Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

BachmanEZ Track--A Novice's Assessment

605 views
4 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
BachmanEZ Track--A Novice's Assessment
Posted by SpaceMouse on Sunday, January 30, 2005 6:15 PM
I have spent the last two weekends working on a 4.5 x 8 layout made of about 2/3 EZ track and 1/3 Atlas Flex and pieces. Last week I got the layout done and layed out the plywood for cookie cutting. I finished the flex track Saturday morning, cutting it with a dremmel tool--and of course the track cutting tool arrived later that day.

I decided to solder and file down the high joints on the track that would be in a tunnel under the mountain. While I was doing that, I realized that I should probably test out the turnouts toward the back. It was a good thing I did. Every time an engine went on a side track, it derailed. I'd fix one place and it derailed elsewhere. What I found was that on the outside rails of a turnout, enueven joints woul stop the loco cold causing it to pop the drive wheels of the track. I'd no sooner fix this thatn another problem would occur. There were two common problems. One is that points were square. A little could be done with filing, but the bigger problem is that they don't always lay flat against the rail.

At any rate, I spent the entire day filing track and was able to get all but one of the turnouts reliable. Of course, it is the least accessible one. If the turnout is open strainght, there is not problem. If it is open toward the turnout, all the locomotives can make it at medium speed, but neither fast or slow. I think everone will end up avoiding that turnout.

So out of EZ 14 turnouts, 13 work and one works conditionally.

However, two were are flawed. One had a sprung mechanism and I had to take it apart, figure it out and fix it. On the other broken one, the turnout side was electrically dead. The solution of course is to put a dropdown on the other side of the turnout. But I had planned to insulate that break and create a block there. At this point, it is easier to eliminate the block.

So, even though the EZ track started out easier, the Atlas is more verisitile and easier to work with. The Atlas is easier to join as the Bachman construction requires a slight twist to get the pieces together. The Atlas is certainly easier to cutomize. The turnout that derils the trains above could be greatly improved with a tortoise, but it would semi-difficult to fit one to a EZ turnout.

I give EZ a C or maybe a C+

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, January 30, 2005 7:31 PM
It's true EZ track may not be the best out there, but i use it and love it. Another good track with built in roadbed is Kato Unitrack.
  • Member since
    November 2003
  • 760 posts
Posted by Roadtrp on Sunday, January 30, 2005 7:33 PM
I've found EZ track great to work with. Just the track though, not the turnouts. I agree with the above assessment. I only have 6 turnouts on my layout, but I've spend hours and hours getting them all to work reliably. Usually just filing down the points does it, but occasionally I need to work with the frog also.

My grade for EZ Track:

Track B+
Turnouts D+


-Jerry
  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Sunday, January 30, 2005 7:56 PM
QUOTE: Originally posted by Roadtrp

I've found EZ track great to work with. Just the track though, not the turnouts. I agree with the above assessment. I only have 6 turnouts on my layout, but I've spend hours and hours getting them all to work reliably. Usually just filing down the points does it, but occasionally I need to work with the frog also.

My grade for EZ Track:

Track B+
Turnouts D+



I had a lot of frog work today, especilly where metal from the back end of the points meets the plastic. The trains kept snagging there.

I would agree with the B+ D+

But my bigger track will be flex and tortoises.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    June 2004
  • From: Pacific Northwest
  • 3,864 posts
Posted by Don Gibson on Sunday, January 30, 2005 8:18 PM
I was more impressed with LIFE LIKE's turnouts than all the others - metal frogs.
I don't qualify to judge, only observe, as I use all Shinohara made after trying other brands.
Don Gibson .............. ________ _______ I I__()____||__| ||||| I / I ((|__|----------| | |||||||||| I ______ I // o--O O O O-----o o OO-------OO ###########################

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!