Years ago I recall seeing an article somewhere (perhaps in TRAINS) that showed two rail lines, from different railroads, merging in order to fit over a bridge that wasn't quite wide enough for two -- there were no switches involved, just a cross over so one of the rails for the first line was within the footprint of the second line. Anyone know of any remaining prototype examples of this? Can you direct me as to where I can see photos or examples? Thanks much!
I think that is called ganlet rail and I have never heard of it for two railroads usually it is the same railroad using a single track bridge on approach with double track. Last I heard of it's use was with the South Shore Line crash on one of it's bridges that used it, I think since that time SS line replaced the bridge with double track.
https://www.chicagotribune.com/news/ct-xpm-1993-01-19-9303170373-story.html
It's also used for passenger stations when they want through traffic to clear the platform more than traffic stopping at the station where they want the passenger train close to the platform for boarding.
https://youtu.be/TAlGh5xq7gs
There was a thread on this not long ago.
Such arrangements are known as gantlet, or gauntlet, tracks. Both terms are acceptable.
http://cs.trains.com/trn/f/111/t/288993.aspx?page=2#3355992
Larry Resident Microferroequinologist (at least at my house) Everyone goes home; Safety begins with you My Opinion. Standard Disclaimers Apply. No Expiration Date Come ride the rails with me! There's one thing about humility - the moment you think you've got it, you've lost it...
I'm guessing gantlet is the actual correct term, but people have always said gauntlet and it's mostly taken over.
Lots of bridges had gantlet tracks, but offhand I don't think of a bridge with a gantlet for two RRs.
Our community is FREE to join. To participate you must either login or register for an account.