Larry
Conductor.
Summerset Ry.
"Stay Alert, Don't get hurt Safety First!"
Visit look4trains.com
Dr. Frankendiesel aka Scott Running BearSpace Mouse for president!15 year veteran fire fighterCollector of Apple //e'sRunning Bear EnterprisesHistory Channel Club life member.beatus homo qui invenit sapientiam
Simon Modelling CB&Q and Wabash See my slowly evolving layout on my picturetrail site http://www.picturetrail.com/simontrains and our videos at http://www.youtube.com/user/MrCrispybake?feature=mhum
QUOTE: Originally posted by Robert Knapp If you are anxious and want to run trains immediately, set up a 4x8 ply quick layout, while you decide what you want for the real layout. Don't know if you have the room to do this though. Planning is the key and you should be able to eventualy buy what you need with that budget. Bob K.
Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
Modeling B&O- Chessie Bob K. www.ssmrc.org
Brought to you by the letters C.P.R. as well as D&H!
K1a - all the way
From the far, far reaches of the wild, wild west I am: rtpoteet
EMD - Every Model Different
ALCO - Always Leaking Coolant and Oil
CSX - Coal Spilling eXperts