Trains.com

Parked trains on the UP between Kit Carson, CO and Oakley, KS

2691 views
11 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2006
  • 1,754 posts
Parked trains on the UP between Kit Carson, CO and Oakley, KS
Posted by diningcar on Sunday, May 28, 2017 8:00 PM

Today, May 28, I was driving east on US Hwy 40 and encountered three parked UP trains. The 1st (most westerly location) was a eastbound loaded coal train with a pusher and two head end units. The train was parked on the main track a few miles west from the nearest siding, with the headlights on but no crew was visable. The next train was encountered about ten miles east from the 1st train and was a westbound empty coal train apparently on a siding but with no headlights on and no crew visable. The 3rd train was a eastbound manifest parked on the main track with no crew visable. It was ten or miles further east from the stopped 2nd train. 

As I drove on toward Oakley (about 50 miles) no other trains were observed, and I would certainly have seen one if it existed since Hwy 40 parallells this UP main line very closely.

These trains were all more than 100 miles from any crew change location so it would appear that the crews were picked up, and if so replacement crews would have to be transported. All of this seemed so illogical that I thought I might encounter a derailment or a bridge out of service which would result in this main line between KC and Denver being out of service but nothing was seen as I went east toward Topeka. Perhaps there was trouble between Denver and Kit Carson.

Does anyone have info about this strange (to me) situation?

 

  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Sunday, May 28, 2017 8:11 PM

My guess is that it has to do with the holiday tomorrow somehow--be it gettng the crews home on time or just holding things out of a yard, or both.  They'll peobably be there all day tomorrow, at any rate.

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Sunday, May 28, 2017 8:23 PM

Holidays present unique problems for railroads.  Their employees think they get to observe the holiday - they tend to 'go into hiding' when subject to call and don't answer the telephone (or any other forms of communication).  The companies have their own plans for the Holidays; however those plans get modified by getting employees on the property to execute that plan.

Never too old to have a happy childhood!

              

  • Member since
    January 2002
  • From: Canterlot
  • 9,575 posts
Posted by zugmann on Sunday, May 28, 2017 8:26 PM

BaltACD
Their employees think they get to observe the holiday -

 

Some of us do. 

#yardjoblife.

It's been fun.  But it isn't much fun anymore.   Signing off for now. 


  

The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.t fun any

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Sunday, May 28, 2017 9:05 PM

DC: A big part of the headache is getting out of the Denver terminal (North Yard) before running out of hours, compounded by the crew downsizing after the coal train slump.. They tend to fleet trains out of KC and North Yard (rarely out of Oakley anymore)... The crews will pop back on all three and start the process again.

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    September 2011
  • 6,449 posts
Posted by MidlandMike on Sunday, May 28, 2017 10:43 PM

About a dozen years ago UP built a direct link from the Moffat line to the Beltline that bypassed North Yard.  Was it built mostly for coal trains, or do some other trains bypass North Yard?

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Monday, May 29, 2017 9:31 AM

Used for most anything that goes east. Leaves the main track at Utah Junction and heads east, almost on the Denver & Intermountain alignment (including through the station called "Modern") until it reaches the NWDTRR junction with the old DL&NW alignment over a new bridge over BNSF's Front Range Sub)

UP still intends to put back the CRIP alignment through Sandown and the connection with the KP/Limon Sub. .... This includes knocking down a hotel and cleaning up some stupid moves by the C&C of Denver . The sharp curves at the E Denver Belt Connection and Greeley Junction will go away. UP already owns the main track R/W that shortline Denver Rock Island RR runs over. DRIR has an operating easement/ OHrights to reach Sandown Yard, Airlawn and the industrial leads that it still owns and operates.

Lately, UP has posted two flagmen with "Stop" boards at  Washington Street for several weeks. Not sure why those guys have been there so long unless the new PTC installation is playing havoc with something in the crossing circuit.

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Monday, May 29, 2017 11:18 AM

mudchicken

Used for most anything that goes east. Leaves the main track at Utah Junction and heads east, almost on the Denver & Intermountain alignment (including through the station called "Modern") until it reaches the NWDTRR junction with the old DL&NW alignment over a new bridge over BNSF's Front Range Sub)

UP still intends to put back the CRIP alignment through Sandown and the connection with the KP/Limon Sub. .... This includes knocking down a hotel and cleaning up some stupid moves by the C&C of Denver . The sharp curves at the E Denver Belt Connection and Greeley Junction will go away. UP already owns the main track R/W that shortline Denver Rock Island RR runs over. DRIR has an operating easement/ OHrights to reach Sandown Yard, Airlawn and the industrial leads that it still owns and operates.

Lately, UP has posted two flagmen with "Stop" boards at  Washington Street for several weeks. Not sure why those guys have been there so long unless the new PTC installation is playing havoc with something in the crossing circuit.

 

MC, a question: If the UP reconnects Belt Junction and Sandown, will there be a connection with the Cheyenne line where the two cross (for the CZ to use when it is detoured across Wyoming)?

I well remember that sharp curve you mention. I think it was two years ago that the CZ was detoured across Wyoming and, as we left the main UP line we were tilted sharply--and we rocked quite a bit before we reached Utah Junction. It seemed to me that the line needed a bit of surfacing.

Johnny

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Monday, May 29, 2017 11:27 AM

It depends which fork you take at Belt Junction, left to Sandown or right to Greeley Jcn (then the nasty curve) to go north to Greeley or east to Limon/ south to Denver via Pullman Jcn.  .... I would have thought that you might have avoided Belt Jcn altogether on #5 or #6.

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Monday, May 29, 2017 11:56 AM

We came down from Speer and took that sharp curve and over to Utah Jct. In 2014, when there was a washout east of Moffat, we took the reverse of that to get up to Speer.

I have the impression that this route was necessary because the UP's direct line into the station was broken in favor of the locals who wanted access to the station. Back in the beginning of Amtrak's operation, I was not at all surprised when we ran into the station from Chicago, a UP engine was put on the rear and took us up to Cheyenne--where the engine was run around to the head end. Coming back from the Coast, the process was reversed. I understand that his same procedure was used when the City of Portland ran through Denver

What was the procedure when the City of St. Louis avoided Cheyenne--back into the station in Denver?

Johnny

  • Member since
    October 2016
  • 185 posts
Posted by Saturnalia on Monday, May 29, 2017 1:47 PM

Well, there are those who claim "UP" stands for "Unlimited Parking"!

  • Member since
    July 2006
  • From: KS
  • 999 posts
Posted by SFbrkmn on Saturday, June 3, 2017 2:04 PM

Holidays do bring about manpower issues with crew management. Shutting down the mainline is hard to do espically w/ so many pools now being double ended. It has always been silly to run so many yd jobs and locals on holidays. BNSF did hold in some yd jobs, locals & rd switchers for Good Friday and also this past Memorial day, unlike in yrs past. Hopefuly this will become the new format                          My late father-in-law worked as as SF Middle Div trainman 1947-1987. Looking at his timebooks, one patttern noticed was he did not work much on Christmas. Most of those yrs he took a layoff (sick) day. When he obtained enough seniority, he simply took one or two wks of vac to finish the yr. His stance was giving the carrier 364 days a yr of himself but not on Christmas.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy