BAFT announces preliminary planning for a second tube. First look appears to be very far reaching. Includinf lookig at possibility of making it both BARTguage and standard guage for Caltrain and Capitol Corridor. Would give possible 24 hour service through one tube.
https://www.bart.gov/news/articles/2018/news20181114-0
blue streak 1 Includinf lookig at possibility of making it both BARTguage and standard guage for Caltrain and Capitol Corridor.
Includinf lookig at possibility of making it both BARTguage and standard guage for Caltrain and Capitol Corridor.
Shades of the Sacramento Northern service via the Bay Bridge!
I'm wondering what the plan is for supporting two guages - one track for standard and one for broad? Or a pair of dual gauge tracks? Making the BART connection on both sides would be a challenge as well.
Our community is FREE to join. To participate you must either login or register for an account.