No. 6 a 4-6-0 is working upgrade with 3 coaches in tow. In this shot we see No. 6 in the center span of a 3 bridge set. The bridge is 3 feet 6 inches long and is scratch built. So my only question, where did the photographer go, he was standing on the 3rd bridge when he took the photo and I know the engineer on old No. 6, he doesn’t like to stop for much of anything, Should he fall behind schedule…..