Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
QUOTE: Originally posted by cactusjawas I have rigid foam underneath as a subterrain, sorry for the confusion. My question is that foam and the trackbed do not seem to be solid enough materials to fasten the track down to. So is the track bed solid enough to hold the track in place when fastened to it?
Best Regards, Big John
Kiva Valley Railway- Freelanced road in central Arizona. Visit the link to see my MR forum thread on The Building of the Whitton Branch on the Kiva Valley Railway
QUOTE: Originally posted by cactusjawas what kind of glue can I use that won't melt the Woodland scenics roadbed?