Trains.com

MBTA suspends all service for a day

2170 views
8 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    June 2002
  • 20,096 posts
Posted by daveklepper on Sunday, February 22, 2015 2:15 AM

The waits are long and the service is “limited,” but Friday will see the opening of several more MBTA stations, including the Green Line’s E branch and the Red Line’s North Quincy stop, as the service continues its efforts to get back on track.

The E branch rollout had some issues, though. Service between Brigham Circle and Heath Street was suspended just before 7:30 a.m. due to street-level traffic. The trolley service returned by mid-day.

Here’s what’s open:

 

Orange Line

Open.

Blue Line

Open.

Red Line

Trains are running from Alewife to Ashmont. The North Quincy station has opened on the Braintree line, which should be fully restored by Monday. But the Mattapan trolley is still the Mattapan shuttle until next Friday, February 27.

Green Line

Good news! The E branch is now open (albeit temporarily with suspended service). Bad news! The B branch is not. Meh news! The B branch replacement shuttle runs from Boston College to Kenmore. Before, you had to take the shuttle to Packards Corner and then the Route 57 bus from Packards Corner to Kenmore.

Commuter Rail

“Modified weekly schedule,” which, according to reports from various frustrated passengers, includes last-minute cancellations and numerous lengthy delays. Keolis, which operates the MBTA’s commuter lines, did not respond to request for comment.

  • Member since
    June 2002
  • 20,096 posts
Posted by daveklepper on Tuesday, February 17, 2015 6:44 AM

REPORT ON TUESDAY, 16 FEBRUARY, BOSTON GLOBE BLOGף

Commuters headed to work on Tuesday after a ridiculous amount of snow over the holiday weekend (with another several inches expected overnight) will have limited T service to assist them in their travels, though some will have to use shuttle buses and it is likely everyone will experience delays.

Here’s the latest on where the trains are running, according to the MBTA website:

Red Line

Trains are running between Alewife and Andrew Stations “about every six to seven minutes.” South of Andrews, riders will have to rely on a “limited bus replacement service” for both the Ashmont and Braintree branches.

Orange Line

Service between Back Bay and Sullivan Square, with trains expected about every 12 minutes. South of Back Bay and north of Sullivan, it’s the shuttles.

Blue Line

The magical beast known as “the blue line” will be running in its entirety, with trains arriving every seven to eight minutes.

Green Line

Lechmere to Kenmore is open. Trains between North Station and Kenmore are operating every five to six minutes (there was no information on how often trains from North Station to Lechmere will run).

For the B branch, the Route 57 bus will make stops between Packards Corner and Kenmore. Abandon all hope, ye who live west of Packards Corner, as there will be “no bus service” there.

The C branch will have shuttle buses between Cleveland Circle and Kenmore.

E branch riders will have to use the Route 39 bus between Heath and Northeastern.

D branch riders have won the green line lottery, with “limited trolley service” along the entire route.

Commuter Rail

Will operate on a “modified weekday schedule” that is expected to include “significant delays and several canceled trips.”

Buses

On a weekday schedule, but expect delays because the roads are just awful.

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Friday, February 13, 2015 7:26 PM

Now MBTA suspending all service including bus on Sunday. Anyone know if this will cancel Downeaster and LSL ?

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Thursday, February 12, 2015 6:05 PM

Questions that probably have been answered before.

1.  How many subway lines are DC traction ?

2.  Some reports that the new Blue line cars are AC ?

3.  The older commuter rail locos are what type traction ?  Are the new locos AC ?

One would think that a priority for any snow belt commuter rail  and  subway is to replace DC traction as fast as possible.

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Thursday, February 12, 2015 4:29 PM
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Tuesday, February 10, 2015 5:26 PM

Over reaction to the red line stall ?  Certainly could have operated the underground portions.  Amtrak did operate most of their BOS NEC trains today with some delays but not as bad as this poster would have guessed.  Even Acela operated.

  • Member since
    November 2013
  • 1,097 posts
Posted by Buslist on Tuesday, February 10, 2015 1:11 PM

I'll have to say that given the conditions on the roads and the airport the shut down seems like a wimp out!

  • Member since
    October 2006
  • From: Under The Streets of Los Angeles
  • 1,150 posts
Posted by Metro Red Line on Tuesday, February 10, 2015 4:40 AM

Buslist

MBTA suspends all service for a day Tuesday 2/10, didn't think it was that bad out, commuter rail lines appeared clear.

 

 

http://www.mbta.com/rider_tools/transit_updates/?ttype=cr&route=Fitchburg%2FSouth+Acton+Line

 

The T will be running these trains, however. :)

 

  • Member since
    November 2013
  • 1,097 posts
MBTA suspends all service for a day
Posted by Buslist on Monday, February 9, 2015 8:05 PM

MBTA suspends all service for a day Tuesday 2/10, didn't think it was that bad out, commuter rail lines appeared clear.

 

http://www.mbta.com/rider_tools/transit_updates/?ttype=cr&route=Fitchburg%2FSouth+Acton+Line

 

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy