Trains.com

News Wire: CN working on new operating plan to return to its 'roots'

1170 views
11 replies
1 rating 2 rating 3 rating 4 rating 5 rating
Moderator
  • Member since
    January 2011
  • From: Wisconsin
  • 1,532 posts
Posted by Brian Schmidt on Wednesday, July 18, 2018 2:43 PM

LAKE GENEVA, Wis. — Canadian National leaders are working on a new operating plan that could be unveiled as soon as this fall, says one executive. Doug MacDonald, CN's vice president of bulk products, told attendees of the Midwest Association...

http://trn.trains.com/news/news-wire/2018/07/18-executive-cn-working-on-new-operating-plan-to-return-to-its-roots

Brian Schmidt, Editor, Classic Trains magazine

  • Member since
    October 2014
  • From: Flint or Grand Rapids, Mi or Elkhart, It Depends on the day
  • 573 posts
Posted by BOB WITHORN on Wednesday, July 18, 2018 2:45 PM
Are the roots pre E.H.H. or post E.H.H. ?
  • Member since
    February 2003
  • From: Guelph, Ontario
  • 4,819 posts
Posted by Ulrich on Wednesday, July 18, 2018 3:13 PM

Sounds to me as if they got away from the precision scheduled model and want to go back to that.. so back to EHH and his ideas. They need to do something.. their main competitor, CP, is no longer a sleepy pussycat but a raging ferocious tiger. 

  • Member since
    December 2001
  • From: Northern New York
  • 25,021 posts
Posted by tree68 on Wednesday, July 18, 2018 3:38 PM

If they're doing a lot of hiring, I would opine that they found that lean and mean wasn't doing the trick.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    September 2017
  • 5,636 posts
Posted by charlie hebdo on Wednesday, July 18, 2018 3:52 PM

Ulrich

Sounds to me as if they got away from the precision scheduled model and want to go back to that.. so back to EHH and his ideas. They need to do something.. their main competitor, CP, is no longer a sleepy pussycat but a raging ferocious tiger. 

 

I think you are right. 

McDonald:  "We are not the scheduled railway we used to be and a lot of that is because of the infrastructure issues we have."

  • Member since
    January 2007
  • 599 posts
Posted by azrail on Wednesday, July 18, 2018 5:36 PM
More like an "angry beaver"!
  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Wednesday, July 18, 2018 10:14 PM

Even when CN was a "scheduled" railway with Hunter at the helm things were still regularly in disarray, with late trains, PO'd customers and cars showing up whenever they pleased. 

It will be difficult to maintain any form of scheduled railroading until the congestion problems are resolved.

As I have said before, VIA is the canary in CN's coal mine.  Even now most freights are running even later than the Canadian.

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Wednesday, July 18, 2018 10:50 PM

What I have seen of EHH's PSR - If you can't meet the traditionally accepted metrix, change the measures to something that you can lie your way to meeting an report them, even though there is no correlation to the previous industry accepted standards.

So - are you lying now or were you lying then or are both lies.

Never too old to have a happy childhood!

              

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Wednesday, July 18, 2018 10:57 PM

BaltACD

So - are you lying now or were you lying then or are both lies.

"As long as I get my bonus who cares!"

-every manager

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Wednesday, July 18, 2018 10:59 PM

BaltACD

What I have seen of EHH's PSR - If you can't meet the traditionally accepted metrix, change the measures to something that you can lie your way to meeting an report them, even though there is no correlation to the previous industry accepted standards.

And if stuff falls really far behind just re-tag it.

That's not yesterday's 23-hour late train, it's today's train and it's one hour early!

Magic I tell 'ya!

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    February 2008
  • 602 posts
Posted by Bruce Kelly on Thursday, July 19, 2018 12:02 PM

This paragraph from the Trains news story tells me that they're reaching back to roots which largely pre-date EHH:

"CN is hiring crews throughout its network, and MacDonald says the railroad has hired 1,000 new people in Wisconsin and Minnesota alone. Despite that hiring pace, MacDonald says about 30 percent of new hires leave training in the first year — meaning that the railroad expects to continue hiring. This is in addition to tens of millions of dollars in new double-track and longer sidings the railroad is investing throughout its network."

Downsizing the payroll and ripping up segments of second main track were hallmarks of EHH's approach at BN, CN, and CP. At CN, he extended the length of some sidings to accommodate longer trains, but did so by utilizing rail lifted from other sidings in between. Meeting points for bigger trains are less of a win when you increase the distance and running times between meeting points, at least on a railroad with any reasonable measure of traffic. Even more so when those trains are assigned the minimal HP to get them across the road.

 

  • Member since
    February 2003
  • From: Guelph, Ontario
  • 4,819 posts
Posted by Ulrich on Thursday, July 19, 2018 3:40 PM

EHH has been long gone from CN, and current hiring trends therefore likely don't run contrary to his vision or reflect any corrective action to cuts that were made over a decade ago.  The cuts he made were needed.. then. But this is now, and sooner or later the railroad would have to hire more people. No one, not even EHH envisioned no more hiring ever again. And who knows... if these current trade disputes aren't resolved quickly  CN might once again need to look at its hiring numbers.. less trade means less freight to move..and fewer crews needed. 

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.