Login
or
Register
Home
»
Trains Magazine
»
Forums
»
General Discussion
»
Ball signals
Edit post
Edit your reply below.
Post Body
Enter your post below.
These are also referred to as highball signals. Two balls would be permenantly atatched to two hanging ropes. The last two of these were used by the Boston & Maine and were in operation until the 1970's. One of these was located near Waumbek Junction, N.H. It was located at a crossover of the B.&M. and Maine Central. If one ball was raised it would give B.&M. trains the right-of-way. If both balls were raised it would allow for Maine Central trains to proceed. Both balls would be lowered when switching was being done. All trains had to stop within 500 feet of the crossover. The balls would be hoisted up manually. While the way this signal was operated was used in this case, at some other crossings how the balls were raised had different meanings. Perhaps someone else will enlighten us on them.
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy