Trains.com

Railroad Crew On A Schnabel Car Train

1314 views
4 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    September 2013
  • 2,505 posts
Railroad Crew On A Schnabel Car Train
Posted by caldreamer on Monday, July 31, 2017 8:18 AM

On a trin with a Schnabel car, there are 2 cabooses.  The first isfor the Schnable car personnel and the rear one is for the railroad. crew.

How many railroad personnel are on the rear caboose?  Are they brakeman, conductors or supervosirs?

  • Member since
    March 2005
  • From: Brewster, NY
  • 648 posts
Posted by Dutchrailnut on Monday, July 31, 2017 9:53 AM

it would normally be just Cdr and brakeman, any supervisor would most likely ride with Engineer , but there could be others like track workers as some obstacles need moving at tight spots like signs or switch handles.

 

  • Member since
    December 2007
  • From: Southeast Michigan
  • 2,983 posts
Posted by Norm48327 on Monday, July 31, 2017 10:08 AM

Based only on my readings of Schnabel car transportation of heavy/high/wide objects I would suspect there is considerable planning before the movement. Clearances, both horizontal and vertical, have to be considered.

I am not aware of how many crew ride the cabooses but I think there would be enough personnel aboard to shift the load when conditions require that.

Norm


  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Monday, July 31, 2017 10:32 AM

With the railroad's current two man crews - both members of the railroad's operating crew will be on the locomotive.  

Cabooses with schnabel loads will normally be considered a part of the shipment and supplied by the shipper/consignee of the shipment.  They will be used by shipper/consignee personnel and possibly railroad supervision (both operating (Trainmaster etc. and non-operating Clearance Bureau etc.).

Never too old to have a happy childhood!

              

  • Member since
    June 2003
  • From: South Central,Ks
  • 7,170 posts
Posted by samfp1943 on Monday, July 31, 2017 10:17 PM

 

Norm48327

Based only on my readings of Schnabel car transportation of heavy/high/wide objects I would suspect there is considerable planning before the movement. Clearances, both horizontal and vertical, have to be considered.

I am not aware of how many crew ride the cabooses but I think there would be enough personnel aboard to shift the load when conditions require that.

 

Norm's info is pretty much spont on!

  If you are curious about Schnabel cars; S.berliner III Has a large website that contains photos (many!), and lots of pertinent information on their heavy capacity cars... Also check the TRAINS Community Search function on the right side of the page.. Search ther word.. Kasgro.. 

See site linked @ http://sbiii.com/rrschnb0.html#880tmsch

Several years back there were Forum threads that covered the WECX801 the Schnabel Car built by Kasgro, several years back in Pennsyania.  

 

 


 

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy