Trains.com

Genset usage today and future

1419 views
3 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    November 2003
  • From: Rhode Island
  • 2,289 posts
Posted by carnej1 on Wednesday, October 1, 2008 11:55 AM
 From what I've read there a number of cases where Gensets are being utilized in local freight service as well as in yard switching. "The Next Generation GP's" are a mix of genset and new build/repowered rebuild single engine units. It's interesting to me that while there are just the "BIG 2" locomotive builders offering AC and DC motored 4300-4400HP offerings there is such a wide number of builders offering a wide variety of intermediate to low HP power right now...

"I Often Dream of Trains"-From the Album of the Same Name by Robyn Hitchcock

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Wednesday, October 1, 2008 10:06 AM
Gensets with their variable HP will prove especially useful in switching, transfers, local freights, etc.  The horsepower will adjust to fit the job requirement:  A genset may need a full 2000 HP for a local freight on one day and less on a day when traffic is lighter; since most transfer runs are loaded one way and return light, a genset would shine in this sort of service, 2000 HP under load and only 700 HP when returning light.  The fuel savings will be sizable.
The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    January 2007
  • From: Mobile Alabama
  • 694 posts
Posted by carknocker1 on Wednesday, October 1, 2008 7:32 AM
From what I read They can , once the train is moving the amount of power needed is less , They should become the next locomotive however they are designed for yard work and local switching , in cities to cut down on pollution . I would think more invations will be needed to make them sucessful road power ,
  • Member since
    July 2006
  • 16 posts
Genset usage today and future
Posted by jpwhawaii on Tuesday, September 30, 2008 4:14 PM
I was just curious after reading the GP longevity post earlier, can gensets use 2000 hp to start a train and then shut down 2 power units to pull the train, lets say on relatively flat trackage? If they can't today, will they be able to in the future and will they then be able to become the next generation GP's?

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy