Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
QUOTE: Originally posted by Jetrock Personally I'd simplify the yard a bit-- instead of having those three little spurs off to the side, just include one long track (it's better to have a few long straight tracks than more short stubby tracks.) I assume the yard goat will be stationed just below where the road engine will park--you could, theoretically, tuck the caboose there while the switcher is switching, and then replace it at the end of the train when switching is done.
QUOTE: The fact that your yard lead is inside a tunnel is kind of weird but I think that it will be endurable. I notice there are two other spurs--for industries, I presume?
QUOTE: Also, there's still that crossover under the mountain. I'd suggest getting rid of it entirely and making do with the single crossover that isn't covered by mountain, and replacing the other crossover with a "double crossover." That will save you some space as well as some headaches.
QUOTE: Originally posted by SpaceMouse [I was picturing a smaller operation. The yard I am seeing exists entirely within the loop and isolated into its own cab (is that the right term) so that yard operations can go on while the kids play on the loops. The locomotive pulls into the red, and disconnects. The goat would be in the parrallel area just to the right of the engine--and that line would be the yard lead. It breaks down the train and stores the boxcars, etc. in the three small tracks that you wanted me to eliminate.
I'm back!
Follow the progress:
http://ogrforum.ogaugerr.com/displayForumTopic/content/12129987972340381/page/1
QUOTE: Originally posted by Big_Boy_4005 This is the tweaking that I had in mind. A picture is worth a thousand words. Click on it to enlarge.
QUOTE: Originally posted by SpaceMouse I am working this yard out of pure ignorance I know. I just had a "duh" moment. In my mind I pictured the goat running to the far side of the train, pulling off one car at at time and putting them in the appropriate slot in the three areas. Obviously, in real life the goat would seperate the cars in bunches and there is not room without using the inner loop. I had never intended pulling more that 4-5 cars on this layout. Okay, I just went back to the "Ten Commandments of Yard Design" and I see that I'm not labeling my tracks correctly. The one with the Red end is the yard lead. This is where I take apart and build the trains. I was thinking it was the A/D. My plan only works for a yard of 10-12 cars that are pulled apart one car at a time. As limited in scope as it is, is my thinking wrong here?