Wizlish That sound a bit like those trains in the North American Joint PTC project that featured zero length in block... Glad to see it wasn't just programmers who could forget stuff... I get the impression from the IRJ story that the "24 trains per hour" were the peak capacity for both bores together; 12 trains per hour presumably with CBTC in each bore. I do not know if that is assuming passenger trains running at the stated 125 mph speed... which would cut down the effective 'dwell time' of even a long consist to a few seconds each.
I get the impression from the IRJ story that the "24 trains per hour" were the peak capacity for both bores together; 12 trains per hour presumably with CBTC in each bore. I do not know if that is assuming passenger trains running at the stated 125 mph speed... which would cut down the effective 'dwell time' of even a long consist to a few seconds each.
I guess I agree, especially since this line handles both freight and passenger trains. Perhaps the freights are 'fleeted' and/or run at night. Where are our European correspondents when you need them?
Links to my Google Maps ---> Sunset Route overview, SoCal metro, Yuma sub, Gila sub, SR east of Tucson, BNSF Northern Transcon and Southern Transcon *** Why you should support Ukraine! ***
Kevin C. SmithThe PRR stated that the peak capacity of each Hudson River tunnel was 72 trains/hour (or one every 41.5 seconds).
That sound a bit like those trains in the North American Joint PTC project that featured zero length in block... Glad to see it wasn't just programmers who could forget stuff...
MikeF90 One quote from the article: "The tunnel will allow the number of trains to be increased from four to 24 per hour ..." Could this be a misprint? I'm thinking 'per day' might be correct.
One quote from the article: "The tunnel will allow the number of trains to be increased from four to 24 per hour ..."
Could this be a misprint? I'm thinking 'per day' might be correct.
Link says costs over $1.25B US dollars of over 5 times original cost estimate. And we think only USA subject to cost over runs.
If you replace a single track with heavy grades and curves with a shorter double track tangent, a six-fold increase in capacity is well within the realm of possibility.
Also, consider the JR-Central Chu-O Nishi Hon Sen, parts of which are single track with curves and heavy grades. It carries only two local and one express passenger trains per hour in each direction.
Part of the confusion stems from the idea of, "What is a train." Americans tend to think in terms of a mile and a half of freight cars ambling along behind the motive power. In most places, trains are much shorter - and much faster.
Chuck
The Wikipedia article goes into more detail about the 'environmental issues'. Apparently the contractor used a sealant that was toxic and it seeped into the water table. Oops. Sounds like a very challenging tunnel to build, like the very unheralded Inland Feeder aqueduct project; that one took 12 years to complete.
Napoleon didn't start the war.
Patrick Boylan
Free yacht rides, 27' sailboat, zip code 19114 Delaware River, get great Delair bridge photos from the river. Send me a private message
The article refers to twin bores, so there is also a second tunnel parallel to the one in the picture. I don't recall if the article said indicated if they were being bored concurrently or consecutively.
But the time lag is minimal; the Channel Tunnel between England and France had something like 200 years between the first tentative starts and the final completion! One or two wars intervened, of course, starting with Napoleon.
Looking at the picture, that is one wide tunnel.
Buslist blue streak 1 Sweden has taken 33+ years to complete a rail tunnel for 200 Km passeger and freight bypass. http://www.railjournal.com/index.php/europe/swedens-hallandsas-rail-tunnel-finally-completed.html?channel=537 its 23 not 33 and work was suspended for 8.
blue streak 1 Sweden has taken 33+ years to complete a rail tunnel for 200 Km passeger and freight bypass. http://www.railjournal.com/index.php/europe/swedens-hallandsas-rail-tunnel-finally-completed.html?channel=537
Sweden has taken 33+ years to complete a rail tunnel for 200 Km passeger and freight bypass.
http://www.railjournal.com/index.php/europe/swedens-hallandsas-rail-tunnel-finally-completed.html?channel=537
its 23 not 33 and work was suspended for 8.
That is still 15 years of activity to complete the project.
Never too old to have a happy childhood!
Sweden has taken 23+ years to complete a rail tunnel for 200 Km passeger and freight bypass.
Corrected my typo