Trains.com

Amtrak lateness costs millions in labor expensess

1750 views
9 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2018
  • 865 posts
Posted by JPS1 on Friday, October 25, 2019 12:25 PM

Overmod
 I notice that so far no one has mentioned the cost of lateness to the crews themselves, and to their effective morale and sense of professionalism.  

I know three of the San Antonio based Amtrak conductors reasonably well.  They usually work the Texas Eagle between San Antonio and Fort Worth, although one of them is qualified to work the Sunset Limited between San Antonio and Alpine.

They have stopped making excuses for the late running Texas Eagle.  Two of them have told me that they are just hanging on for retirement.  One even changed his assignment so that he could qualify for a few more retirement dollars. 

  • Member since
    September 2017
  • 5,547 posts
Posted by charlie hebdo on Friday, October 25, 2019 9:40 AM

Reducing the need for so much usage of on-call personnel outside the NEC would reduce labor costs $11.5 million.  The largest cost center impacted is LD service. If OTP were improved by 5%, annual savings on LD would be $6.9 MIL.  NEC savings only $2.8 MIL. Ditto with state corridors. 

  • Member since
    September 2003
  • 21,355 posts
Posted by Overmod on Friday, October 25, 2019 5:25 AM

BaltACD
My experience indicates that Amtrak crew management operates in their own little world that has very little contact with the real world.

I notice that so far no one has mentioned the cost of lateness to the crews themselves, and to their effective morale and sense of professionalism.  That probably has an ultimate 'dollar cost' but it would be difficult at best to fairly calculate it -- but I do think that an OIG report on the effect of the lateness (which may be at least in part intended to get Congressional or staff attention focused on the likely 'causes') both could and should have included some mention of it.

  • Member since
    May 2003
  • From: US
  • 24,939 posts
Posted by BaltACD on Thursday, October 24, 2019 7:31 PM

Deggesty
We were more than two hours late leaving Chicago, and we lost more time because we had lost our slot. The Conductor boarded in Lincoln told me that he had been called for the usual time, and he indicated that he thought he should have been called for a later time.

My experience indicates that Amtrak crew management operates in their own little world that has very little contact with the real world.

Never too old to have a happy childhood!

              

  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Thursday, October 24, 2019 4:45 PM

We were more than two hours late leaving Chicago, and we lost more time because we had lost our slot. The Conductor boarded in Lincoln told me that he had been called for the usual time, and he indicated that he thought he should have been called for a later time.

Johnny

  • Member since
    May 2003
  • From: US
  • 24,939 posts
Posted by BaltACD on Thursday, October 24, 2019 3:37 PM

Deggesty
It is not just overtime for on board service crews that increases the cost for late trains; at times it has been necessary for operating crews to be relieved on the way. 

Two notable examples in my traveling experience--on one ocassion #5 was held in Chicago for more than two hours because #49 and #29 did not arrive in Chicago until about four in the afternoon--and the caller in Lincoln called the westbound crew for the regular time and they ran out of time in western Nebraska (RR error). The other example was, perhaps, unavoidable when the BNSF dispatcher stopped us (I do not remember for how long) in western Nebraska because of high winds. When the winds died down, a relief crew--who were not qualified to operate east of Denver--and pilots were brought out by the BNSF so we could get to Denver. Altogether, we were about 12 hours late arriving in Salt Lake CIty; I do not know how late the arrival in Emeryville was.

Most Amtrak crews on their long distance network are 'nominaly' assigned crews, having bid in particular assignments.  As such, those assignments have designated 'show up' times for the crews to go on duty at a location that is based upon the train's scheduled arrival and/or departure time.  Personnel on such assignments do not get 'called' for their jobs - they show up at the designated place and time.

Amtrak Crew Management, even when they are in possession of information detailing the lateness or a train, are reluctant to notify the crew and 'set back' their on duty time - there is a specific time frame that assigned crews must be notified of the change to their on duty time - such notification windows are on the order of 2 or 3 hours BEFORE the assigned On Duty time.  In many cases, the delay to the train happens AFTER the time when the assignment can have their On Duty time changed.

Never too old to have a happy childhood!

              

  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Thursday, October 24, 2019 2:32 PM

It is not just overtime for on board service crews that increases the cost for late trains; at times it has been necessary for operating crews to be relieved on the way. 

Two notable examples in my traveling experience--on one ocassion #5 was held in Chicago for more than two hours because #49 and #29 did not arrive in Chicago until about four in the afternoon--and the caller in Lincoln called the westbound crew for the regular time and they ran out of time in western Nebraska (RR error). The other example was, perhaps, unavoidable when the BNSF dispatcher stopped us (I do not remember for how long) in western Nebraska because of high winds. When the winds died down, a relief crew--who were not qualified to operate east of Denver--and pilots were brought out by the BNSF so we could get to Denver. Altogether, we were about 12 hours late arriving in Salt Lake CIty; I do not know how late the arrival in Emeryville was.

Johnny

  • Member since
    September 2017
  • 5,547 posts
Posted by charlie hebdo on Thursday, October 24, 2019 1:43 PM

Not to conclude to any conspiracies  or causal relationships, but... If you read the OIG link,  there were a lot of extra labor charges due to late trains,  especially the LD services. "Follow the money" is often useful when searching for a major motivating factor

  • Member since
    September 2003
  • 21,355 posts
Posted by Overmod on Thursday, October 24, 2019 11:07 AM

Direct link to the OIG report page, with download link at the bottom.

https://amtrakoig.gov/audit-documents/audit-reports/train-operations-better-estimates-needed-financial-impacts-poor-time

Similar page for the 2018 Amtrak Management Challenges report.

https://amtrakoig.gov/other-audit-correspondence/amtrak-oig-releases-2018-management-challenges-report

Neither of these links can be embedded in a Kalmbach post.

  • Member since
    September 2017
  • 5,547 posts
Amtrak lateness costs millions in labor expensess
Posted by charlie hebdo on Thursday, October 24, 2019 10:46 AM

https://usa.streetsblog.org/2019/10/23/amtraks-late-running-trains-cost-system-millions/

Amtrak could save $41.9 MIL annually if it's LD trains were on-time 75% of the time. 

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy