Trains.com

Key System vs BART What areas did BART miss and vice versa

2434 views
3 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2007
  • 1,304 posts
Posted by Falcon48 on Friday, April 18, 2014 2:01 PM

The most significant factor in the demise of the Key System was the construction of the Oakland Bay Bridge, which made San Francisco easily accessible by car from the East Bay.  Prior to the bridge, the only reasonably direct vehicular access between the two areas was by car ferry (a slow, delay prone crossing which couldn't handle anywhere near the volume of vehicular traffic the bridge could).  In this environment, the combination rail-ferry services offered by the Key System and the competing SP electric commuter system (which actually handled more passengers than the Key System) were much better service alternatives.

Of course, the Bay Bridge also gave the Key System and the SP system (as well as Sacramento Northern), direct access to San Francisco via the Bridge Railway on the lower deck of the bridge (replacing the ferry service). Both Key and SP invested a lot of money to use the bridge railway, both in track facilities and (in the case of Key) new rolling stock.  Undoubtedly, both companies expected the direct bridge service to help their competitive situation vis-a-vis auto traffic.  But it didn't work out that way.  Both companies continued to see ridership declines once they started operating over the bridge (the fact that the bridge railway didn't open until1939 - nearly 3 years after the bridge opened to auto traffic - didn't help).  Once this pattern became clear, SP pulled the plug and abandoned its service in 1941 (so did SN).  

The demise of the SP service probably helped the Key System in the short term, since many of SP's passengers went over to Key (Key also took over some of SP's routes).  The war, of course, resulted in a deluge of passengers.  But, after the war, the declining traffic patterns reemerged.  The end of Key's rail service came in 1958, primarily as a result of the bridge authority's decision to use the track area on the bridge for additional vehicle lanes.  Some sources indicate that Key wanted out before this, but would have been saddled with the costs of converting the Transbay Terminal for bus use.  The decision by the bridge authority to convert the track area to highway use allowed Key to shut down without bearing this cost.     

If you look at maps of the Key System and the SP system, you can see that the two systems had much more comprehensive covereage of their service territory (roughly Berkeley to San Leandro) than the existing BART system.  That's because both systems were conceived in a day when most patrons walked to a station (also, in the heady days of expansion, they built several competing lines close to each other, sometimes in the same corridor).  However, much of their East Bay trackage was in city streets, so they could not offer the level of service that BART offers today.  Trains were also restricted to 35 mph over the Bay Bridge because of structural considerations.

Interestingly,  the Transbay Terminal was not considered to be very well designed for the volume of passengers it was called upon to handle in its heyday as a rail terminal.  

  • Member since
    March 2014
  • 78 posts
Posted by Polish Falcon on Friday, April 11, 2014 11:42 AM

The Transbay Terminal Demolition was a mistake. Almost like NYC Penn Station in its Airy Station Platforms. The place opened in 1935 0r so  a great expample of Great Depression WPA Deco Style.

http://www.oberail.org/page/transbay_terminal/

Oh and thanks for the link

  • Member since
    July 2009
  • From: San Francisco East Bay
  • 1,360 posts
Posted by MikeF90 on Wednesday, April 9, 2014 3:11 PM

Activated above links:

Polish Falcon

IMO BART will do well to complete the Warm Springs extension to San Jose (link). Its very unique but technologically obsolescent control systems somehow need to be replaced with modern technology more conducive to periodic upgrading and expansion.

The Key System, being privately owned, had little ambition (and capital) to expand outside of their Oakland and Berkeley 'suburb' coverage. The Great Depression and automobile centric developments like the Caldecott Tunnel contributed to its demise.The OBERail site has interactive Google maps of the system. 

More of the Sacramento Northern infrastructure could have served the East Bay suburbs just abuilding when they discontinued service from Oakland in 1957. BART eventually reused the SN ROW from Walnut Creek to north Concord.

  • Member since
    March 2014
  • 78 posts
Key System vs BART What areas did BART miss and vice versa
Posted by Polish Falcon on Tuesday, April 8, 2014 7:16 PM

Map of BART

http://upload.wikimedia.org/wikipedia/commons/9/91/BARTMapNight.svg

Map of Key

http://oaklandwiki.org/Key_System/_files/Key%20System%20map.gif/_info/

Long Train on street who says U cant run heavy rail on streets

http://oaklandwiki.org/Key_System/_files/Key%20System%2012th%20&%20Broadway.jpg/_info/

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy