Login
or
Register
Home
»
Trains Magazine
»
Forums
»
General Discussion
»
2-8-8-2 Mallet UP
Edit post
Edit your reply below.
Post Body
Enter your post below.
In 1984 I saw a 2-8-8-2 N&W Y-3 in operation in Allahabad, India. Someone, I don't recall who, told me that it had been converted to nuclear power, to make the steam in the boiler. THAT was a big engine, and I was duly impressed. <br /> They told me that the old firetubes were routed one into the other, and the reactor was in the firebox, along with some pumps to circulate the heated water. Was told this made up the Primary system. <br /> Whoever owned it,J & M RailRoad,Inc.???, had rebuilt the entire locomotive, had a solid cast steel boiler could withstand up to 27,000 psi. I heard that it had pulled a 100,000 ton coal consist all by herself, from Hyderabad to Allahabad at an average speed of 45 mph. Just though you might be interested.
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy