Trains.com

Borrowed power on the Coast Starlight

1471 views
4 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    March 2011
  • From: Klamath Falls, Oregon
  • 274 posts
Borrowed power on the Coast Starlight
Posted by oregon shay on Friday, November 13, 2015 6:03 PM

When Amtrak uses additional power, like from the Union Pacific as seen in the following images, is the Amtrak engineer or a UP engineer (or both) in the lead locomotive?

Bringing-up the rear on today's northbound train was the private car Cyrus K. Holliday, which was cool.

- Wilton.

 

  • Member since
    May 2012
  • 4,978 posts
Posted by rcdrye on Saturday, November 14, 2015 7:33 AM

Amtrak crews routinely operate borrowed power on routes that they are otherwise qualified to operate.  In the case of an offline detour, a qualified employee of the detour host will be assigned as a pilot.

  • Member since
    November 2014
  • 245 posts
Posted by ORNHOO on Sunday, November 15, 2015 12:25 AM
For some time I have been wondering when Distributed Power would be applied to passenger trains. The primary reason would be to eliminate the need for the "hard wired" connection between the Locomotive and Cab Car on push-pull trains, but it also would be useful in rescue operations like on November 10 when Surfliner 777's entire consist was used to pull the Coast Starlight (hors de combat from a vehicle strike) from SLO to LAX. With DP the one working locomotive on #11 could have been operated from #777's cab.
  • Member since
    May 2003
  • From: US
  • 24,937 posts
Posted by BaltACD on Sunday, November 15, 2015 2:02 AM

ORNHOO
For some time I have been wondering when Distributed Power would be applied to passenger trains. The primary reason would be to eliminate the need for the "hard wired" connection between the Locomotive and Cab Car on push-pull trains, but it also would be useful in rescue operations like on November 10 when Surfliner 777's entire consist was used to pull the Coast Starlight (hors de combat from a vehicle strike) from SLO to LAX. With DP the one working locomotive on #11 could have been operated from #777's cab.

Don't hold your breath for DP in passenger operations.  In freight opeations it helps move more tonnage per train.  In passenger operations there isn't the necessity for DP to be able to move more paying passengers.  Oddball instances because of operational incidents does not generate a economic need for DP in passenger service.

Never too old to have a happy childhood!

              

  • Member since
    March 2011
  • From: Klamath Falls, Oregon
  • 274 posts
Posted by oregon shay on Monday, November 23, 2015 4:17 PM

Thanks for the insights.

 

-Wilton.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy