stacks and auto racks.  Many times model manufacturers will make their models ride higher to get more truck swing(and be able to handle sharper curves).  This will make out scale model even higher than the prototype.  For this reason, our club has a minimum clearance of 22' above the rail.

Jim

Modeling BNSF  and Milwaukee Road in SW Wisconsin

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!