Deggesty#5 left Glenwood Springs at 9:49 last night (7:56 late) and arrived in Salt Lake City at 6:52 this morning (7:47 late). It is expected to arrive in Sacaramento at 7:19 this evening (5:06 late).
As posted elsewhere:
http://journalstar.com/news/local/911/police-teens-killed-in-crash-with-train-went-around-crossing/article_efb279cd-dc73-5183-8801-637ce6a96c3c.html
Deggesty #5 left Glenwood Springs at 9:49 last night (7:56 late) and arrived in Salt Lake City at 6:52 this morning (7:47 late). It is expected to arrive in Sacaramento at 7:19 this evening (5:06 late).
#5 left Glenwood Springs at 9:49 last night (7:56 late) and arrived in Salt Lake City at 6:52 this morning (7:47 late). It is expected to arrive in Sacaramento at 7:19 this evening (5:06 late).
Johnny
Looks like somebody figured out a quick way to bring it down.
Hey, can you imagine the light show there might have been if there were electrified third rails down there?
Another "Oh S--T!" Moment. Good thing no train was there or approaching.
blue streak 1Portion of obsolete bridge being demolished collapses onto 2 UP tracks that may delay both Cal Zs http://www.postindependent.com/bridge/portion-of-old-bridge-collapses/
http://www.postindependent.com/bridge/portion-of-old-bridge-collapses/
Sounds as if the bridge pier may have been structurally deficient, internally and not visible to exterior inspection. Or the contractors placed stresses on it that it was not designed to handle.
Never too old to have a happy childhood!
Portion of obsolete bridge being demolished collapses onto 2 UP tracks that may delay both Cal Zs
Our community is FREE to join. To participate you must either login or register for an account.