As SealBook27 stated "Chess would be simpler!" Yardmastering is a chess game, only with BIGGER and MORE pieces to move around. Best part is the human factor which becomes involved, and really makes it INTERESTING!!! Did it for five years and enjoyed the challenges.
Never too old to have a happy childhood!
Mookie wrote: So you don't actually have time to really "look over" the dispatchers shoulder and see much more than how things are moving? I think my questions would probably fall more under a dispatcher's area. But for you - do you have an ebb and flow within the yard? Do you have times when the yards are stuffed and other times when they are relatively empty? Or do they run about the same all the time?
So you don't actually have time to really "look over" the dispatchers shoulder and see much more than how things are moving?
I think my questions would probably fall more under a dispatcher's area.
But for you - do you have an ebb and flow within the yard? Do you have times when the yards are stuffed and other times when they are relatively empty? Or do they run about the same all the time?
I use my access to the CADS screens to keep track of the trains coming my way. It's also helpful for making sure the DS and I are on the same page as to how I would like moves to take place.
There is a natural edd and flow.
At my SIT yard, Sunday and Monday tend to have more cars in the yard, becuase we normally don't perform any industrial switching, over the weekend. Also one local and one northbound trash train don't run. So the customer, local, and some trash builds up for Monday and Tuesday. After working the week, Friday normally has fewest cars in the yard.
At the class yard, Thrusday, Friday, and Saturdaytend to be heavy because of the influx of outbound cars from by yard, with Tuesday and Wednsday being light.
Nick
Take a Ride on the Reading with the: Reading Company Technical & Historical Society http://www.readingrailroad.org/
She who has no signature! cinscocom-tmw
JSGreen wrote:Wow. Reminds me of assuming a watch in Combat Information Center on board a ship! Which brings up a couple of questions....such as, how long are your shifts, and how much overlap do you get with the off going shift for the "pass-down".
Our shifts are 8 hours, but since we are not covered under HOS (one of the few crafts not so covered), we can be forced to work 16 straight, if we have no relief.
We get as much time as we need for turnover. Unless there's something out of the ordinary happening, it only takes 10 minutes or so.
BNSF has two types of ydmstr poistions--the BN guys are the traditional union ydmstrs while SF are asst trnmstrs (ATM). These are company jobs that are just that--a management, non union position that have almost the same authority as a division trnmstr. Since it is a salary position, these workers have no paid health coverage and monthly premimums is covered on your own. Thats the difference in working a union vs. non union position.
Falls Valley RR wrote: Great write up! I gave it 5 stars.A question...Let's say you get something started at your shift and it goes bad after you go off shift. Is it still your problem?
Great write up! I gave it 5 stars.
A question...
Let's say you get something started at your shift and it goes bad after you go off shift. Is it still your problem?
Depends. If it goes wrong because of something you actually did, they yes it's still your problem. If it goes wrong just because, then no it probably not your problem, but you'll probably be blamed anyway. Because that's the railroad way.
As promised here's a copy of the yard turnover. I use this document to transfer information to my relief. Most yardmasters simply use this document, to plan thier work, either making notes in the margins, or on the blank sheet beside it in the binder.
Great story Nick, and a good illustration why many of us love, or loved, railroading. No day is just like the day before so there are always challenges and if you are good at overcoming them you go home feeling great about what has been accomplished.
Perhaps a DS with a very busy territory will provide a similar analysis of the work. Any others also welcome.
SealBook27 wrote: WHEW!!! Chess would be simpler!
WHEW!!!
Chess would be simpler!
It is like playing chess. Not only do you have the "now" to worry about, but you have to be able to look 4, 6, or 8 hours ahead. One misstep now, can mean a cluster 4 hours from now. Likewise a good (and often seemingly meaningless) move now, will make the next 4 hours run like a Swiss watch.
Imagine taking over for someone in the middle of a chess game, taking an attack in progress and melding it into your strategy. Then a little later, someone else comes and takes over for your opponent. Now that attack changes and you must change with it, or get rolled over.
Of course, there is also knowing the strengths and weaknesses of your crews, and how to finesse your available tracks, because there are never enough. A instinctual feel for how things run can keep several crews moving at the same time.
I often tell people, anyone can be taught the mechanics of Yardmastering. Most people can sit in the seat and do the job, but truely great Yardmasters are born, not taught. They have a feel for operations, and future vision that just can't be learned.
Limitedclear wrote: 42 steps to be out the door for coffee...hmmmmm...lol...Nick, I thought you were TMing???LC
42 steps to be out the door for coffee...hmmmmm...lol...
Nick, I thought you were TMing???
LC
LC, I do both. Sometimes, it seems like I'm filling both roles at the same time.
Nick,
Awesome glimpse into a world lots of us wouldn't ever see or begin to understand. I'm sure I will have questions later but for now, thanks loads for sharing!
Dan
On average we have 23 regularly scheduled road trains a day that operate in the terminal. The break down:
Additionally there are 6 local trains that ferry cars between yards, interchange with other railroads, and service line of road customers.
Customers with in the terminal proper are serviced with yard crews.
Water traffic runs in bunches. We may not have an opening for weeks, and then have 5 openings in 3 days. Water traffic is suppose to have the right of way. And like anything else on the RR, there are occasional glitches with the bridge.
For those interested here's a blank copy of my work sheet. The top section is for the yard crews and work. The bottom section for road trains and thier work.
If I remember, I'll bring home a blank turnover page and post that as well.
What railroad are you on and what location (if you dont mind). About how many trains per day thru the facility? How many swap crews vs having yard work done?
How many times per day, on average do you have to open the drawbridge and who has the right of passage...trains or boats? Ever any issues with the drawbridge not working correctly?
ed
Thanks Nick...
I'll have to think of a few questions myself. I have always wondered how you guys keep things straight in the yard...
Nick! Thank you so much! I printed it out and will have to take the weekend to forumlate some questions.
If I can't get into the yard to see for myself, then I will rely on my forum friends to help me learn.
Mookie
Mookie, here you go. A primer on Yardmastering. Of course every Yardmaster and yard office is different, but this should give you a general idea what goes on.
First, a brief description of the yard. I work at a SIT (Storage In Transit) yard, that serves a transloading facility, three local industries, an intermodal ramp, and a car repair shop. We are also a major crew change point, as well as, a junction between two subdivisions. Additionally, we are a midway station for the trash trains to drop and pick up cars. I control a drawbridge, too.
Next, a tour of the office. I actually work in a tower. There are 42 steps between the parking lot and my desk.
Now a quick walk through my day.
Now I'll open up the floor for questions,Nick
Our community is FREE to join. To participate you must either login or register for an account.