Trains.com

NS derails coal train with known HBD warning

2530 views
10 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,836 posts
NS derails coal train with known HBD warning
Posted by blue streak 1 on Saturday, July 8, 2023 1:36 PM

Crew tried to move car to siding about 8 miles distance at 20 MPH but train derailed before reaching siding.  This may cause an industry wide changes in how HBD warnings are handled but who really knows?

Rail union says Virginia derailment renews questions about Norfolk Southern's safety practices (msn.com)

  • Member since
    May 2003
  • From: US
  • 24,959 posts
Posted by BaltACD on Saturday, July 8, 2023 3:06 PM

blue streak 1
Crew tried to move car to siding about 8 miles distance at 20 MPH but train derailed before reaching siding.  This may cause an industry wide changes in how HBD warnings are handled but who really knows?

Rail union says Virginia derailment renews questions about Norfolk Southern's safety practices (msn.com)

I am not conversant with NS Rules and their application.

When I was working on CSX and a HBD detected a car and the crew inspected and determined it needed to be set out - the car was to be moved at 'Walking Speed' no more than 4 MPH under observation of the crew member to the point of set out.

Never too old to have a happy childhood!

              

  • Member since
    July 2006
  • From: KS
  • 988 posts
Posted by SFbrkmn on Saturday, July 8, 2023 6:04 PM

No knowledge of how NS handles hot bearing alarms. On the green n orange, expereinced two events both involving Z trains w/different method of inspections. First one was a level 2 told to us by the DS. Orders were to take it 55 miles further downline where the responder would meet us for the inspection and to set it out. Did as instructed. Upon getting off at the determined inspection point, got off, pulled the car up and found the hotbox. Bearing was smoking &  spitting grease. Set it out and continued on the merry way.                                                           Second event about three wks ago. Level 1 alarm per the ole DS. Since it was a level 1, an immediate stop/inspection was required. Towards the rear of a 7000 ft train. Pulled the axle towards me, looked it over. No smoke or grease but the cap was hot blue. Heat gun I took temp w/was like 195.Upon briefing w/the hot bearing desk and since we were 15 miles from the crew change point, the decision was made to take to town not, exceeding 10 mph. That was time consuming and sucked but made it. S/o was completed at the end of the trip.                        Sam 

  • Member since
    September 2003
  • 21,385 posts
Posted by Overmod on Sunday, July 9, 2023 4:02 PM

SFbrkmn
Upon briefing w/the hot bearing desk and since we were 15 miles from the crew change point, the decision was made to take to town not, exceeding 10 mph.

What was the temperature at the outside end of the bearing when you arrived?

This alarms me greatly, because no attempt appears to have been made to consider the state of the critical inside bearing, which is the one contributing most to the axle end separating.  Oxide bluing forms considerably hotter than 195 degrees F, it would have required substantial time at that temperature to come up to 'color', and the whole mass of the axle and its heat-sinking through the outer bearing (and inward through the wheel fit) would have to be brought to that temperature or higher first.

  • Member since
    December 2001
  • From: Northern New York
  • 24,878 posts
Posted by tree68 on Sunday, July 9, 2023 5:53 PM

Overmod
This alarms me greatly, because no attempt appears to have been made to consider the state of the critical inside bearing, which is the one contributing most to the axle end separating.  Oxide bluing forms considerably hotter than 195 degrees F, it would have required substantial time at that temperature to come up to 'color', and the whole mass of the axle and its heat-sinking through the outer bearing (and inward through the wheel fit) would have to be brought to that temperature or higher first.

Reducing speed will greatly reduce the effect of the friction.  At 10 MPH you may still get heating, but it's far less likely to reach the point where things melt.  And if the axle end does fail, you don't end up with 50 cars accordianed across the ROW.

You can rub your hands together slowly all day long.  

If you do it  quickly, things get warm pretty quickly.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    September 2003
  • 21,385 posts
Posted by Overmod on Monday, July 10, 2023 4:01 AM

Yes, but if you have rubbed your hands so that they are severely blistered, even a little additional rubbing can cause quick additional pain or damage.

  • Member since
    December 2001
  • From: Winnipeg, Mb
  • 628 posts
Posted by traisessive1 on Saturday, July 15, 2023 6:24 PM

On CN we're told to stay with the car and limp it to a set out point, if safe to do so, and to not exceed 10 mph when moving it. We've had numerous hot boxes that had to be changed out in place. The mainline was shut down until the truck came to change the axle.

I had guys on Reddit calling me an idiot for NOT doing what these NS guys did. 

It seems that NS is a backwards railroad and has made their crews believe that incredibly dangerous moves are normal. 

10000 feet and no dynamics? Today is going to be a good day ... 

  • Member since
    January 2002
  • From: Canterlot
  • 9,523 posts
Posted by zugmann on Saturday, July 15, 2023 8:21 PM

traisessive1
I had guys on Reddit calling me an idiot for NOT doing what these NS guys did. 

You expect anything else from Reddit? 

  

The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,260 posts
Posted by SD70Dude on Sunday, July 16, 2023 1:08 AM

zugmann
traisessive1
I had guys on Reddit calling me an idiot for NOT doing what these NS guys did. 

You expect anything else from Reddit? 

Are we talking about the online forum or the CN Redditt Subdivision?

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    September 2003
  • 21,385 posts
Posted by Overmod on Sunday, July 16, 2023 2:25 PM

zugmann
traisessive1
I had guys on Reddit calling me an idiot for NOT doing what these NS guys did.

You expect anything else from Reddit?

More to the point, you're concerned about what the usual run of Redditors says about this?  Devil

  • Member since
    July 2006
  • From: KS
  • 988 posts
Posted by SFbrkmn on Monday, July 17, 2023 4:55 PM

[quote user="Overmod" 

 190 on the one dragged into Wellington at 10 mph
SFbrkmn
Upon briefing w/the hot bearing desk and since we were 15 miles from the crew change point, the decision was made to take to town not, exceeding 10 mph.

 

What was the temperature at the outside end of the bearing when you arrived?

 

This alarms me greatly, because no attempt appears to have been made to consider the state of the critical inside bearing, which is the one contributing most to the axle end separating.  Oxide bluing forms considerably hotter than 195 degrees F, it would have required substantial time at that temperature to come up to 'color', and the whole mass of the axle and its heat-sinking through the outer bearing (and inward through the wheel fit) would have to be brought to that temperature or higher first.

 190

[/quote]

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy