Trains.com

Short Term Ratings on Electrics

964 views
1 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,485 posts
Short Term Ratings on Electrics
Posted by CSSHEGEWISCH on Friday, June 19, 2009 10:03 AM

Electric locomotives have a continuous HP rating and various higher short-term HP ratings based on the ability of the electrical system to withstand the abuse.  Is there a rule-of-thumb formula that can roughly calculate a short-term rating as a percentage over the continuous rating? 

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    December 2001
  • From: NW Wisconsin
  • 3,857 posts
Posted by beaulieu on Friday, June 19, 2009 11:24 AM

Most current European electrics quote a "One-hour" rating, as well as a continuous rating. But I don't see consistancy in the overload factor between the two that I know. The Siemens Eurosprinters have a continuous rating that is much closer to the "One-hour" rating. I suspect that this is their choice to provide a cooling capacity allowing continuous operation much closer to the absolute capacity of the electrical equipment. 

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy