Pump
QUOTE: Originally posted by rkarn Do you think it is enough to make the engineer and the conductor feel something is wrong there? Karn[:)]
Deshler Ohio-crossroads of the B&O Matt eats your fries.YUM! Clinton st viaduct undefeated against too tall trucks!!!(voted to be called the "Clinton St. can opener").
QUOTE: Originally posted by csxengineer98 QUOTE: Originally posted by macguy The "W" is a water stop, generally there will be a little shack on the side of the tracks where the crews can wash up and refill their drinking water. There is also usually a hose so they can refill the locomotive as well. funny...but wrong..... the W is a wistle post...telling the engineer that thier is a crossing comeing up and to start to blow the horn in the 14-L (2 longs 1 short and then a long)... csx engineer
QUOTE: Originally posted by macguy The "W" is a water stop, generally there will be a little shack on the side of the tracks where the crews can wash up and refill their drinking water. There is also usually a hose so they can refill the locomotive as well.
QUOTE: Originally posted by csxengineer98 [..... the W is a whistle post...telling the engineer that there is a crossing coming up csx engineer
"I like my Pullman Standards & Budds in Stainless Steel flavors, thank you!"
Quentin
Being Crazy,keeps you from going "INSANE" !! "The light at the end of the tunnel,has been turned off due to budget cuts" NOT AFRAID A Vet., and PROUD OF IT!!
QUOTE: Originally posted by Modelcar ...Whatever the cause, don't the railroad experts on here think that section of rail needs attention...and pretty quick.
Our community is FREE to join. To participate you must either login or register for an account.