Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
Modeling the Reading Railroad in the 1950's
Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.
QUOTE: Originally posted by SpaceMouse It looks like mobile jacks are in the $20 range. Is it possible to run these jacks over at the other table.
QUOTE: Does the Zepher have it's own power supply? I have a Tech II 1400 with 13AV total.
https://tstage9.wixsite.com/nyc-modeling
Time...It marches on...without ever turning around to see if anyone is even keeping in step.