Posted by alphas on Saturday, August 17, 2019 12:16 PM

Approximately 30 years ago, PA established a Rail Commision to look into HSR from Pilly to Pittsburgh.   [I worked under its Chairman later in my university position.]   It eventually was established that it wouldn't work due to (1) the on-going loss of population in Pittsburgh and (2) every state politican along the line wanted a stop in his/her district so HSR would have been a HS local!  [Sound familiar CA?]

Anyway, he did tell me that if HSR would ever occur in the east other than NYC-DC which he felt was a "given", he believed the best would probably be a HSR from NYC-Philly-Pitt-Columbus-Indianapolis-Chicago with possibly a HSR connection to St. Louis from Indy.    His thinking was that the majority of the HSR passengers would probably not be traveling the entire distance since the HSR couldn't compete with the jet airplane.   He visualized something like 8-9 hour service from NYC to Chicago but shorter distances would be favored over plane travel (examples: approx. 1 hour or so Pitt-Col. and Col.-Indy).    The in-between stops would have been Newark, Philly, Harrisburg, Pitt, Columbus, and Indy.    Possibly it would work if some of the HSR trains would take longer with other stops: Lancaster, Altoona, Dayton, Richmond, and around Lafayette were possibilities he mentioned. 

The interesting thing is that though the commission was made up of rail enthusists and was under pressure from outside interests who wanted it, they did reject the idea as too expensive and impractical.    He told me he felt the idea was "20 years too late or maybe 20 years too early".     

  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Saturday, August 17, 2019 10:30 AM

Yes, indeed, it used toi be.... M/ mother,  who went to a girls' school in Northfield, Massachusetts, in the teens, once told me that back then it was possible to ride all over New England for a nickel if you knew where to transfer. (Of course, she did not mean up into northern Maine.) 

Johnny

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Saturday, August 17, 2019 9:45 AM

Thinking of this thread topic  in the context of "the way it used to be"....I noticed a parallel with the interurbans. I recall as a child passing by derelict infrastructure that once was core to that industry's operation. Of course as someone who had never seen the interurbans operate...a lot of it did not make complete sense. I had to spend a few years learning what an interurban was, before "what it no longer was" started to make complete sense.

I think the same can be true in regard to the current freight railroads with their shift away from a customer intensive (team tracks, freighthouses, passenger service, etc) business model, to their current preference for long haul to the point they have disdain for anything  strictly local.

  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Thursday, August 15, 2019 10:52 AM

The east end of four tracks out of Chicago was before Clarke Junction (crossing of the B&OCT), I believe, at the west end of Gary.

This is the sad part of the tale: through Gary, the number of tracks on this line is now down to zero.  There's still a crossing in the pavement at Clark Road, but no tracks on either side of it.  This would probably be the last glimpse that people on the Broadway and 20th Century Limited would have had of each other in the race out of Englewood (at this grade crossing--intervening growth would preclude much of it).

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Wednesday, August 14, 2019 6:14 PM

timz
East end of four tracks was ... Hobart? Tolleston?

You're most likely correct, but it "puffed back up" to 4 tracks again in other locations to the east.

The area I was speaking of would be thru Fort Wayne between 'Junction' and 'Mike'.  20 years ago I walked the whole thing, east past Mike all the way to what was then the Triple crown yard.....And the thing that struck me most notable was all the line side industrial buildings that had "dock hi" doors all along the side of the facing buildings....that  were a good 50-60 feet away from the single remaining main. All those sidings just gone. Of course many of the buildings were long empty as well. But at one time I'm sure it was quite a spectacle.

It's too bad that when I was younger I didn't realize that I was living  through the end of an era.....or I would have paid  better attention.  Dunce

  • Member since
    August 2019
  • 3 posts
Posted by gesparky on Wednesday, August 14, 2019 5:07 PM

The NS is still running several trains thru Bucyrus on this line. They updated the signals for PTC at Colsan. Mostly oil trains west of Bucyrus. But they do run some mixed freight. They use the Y in Bucyrus to go east off the NS mainline. They also use it for trains coming from the east on the NS mainline. I live close to the NS main so I keep an eye on it daily

  • Member since
    May 2003
  • From: US
  • 24,919 posts
Posted by BaltACD on Wednesday, August 14, 2019 3:26 PM

Electroliner 1935
I believe the B&O had a bascule bridge north of and adjcent to the four PRR/NYC lift bridges. 

Also the former PRR main line east of Inianapolis IN was double track cab signaled all the way to Pittsburgh. Except for the passenger route through Dayton from East of Richmond IN to Xenia OH which was single track and freight mostly went via Urbana OH. This also had heavy (156#) rail. Almost all gone except for Ohio Cemtal East of Columbus. 

From my experiences of riding the B&O into and out of Chicago and seeing the drawbridges in the area, as well as working in Cleveland and all the various bridges over the Cuyahoga River - when I went South and saw what were being used as drawbridge along the ACL & SCL routes - they looked like 'Tinkertoys'. 

Never too old to have a happy childhood!

              

  • Member since
    September 2017
  • 5,527 posts
Posted by charlie hebdo on Wednesday, August 14, 2019 2:36 PM

The Deutsche Bahn uses a mixture of existing stretches, rebuilt stretches, new high speed track next to existing track and totally new stretches, such as from Frankfurt Airport to Koeln. Seems to work well enough for their ICEs. 

  • Member since
    September 2010
  • 2,515 posts
Posted by Electroliner 1935 on Wednesday, August 14, 2019 2:24 PM

I believe the B&O had a bascule bridge north of and adjcent to the four PRR/NYC lift bridges. 

Also the former PRR main line east of Inianapolis IN was double track cab signaled all the way to Pittsburgh. Except for the passenger route through Dayton from East of Richmond IN to Xenia OH which was single track and freight mostly went via Urbana OH. This also had heavy (156#) rail. Almost all gone except for Ohio Cemtal East of Columbus. 

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,470 posts
Posted by CSSHEGEWISCH on Wednesday, August 14, 2019 1:51 PM

They may have continued to near Englewood.  There were four parallel double track vertical lift bridges over the Calumet River at one time.  One has since been removed and two are out of service.

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    February 2005
  • 2,321 posts
Posted by timz on Wednesday, August 14, 2019 1:26 PM

[

Convicted One
there were 4 mains (two freight, two passenger) plus sidings, and now seeing only one rickety main
East end of four tracks was ... Hobart? Tolleston? (Whiting, it turns out. Two mains from there to Bucyrus; two mains to Crestline in the 1939 timetable, which says the extra tracks in Ft Wayne were sidings.)

  • Member since
    September 2014
  • 133 posts
Posted by JOHN PRIVARA on Wednesday, August 14, 2019 11:39 AM

I've always liked playing "connect the dots" with historic routes, but the Europeans, Japanese, and Chinese don't do HSR this way. It's all new, due to curves and grade-crossings.

But, if you want to adjust your fantasy machine a bit, you can play "connect the dots" with historic routes and simply assume a maximum speed of around 110 (this would be roughly what European regional services run at on their historic routes). Then, mix in new HSR routes into your fantasy and you've got a nice modern passenger rail system.

Of course, you can always tweak the fantasy with the assumption of increased gravity which renders air travel more expensive (impossible!) plus something which renders automobiles unusable and THEN you can start running the Broadway and 20th Century on the 110 mph historic routes (complete with new Budd built stainless steel equipment, and even the Riley - assuming that route still exists). Yeah, the ol' fantasy machine can be used for lots of purposes...)

  • Member since
    January 2001
  • From: MP CF161.6 NS's New Castle District in NE Indiana
  • 2,145 posts
Posted by rrnut282 on Wednesday, August 14, 2019 11:30 AM

Deggesty

The PRR had a line from Pittsburgh to St. Louia that went through Columbus and Indianapolis.

In October of 1971, I rode over it from Pittsburgh to Indianapolis and from Terre Haute to St. Louis--Conrail had already switched the traffic from Indianapolis to Terre Haute to the former NYC; the PRR line here no longer exists west of Davis (just west of Indianapolis).

 

IINM, PC used half of the NYC Indy-STL route and half of the PRR Indy-STL route when they consolodated the two lines into one.  

Mike (2-8-2)
  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Wednesday, August 14, 2019 8:06 AM

I wonder just how much traffic the CN has between Jackson and New Orleans now. When I lived beside the main, 55 miles south of Jackson, in the early sixties, the line was double track with ABS. Now, it is single track, with CTC--and only one, instead of four, passenger trains a day each way. There were three through daily freights scheduled each day, running about 180 cars each.

Johnny

  • Member since
    May 2003
  • From: US
  • 24,919 posts
Posted by BaltACD on Wednesday, August 14, 2019 7:23 AM

Convicted One
 
Los Angeles Rams Guy
I thought it was an utter travesty how CR was able to get away with downgrading the mainline west of Crestline that resulted in the elimination of the Broadway Limited 

Walking through the areas where previously there were 4 mains (two freight, two passenger) plus sidings, and now seeing only one rickety main remaining, is a solemn experience.

Which only goes to prove just how much traffic is required to make any individual rail line profitable as single track, let alone 4 tracks.

Never too old to have a happy childhood!

              

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Wednesday, August 14, 2019 6:39 AM

Los Angeles Rams Guy
I thought it was an utter travesty how CR was able to get away with downgrading the mainline west of Crestline that resulted in the elimination of the Broadway Limited

Walking through the areas where previously there were 4 mains (two freight, two passenger) plus sidings, and now seeing only one rickety main remaining, is a solemn experience.

  • Member since
    June 2007
  • From: Brooklyn Center, MN.
  • 702 posts
Posted by Los Angeles Rams Guy on Tuesday, August 13, 2019 8:07 PM

As someone who's been very interested in the former PRR Chicago - New York mainline (particularly the segment from Crestline, OH westward), I thought it was an utter travesty how CR was able to get away with downgrading the mainline west of Crestline that resulted in the elimination of the Broadway Limited.  Call me nostalgic but for me, the only way from Chicago to New York is the PRR.   

"Beating 'SC is not a matter of life or death. It's more important than that." Former UCLA Head Football Coach Red Sanders
  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Tuesday, August 13, 2019 7:20 PM

CSSHEGEWISCH

Now that the former Big Four route has been abandoned in part, the former Monon route is about all that's left between Indianapolis and Chicago and that's not even close to being the basis of a high-speed route.

 

Yes, there is now only one route left between Indianapolis and Chicago--but it is composed of bits and pieces of several roads,icluding the former NYC, PRR, Monon (this is the longest stretch), GTW, C&EI,  C&WI, and PRR (I think I got them all; the entrance into CHicago is quite involved--and slow.) This what SPV shows in its Great Lakes atlases.

 

Johnny

  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Tuesday, August 13, 2019 10:48 AM

CSSHEGEWISCH

Now that the former Big Four route has been abandoned in part, the former Monon route is about all that's left between Indianapolis and Chicago and that's not even close to being the basis of a high-speed route.

 

Yes, there is now only one route left between Indianapolis and Chicago--but it is composed of bits and pieces of several roads,icluding the former NYC, PRR, Monon (this is the longest stretch), GTW, C&EI,  C&WI, and PRR (I think I got them all; the entrance into CHicago is quite involved--and slow.) This what SPV shows in its Great Lakes atlases.

 

Johnny

  • Member since
    July 2006
  • From: KS
  • 987 posts
Posted by SFbrkmn on Tuesday, August 13, 2019 8:44 AM

Looks like its yes

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,470 posts
Posted by CSSHEGEWISCH on Tuesday, August 13, 2019 6:57 AM

Now that the former Big Four route has been abandoned in part, the former Monon route is about all that's left between Indianapolis and Chicago and that's not even close to being the basis of a high-speed route.

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    January 2001
  • From: Atlanta
  • 11,968 posts
Posted by oltmannd on Monday, August 12, 2019 9:14 PM

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    January 2001
  • From: Atlanta
  • 11,968 posts
Posted by oltmannd on Monday, August 12, 2019 9:09 PM

charlie hebdo

 

 
oltmannd

 

 
charlie hebdo

Since it's virtually unused,  this could be bought by the government  and become part of a passenger-only higher speed or full high speed line from Chicago east. 

 

 

 

It could.  Or the old Erie ROW, too.  But the problem is the route misses all the bigger population centers.

NS was running "directional" petroleum trains on the route a few years ago.  I don't know if that practice has totally stopped or not.  

 

 

 

Perhaps spurs could connect to cities it misses.  Didn't the old PRR have a line into Columbus? 

I seem to recall that the French HSR often missed major cities.  In Germany most routes use older, slower repackage into cities,  which increases time.  But in the case of Kassel,  the fast line station (Kassel-Wilhelmshoehe) was located well outside the city.

 

If you were looking to do a good "connect the dots" with available ROW, you could use the old PRR panhandle from Pittsburgh through Columbus to Indy.  From Indy to Chicago...not sure what you could grab.  I think there is a group thinking about this stuff and pushing out plans.  It might be worth hunting for.  Maybe a few years back...

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Monday, August 12, 2019 7:26 PM

 

charlie hebdo
more viable than South Bend and Toledo. 

I suspect that  Toledo gets extra weight due to it's proximity to Detroit, and (big "and" there) Cleveland/Buffalo could be a good connection point to a complimentary line to the big cities on the east coast.

I have a pretty good lead that one of those mammoth  tunnel boring machines is going to be available for sale used in a couple years. A pet fantasy of mine would be to buy that, and tunnel through  Pennsylvania to link Pittburgh to Philly with a  low slope tangent, and then lease the tunnel to a HSR operator....Making Chicago to Pittburgh more attractive.

Unfortunately in addition to all the obvious reasons why I'll never do that, I just wouldn't live long enough to see it ever bear fruit.

  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Monday, August 12, 2019 7:25 PM

The PRR had a line from Pittsburgh to St. Louia that went through Columbus and Indianapolis.

In October of 1971, I rode over it from Pittsburgh to Indianapolis and from Terre Haute to St. Louis--Conrail had already switched the traffic from Indianapolis to Terre Haute to the former NYC; the PRR line here no longer exists west of Davis (just west of Indianapolis).

Johnny

  • Member since
    September 2017
  • 5,527 posts
Posted by charlie hebdo on Monday, August 12, 2019 7:05 PM

Convicted One

 

 
charlie hebdo
Since it's virtually unused,  this could be bought by the government  and become part of a passenger-only higher speed or full high speed line from Chicago east. 

 

The line has been used in sort of a nutshell game by people making dubious claims trying to build grass roots support for a HSR line between Chicago and various points east.

Generally they present their idea, saying "we'd like to do this" (which is the former PRR line we are talking about)...then they continue by saying "of course there are options" and then they show another map which depicts the line just mentioned PLUS an alternate  route that just happens to connect Cleveland,Toledo, South Bend, and Chicago.....

The presentation wreaks just a little too much of an effort to stimulate taxpayer support in as broad an area as possible while making no tangible commitment that the line will serve any one area.

When they come around and say they are willing to commit $10 billion of their own money, and will build the line where ever they can get a taxpayer commitment to match them...then I'll start paying attention.

The guys just seem a little too much like hucksters trying to attach a siphon hose to a "public private partnership" where they draw all the pretty pictures  and control the farebox, while the taxpayer gets to do all the heavy lifting.

You need a desirable endpoint on each end of thre line to make it really work, and while I am sure Chicago qualifies, I have serious doubts that either Columbus or Pittsburgh is going to excite many private deep pockets.

So my suspicion would be that the South Bend-Toledo-Cleveland option is the one they really want to build

 

Why?  Columbus and Pittsburgh are a lot more viable than South Bend and Toledo. 

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Monday, August 12, 2019 6:45 PM

charlie hebdo
Since it's virtually unused,  this could be bought by the government  and become part of a passenger-only higher speed or full high speed line from Chicago east. 

The line has been used in sort of a nutshell game by people making dubious claims trying to build grass roots support for a HSR line between Chicago and various points east.

Generally they present their idea, saying "we'd like to do this" (which is the former PRR line we are talking about)...then they continue by saying "of course there are options" and then they show another map which depicts the line just mentioned PLUS an alternate  route that just happens to connect Cleveland,Toledo, South Bend, and Chicago.....

The presentation wreaks just a little too much of an effort to stimulate taxpayer support in as broad an area as possible while making no tangible commitment that the line will serve any one area.

When they come around and say they are willing to commit $10 billion of their own money, and will build the line where ever they can get a taxpayer commitment to match them...then I'll start paying attention.

The guys just seem a little too much like hucksters trying to attach a siphon hose to a "public private partnership" where they draw all the pretty pictures  and control the farebox, while the taxpayer gets to do all the heavy lifting.

You need a desirable endpoint on each end of thre line to make it really work, and while I am sure Chicago qualifies, I have serious doubts that either Columbus or Pittsburgh is going to excite many private deep pockets.

So my suspicion would be that the South Bend-Toledo-Cleveland option is the one they really want to build

  • Member since
    September 2017
  • 5,527 posts
Posted by charlie hebdo on Monday, August 12, 2019 5:06 PM

oltmannd

 

 
charlie hebdo

Since it's virtually unused,  this could be bought by the government  and become part of a passenger-only higher speed or full high speed line from Chicago east. 

 

 

 

It could.  Or the old Erie ROW, too.  But the problem is the route misses all the bigger population centers.

NS was running "directional" petroleum trains on the route a few years ago.  I don't know if that practice has totally stopped or not.  

 

Perhaps spurs could connect to cities it misses.  Didn't the old PRR have a line into Columbus? 

I seem to recall that the French HSR often missed major cities.  In Germany most routes use older, slower repackage into cities,  which increases time.  But in the case of Kassel,  the fast line station (Kassel-Wilhelmshoehe) was located well outside the city.

  • Member since
    January 2001
  • From: Atlanta
  • 11,968 posts
Posted by oltmannd on Monday, August 12, 2019 3:44 PM

charlie hebdo

Since it's virtually unused,  this could be bought by the government  and become part of a passenger-only higher speed or full high speed line from Chicago east. 

 

It could.  Or the old Erie ROW, too.  But the problem is the route misses all the bigger population centers.

NS was running "directional" petroleum trains on the route a few years ago.  I don't know if that practice has totally stopped or not.  

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy