If I remember correctly, back in the late 50's or early 60's my family rode the Silver Meteor from Jacksonville to Washington. As I recall when the train made its station stop at Columbia there were multiple vendors on the platform selling peaches.
Never too old to have a happy childhood!
Hopefully there are ongoing talks with the railroads involved and they have a professionally qualified consultant on-board. If the estimate is coming from a non-railroad civil professional (rubber-tired bubbas), those estimates could be way off.
120 years of doing zilch in a growing area? Telling.
Following pure political talk. Lot of words but not much substance or plans. Lot of talk about SW portion needing track elimination. That may be all way to Cayce . Many years ago the SAL tressel thru near downtown removed with moving Amtrak station. One item will be inability to remove horse shoe around the approach end of RW27 at CAE airport.
Columbia to launch railroad realignment and removal project (msn.com)
Our community is FREE to join. To participate you must either login or register for an account.