Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Results

730 views
16 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    January 2006
  • From: Alaska
  • 459 posts
Results
Posted by modelalaska on Thursday, March 2, 2006 12:13 AM
Results may be used to clarify semantics. [:D]
  • Member since
    August 2004
  • From: Phoenix, Arizona
  • 1,989 posts
Posted by canazar on Thursday, March 2, 2006 1:24 AM
Oh, I am sure this poll will start off quite few responses. Personally, I play with trains. Yes, I operate, and the term "playing" maybe cause some pains from some but, if it isnt work, its playin'[:D]

To each his own.

Best Regards, Big John

Kiva Valley Railway- Freelanced road in central Arizona.  Visit the link to see my MR forum thread on The Building of the Whitton Branch on the  Kiva Valley Railway

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, March 2, 2006 2:46 AM
I operat my model trains, in a way that means i play with tem.
  • Member since
    December 2003
  • From: Good ol' USA
  • 9,635 posts
Posted by AntonioFP45 on Thursday, March 2, 2006 7:13 AM
Interesting terms.

Don't forget guys that even with a lone "circle of track" you can still operate a train.

Years ago when my son was small, we'd set up an HO oval track around the Christmas tree with cheap Atlas "snap track". There was one passenger station and a tiny trestle further up the line. The scenery was a "Christmas town" that consisted of Dollar Tree houses. That was it. The train was an Atlas FP7 with 3 Rivorossi New York Central cars.

I explained to my son that we were going to run the train like the real thing. He was interested!

With my Tech II 2500 we "operated". Using the "Momentum" feature we took turns at taking off at realistic speeds. Once the train was up to a scale 60 mph, the Momentum was turned off. After running a certain amount of loops it was time for a "Station Stop".

The "operations" challenge was to flip the Momentum switch on and try to stop the train smoothly with no more than 2 loops, at the station without shooting past it. Talk about a tough challenge! I even had a hard time (but we both had a lot of fun!). You had to start throttling down at the right point or the train would stop a foot or so beyond the station. In real life, the engineer would have caught some heat!

So this shows that no matter how simple a track plan is, simple OPERATIONS can be fun!

"I like my Pullman Standards & Budds in Stainless Steel flavors, thank you!"

 


  • Member since
    June 2003
  • From: US
  • 641 posts
Posted by mikebonellisr on Thursday, March 2, 2006 7:29 AM
Because my layout is'nt complete,I spend a lot of time "playing" with my trains.Run a few engines,move a few cars,tweek some track/switch,install a signal or two,extend the loco net on my system,do some detailing,etc.,etc.So I'm still Playing.It may be a couple of years before I operate.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, March 2, 2006 7:48 AM
Dictionary.com defines the word operate (one of 5 different uses) is,
"To control the functioning of; run: operate a sewing machine"
So by that definition , I would say I dont play with trains.[^]

But,[:0]

on the other side of the coin, one of the definitions of play is,
"To occupy oneself in amusement, sport, or other recreation: children playing with toys" Yes, I do use them for recreation too.[^]

So I guess its up to how YOUR opinion is as to why you do what you do with your trains.

Maybe we need a new word here,,,,,,,,Ploperate?.............OpLay? [}:)]

I think personally, I'll go back to the term Practicing Ferroequinologist, it keeps em guessing.[;)] I'm not playing, or operating, I'm practicing! Some day, I might get it right!!!![:D]



  • Member since
    July 2003
  • From: Metro East St. Louis
  • 5,743 posts
Posted by simon1966 on Thursday, March 2, 2006 8:00 AM
Both. When my boys and I are in the room we are playing trains. Making up stories as we go. When I am in the room on my own, I become all grown up and operate the layout.

Simon Modelling CB&Q and Wabash See my slowly evolving layout on my picturetrail site http://www.picturetrail.com/simontrains and our videos at http://www.youtube.com/user/MrCrispybake?feature=mhum

  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Thursday, March 2, 2006 10:37 AM
I voted 'operate,' but am guilty of both of the above.

When operating, absolute adherence to the published timetable is required.

But sometimes, I just run something to watch the wheels roll - frequently something wildly inappropriate to my prototype, like a Norfolk and Western J on track that is nominally 3'6" gauge and would never have supported the axle loading of the J's half-empty tender, never mind the locomotive. (So a J looks funny pulling JNR 'blue' passenger cars. So what!)

I usually model the spirit of my chosen prototype, but I'm not a slave to it.
  • Member since
    June 2003
  • From: Culpeper, Va
  • 8,201 posts
Posted by IRONROOSTER on Thursday, March 2, 2006 11:33 AM
Both as the mood strikes me.
Enjoy
Paul
If you're having fun, you're doing it the right way.
  • Member since
    May 2003
  • From: Ozark Mountains
  • 1,167 posts
Posted by dragenrider on Thursday, March 2, 2006 6:27 PM
I do both as the mood strikes. But, most of the time even my "playing" has an operational goal.

By the way, you forgot to put in an "other" option for Spacemouse! [:D]

The Cedar Branch & Western--The Hillbilly Line!

  • Member since
    September 2005
  • From: Mass
  • 1,063 posts
Posted by trainfreek92 on Thursday, March 2, 2006 6:30 PM
QUOTE: Originally posted by canazar

Oh, I am sure this poll will start off quite few responses. Personally, I play with trains. Yes, I operate, and the term "playing" maybe cause some pains from some but, if it isnt work, its playin'[:D]

To each his own.


[:)][:)][:)][:)][:)]
Running New England trains on The Maple Lead & Pine Tree Central RR from the late 50's to the early 80's in N scale
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, March 2, 2006 6:57 PM
Realistic operation when my layout is finished. The reason I am debating single track of double track is because if I just watch 2 trains run it seems like I'm *playing* with trains. But If 1 trains runs while I do some REALISTIC SWITCHING that would be better.
  • Member since
    April 2004
  • From: North Idaho
  • 1,311 posts
Posted by jimrice4449 on Thursday, March 2, 2006 7:05 PM
Assuming by "play" you mean just running the train to see it go and by "operate" you mean to cause the train to duplicate functions of the prototype, I would have answered both (as it would seem most of the other respondents would). Unfortunately the option wasn't available.
  • Member since
    September 2003
  • From: Mp 126 on the St. Louis District of NS's IL. Div.
  • 1,611 posts
Posted by icmr on Thursday, March 2, 2006 7:48 PM
I love....hmm......operating my railroad.



Victor

Happy Railroading.[swg][swg]
Illinois Central Railroad. Operation Lifesaver. Look, Listen, Live. Proud owner and user of Digitrax DCC. Visit my forum at http://icmr.proboards100.com For God so loved the world, that he gave his only begotten Son, that whosoever believeth in him should not perish, but have everlasting life. Let every thing that hath breath praise the Lord. Praise ye the Lord. Dream. Plan. Build.Smile, Wink & GrinSmile, Wink & Grin
  • Member since
    October 2004
  • From: Colorful Colorado
  • 8,639 posts
Posted by Texas Zepher on Thursday, March 2, 2006 7:57 PM
BOTH! - not an option on your survey.
  • Member since
    February 2001
  • From: Wyoming, where men are men, and sheep are nervous!
  • 3,390 posts
Posted by Pruitt on Friday, March 3, 2006 5:13 AM
I really like descriptive titles like this thread has.
  • Member since
    December 2004
  • From: Bedford, MA, USA
  • 21,374 posts
Posted by MisterBeasley on Friday, March 3, 2006 6:34 AM
I operate the lawn mower. I play with my trains.

It takes an iron man to play with a toy iron horse. 

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!