- Member since
March 2016
- From: Burbank IL (near Clearing)
-
13,540 posts
|
When the AC electrification was completed, P5's were used on the Congressional. Problems with the P5's led to the investigation and tests that led to the development of the GG1.
The daily commute is part of everyday life but I get two rides a day out of it.
Paul
|