Trains.com

NUMBER OF TIES

887 views
6 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    January 2001
  • 33 posts
NUMBER OF TIES
Posted by The Block House on Friday, January 23, 2004 4:15 PM


A GOOD FRIND OF MINE ASKED IF I KNEW HOW MANY RAIL TIES ARE IN A MILE. ARE WOOD A ND CONCRETE TIES LAID WITH THE SAME SPACEING OR ARE THEY DILLERANT.
  • Member since
    January 2001
  • From: MP CF161.6 NS's New Castle District in NE Indiana
  • 2,148 posts
Posted by rrnut282 on Friday, January 23, 2004 4:33 PM
It depends: on track use(main,yard, siding), weight of the rail, material and the thickness of the tie.
Mike (2-8-2)
  • Member since
    June 2002
  • From: Independence, MO
  • 1,570 posts
Posted by UPTRAIN on Friday, January 23, 2004 7:17 PM
I thought it was like 6,000 on main lines per mile.....I forget though.

Pump

  • Member since
    September 2002
  • From: Rockton, IL
  • 4,821 posts
Posted by jeaton on Friday, January 23, 2004 8:10 PM
No, I think they are like 20 inches on center, or something like that. Its night time, can somebody sneak out with a yard stick and do a quick measure. Honestly, I have been around train tracks a lot.

I should get off and do some real work, but I'll try a Google search for fun.

"We have met the enemy and he is us." Pogo Possum "We have met the anemone... and he is Russ." Bucky Katt "Prediction is very difficult, especially if it's about the future." Niels Bohr, Nobel laureate in physics

  • Member since
    September 2002
  • From: Rockton, IL
  • 4,821 posts
Posted by jeaton on Friday, January 23, 2004 8:32 PM
Ah, Found it -good ole Google.
http://www.conservation.state.mo.us/conmag/1996/oct/4.html

Sleepers Through Time

by Lynn Barnickol

illustrated by Dr. James E. Price
"The Missouri Department of Transportation reports that in 1991 about 7,052 miles of track were in service in Missouri. About two-thirds was in mainline quality track and the other third was in sidings, spur lines and rail yards. Main line track requires about 3,700 ties per mile and a better grade of tie to withstand the rapid movement of heavy trains. The lower maintenance tracks required about 2,900 ties per mile, including ties of a lower grade."

Just to be clear they are talking about wood ties.


"We have met the enemy and he is us." Pogo Possum "We have met the anemone... and he is Russ." Bucky Katt "Prediction is very difficult, especially if it's about the future." Niels Bohr, Nobel laureate in physics

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Saturday, January 24, 2004 12:16 AM
Here's how its done in Alaska:
Each mile of track requires 3,250 ties and 19,000 spikes.
There are 611 miles of track owned by ARR.
That's 1,985,750 ties and 11,609,000 spikes total.

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Saturday, January 24, 2004 8:56 AM
Its my understanding that there's a 2nd tier of consideration here. I think that the FRA looks at, not just how many total ties are in a mile, but in terms of condition, classification and track speed, they count on how many "nail-able" ties there are in a mile (i.e. how many are in good enough shape to firmly grip a spike.) That number will be equal to, or less than the count of total ties and is a bigger determining factor in how the track conditions are rated.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy