Login
or
Register
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Home
»
Model Railroader
»
Forums
»
General Discussion (Model Railroader)
»
Joints
Joints
779 views
3 replies
Order Ascending
Order Descending
Anonymous
Member since
April 2003
305,205 posts
Joints
Posted by
Anonymous
on Monday, February 17, 2003 8:51 AM
I've recently built a "lift out" section for my HO layout. How do I make the tracks join at either side of the lift out section without massive gaps that will derail trains?
Reply
Edit
cmrproducts
Member since
January 2001
From: US
1,774 posts
Posted by
cmrproducts
on Tuesday, February 18, 2003 7:34 AM
When I built a movable bridge at the entrance to my layout room I had to come up with a way to do the same thing. The bridge has 2 tracks on it and they are at different levels. The bridge is a swinging gate setup so the one end of the bridge was built at an angle, which compounded the problem even more!
I finally decided to just clamp the bridge closed. Then laid the roadbed and then the track right through in one piece. I added PC board ties right where the ends of the bridge would be. I then nailed down the PC board ties. As an added precaution I also added glue to several ties back on either side of the opening. I am using Atlas code 100 flex. I let the glue dry for several days and let the trackwork stabilize for about 2 weeks. I wanted to be sure that the bridge would be used to the dampness of the basement and if I had to make any changes to the trackwork before I cut the rails.
Now that the bridge had stabilized and I ran a few operating sessions over the bridge and all seemed ok, I cut the rails with a motor tool and the thinnest blade I had. The then opened the bridge to check for any binding and if the rails would catch each other as the bridge swung past the cut ends. I then filed the rail ends to make sure all was smooth and then tried running a train across once the bridge was back closed!
There was some minor tweaking that needed to be done but it worked well. In the summer the bridge does get a little tuff to open and close but does not pose a problem.
It has been operating every other Thursday night for the past 2 years without any problems. And I do not have any interlocking to keep the trains from running into the abyss! But I probably will have to in the future.
BOB H Clarion, PA
Reply
dknelson
Member since
March 2002
From: Milwaukee WI (Fox Point)
11,439 posts
Posted by
dknelson
on Tuesday, February 18, 2003 8:14 AM
Maybe I am not exactly understanding the question ... but some years ago Model Railroader had an article where a guy used an ordinary sliding gate lock to hold the movable piece in place.
Dave Nelson
Reply
Anonymous
Member since
April 2003
305,205 posts
Posted by
Anonymous
on Thursday, February 20, 2003 9:22 AM
Thanks a lot. I screwed it in place, layed the track, then cut it thin. when I have my bridge in place a simple screw holds it there. thanks for the help!
Reply
Edit
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Users Online
There are no community member online
Search the Community
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter
See all
Sign up for our FREE e-newsletter
and get model railroad news in your inbox!
Sign up