Trains.com

track nails

968 views
7 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    July 2006
  • 40 posts
track nails
Posted by usher40351 on Tuesday, April 21, 2009 9:44 PM

what size track nails for O27 track to nail down to ply wood table.

  • Member since
    March 2004
  • From: Jelloway Creek, OH - Elv. 1100
  • 7,578 posts
Posted by Buckeye Riveter on Tuesday, April 21, 2009 9:58 PM

usher40351

what size track nails for O27 track to nail down to ply wood table.

From experience, I would suggest you not use nails to attach track to just about anything.   For example, if you are using the traditional O27 track with metal ties, one hard whack with the hammer can easily bend the tie and pull the track out of gage.  Your next posting would then be titled, "Can't figure out why train derails."  

Screws are the preferred method for attaching track to wood or foam.  The length depends on tie thickness and if there is roadbed beneath the track.  Generally speaking the screw would not need to be embedded into the wood more than 1/4 inch. 

By the way, I use wood deck screws to attach my MTH Realtrax to two inch foam.

Celebrating 18 years on the CTT Forum. Smile, Wink & Grin

Buckeye Riveter......... OTTS Charter Member, a Roseyville Raider and a member of the CTT Forum since 2004..

Jelloway Creek, OH - ELV 1,100 - Home of the Baltimore, Ohio & Wabash RR

TCA 09-64284

  • Member since
    November 2006
  • From: USA
  • 1,247 posts
Posted by Ole Timer on Wednesday, April 22, 2009 8:08 AM

 I totally agree with Buckeye ... there's no way to regulate the pressure on the track with nails .... plus you may end up with humpty bumps in your track .... uneven heights . Who knows you may want to move some also ... how would one get nails back out safely without ruining or breakng your track .   Sign - Oops

       LIFETIME MEMBER === DAV === DISABLED AMERICAN VETERANS STEAM ENGINES RULE ++++ CAB FORWARDS and SHAYS
  • Member since
    March 2004
  • From: Over the Rainbow!
  • 760 posts
Posted by eZAK on Wednesday, April 22, 2009 8:41 AM

usher40351

I use #4 flat head wood screws with Gargraves track.

They come in 1/2" & 3/4" long. Also in pan head.

Use the 3/4" if you have road bed.

Pre-drill for easy install!

Relax, Don't Worry, Have a Home Brew!</font id="size2"> Pat Zak</font id="size3">
  • Member since
    February 2008
  • 554 posts
Posted by runtime on Wednesday, April 22, 2009 1:19 PM

I use screws for securing 031 profile tubular track, however I've used small flathead brads (maybe #19 or #18 1 1/4"? don't remember) to secure Gargraves track with wood ties over cork roadbed.

 I used a small tack hammer to start the nail, while above the track surface, then used a nail set to finish driving. This nearly eliminates the likelyhood of hitting the track. ...Haven't tried removal, but should be possible to pry up via the tie.

  • Member since
    December 2001
  • From: Austin, TX
  • 10,096 posts
Posted by lionelsoni on Wednesday, April 22, 2009 5:27 PM

I use half-inch number-4 sheet-metal screws to attach O27 tubular track directly to plywood.  I drill a 3/32-inch hole all the way through my half-inch plywood first.

Bob Nelson

  • Member since
    April 2006
  • 8,038 posts
Posted by fifedog on Friday, April 24, 2009 7:47 AM

I use Grip Rite Trim Head Square Drive #6 screws.  They have a good track bolt "look" about them, and you can easily adjust the amount of pressure.

  • Member since
    April 2007
  • From: MICH
  • 8,153 posts
Posted by sir james I on Friday, April 24, 2009 8:05 AM

For all the above reasons NO NAILS. And you only need enough screws to keep the track in place. A screw in every section is not needed.

"IT's GOOD TO BE THE KING",by Mel Brooks 

  Charter Member- Tardis Train Crew (TTC)   - Detroit3railers-  Detroit Historical society Glancy Modular trains- Charter member BTTS

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

FREE EMAIL NEWSLETTER

Get the Classic Toy Trains newsletter delivered to your inbox twice a month