Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

What to do when working on the layout isn't an option?

3890 views
48 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    July 2006
  • From: west coast
  • 7,598 posts
Posted by rrebell on Monday, November 11, 2019 10:35 AM

If you know the space you will have, you can plan and maybe even build a complicated scene that you want on the new layout. Complicated scenes take time and now you have the time, make something  you can box up or hang on a wall.

  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Monday, November 11, 2019 9:57 AM

 I've been designing track plans, and working on electronics. The contractor is starting today to demo my basement and start making it layotu-ready (and I'm not there to see it....)

                                  --Randy

 


Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Monday, November 11, 2019 9:52 AM

SeeYou190
Would you mind sharing the secret again? I am going to get this to work for me.

I'm trying kevin, but I can't get url and /url, in brackets, to show up in my post. Confused

Copy the link, open a new window and paste.  With the link in the address bar, add the url in brackets to the front, and /url in brackets to the end.  Copy that, go back to your post, and paste where you want it, and DON'T use the "link" thingy, just paste right into the post.

Mike.

  • Member since
    June 2018
  • From: Chicago, IL
  • 306 posts
Posted by Eilif on Monday, November 11, 2019 9:30 AM

I agree with the suggestions to build stuff, buy stuff, plan stuff, detail/weather/repair/tune stuff, post stuff, and photograph real stuff.

To that I would add that if you have a sizeable collection, maybe it's a good time to examine and pare back the stuff you don't want.  Trading and dealing can be a fun activity in itself.

Visit the Chicago Valley Railroad for Chicago Trainspotting and Budget Model Railroading. 

  • Member since
    January 2017
  • From: Southern Florida Gulf Coast
  • 18,255 posts
Posted by SeeYou190 on Monday, November 11, 2019 9:00 AM

Thanks for posting a clickable link Mike.

.

Would you mind sharing the secret again? I am going to get this to work for me.

.

-Kevin

.

Living the dream.

  • Member since
    April 2018
  • From: Northern NY (Think Upstate but even more)
  • 1,306 posts
Posted by Harrison on Monday, November 11, 2019 8:09 AM

Learn Guitar, Banjo, ect. or build some structures on small dioramas.

Harrison

Homeschooler living In upstate NY a.k.a Northern NY.

Modeling the D&H in 1978.

Route of the famous "Montreal Limited"

My YouTube

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Monday, November 11, 2019 7:25 AM
  • Member since
    January 2017
  • From: Southern Florida Gulf Coast
  • 18,255 posts
Posted by SeeYou190 on Monday, November 11, 2019 6:29 AM

Rastafarr
The 1:1 cardboard layout cutouts idea is an interesting one; are we talking yard setups? Curve templates? Both?

.

I built the entire layout out of cardboard.

.

This is the link to the original thread about the project:

.

http://cs.trains.com/mrr/f/88/p/262808/2962624.aspx?page=2

.

DRAT: It still is not clickable! I tried the "url" "/url" code, but it still did not work.

.

How do I make a link to a thread in here able to be clicked?

.

-Kevin

.

Living the dream.

  • Member since
    September 2012
  • From: Fraser Valley, BC
  • 538 posts
Posted by Rastafarr on Monday, November 11, 2019 5:03 AM

Lots of interesting suggestions. I've been leaning in the 'buy more rolling stock and do stuff with it' direction, so it's good to have that reinforced. The 1:1 cardboard layout cutouts idea is an interesting one; are we talking yard setups? Curve templates? Both?

Stu

Streamlined steam, oh, what a dream!!

  • Member since
    April 2018
  • From: 53° 33′ N, 10° 0′ E
  • 2,508 posts
Posted by Tinplate Toddler on Monday, November 11, 2019 3:39 AM

Rastafarr
I've got another larger space picked out for the next layout (score!) but it won't be available for trainification until the renos are done.

What timespan ere we talking about? Months? Years? Decades?

If we talk months, maybe up to a year, re-think your plan, make changes, detail the pln and build a couple of structures, if the time permits and you are not to busy renovating your future train room.

If we talk years, well, than may be it pays off to shelve your plans for the moment and build a micro layout, perhaps in N scale, just to keep the interest going.

If we talk decades, look for a different, less space demanding hobby or become a collector.

Happy times!

Ulrich (aka The Tin Man)

"You´re never too old for a happy childhood!"

  • Member since
    May 2012
  • 1,855 posts
Posted by angelob6660 on Monday, November 11, 2019 1:17 AM

Like it said before. Mine are.

1.) Collect freight cars and locomotives for my era. Mostly 1980/90s-06 making sure that removing cars aren't necessarily. Easier to add new ones but older ones do get removed. 

Seeing the types of containers on a train, since most railroads carry different kinds.

2.) Researching my favorite railroads. Looking at locomotive units to see which ones pull particular freights, so easier later on to mix and match.

3.) Designing track plans, structural plans for industries, streets, parking and landscape so it will fit like the real world.

4.) Working on my fictional railroad the Georgia, North Carolina, and Ohio Railway. I love modeling details of my line. I created a railway with over 75 years of history with reporting marks and past freight slogans. Including people, faculties, paint schemes, MW, vehicles, etc.

Example back in the day it was Georgia, No. Carolina Railroad Company G.N.R.C. Then a name change adding the line to Ohio. (As above to G.N.O.R.) I also have a trailer G.N.O.Z., container G.N.O.U., additional more cars G.N.O.F.. 

I had G.N.O.X. but it's been taken by a real leasing company. The weird thing was it was going to be my line of tank cars. 

Modeling the G.N.O. Railway, The Diamond Route.

Amtrak America, 1971-Present.

  • Member since
    March 2018
  • 688 posts
Posted by BNSF UP and others modeler on Sunday, November 10, 2019 11:06 PM

+1 for assembling kits and weathering.

Also 3d designing for car models you want or future layout ideas.

I'm beginning to realize that Windows 10 and sound decoders have a lot in common. There are so many things you have to change in order to get them to work the way you want.

  • Member since
    June 2003
  • From: Culpeper, Va
  • 8,201 posts
Posted by IRONROOSTER on Sunday, November 10, 2019 9:01 PM

Build something small - switching layout, small tabletop, etc.  Use sectional track to get running quickly.

Doesn't even have to be your main scale.

Paul

If you're having fun, you're doing it the right way.
  • Member since
    November 2006
  • From: NW Pa Snow-belt.
  • 2,216 posts
Posted by ricktrains4824 on Sunday, November 10, 2019 5:46 PM

I am in the same situation, layout came down for a remodel, and until that is done, no layout. 

I have been working on models, both assembling kits, and weathering them. Also have been doing detail and lighting projects on locomotives. 

I also do spend some time trackside, and go to shows and museums.

Once the remodel is done, I already have a rough plan in place for the new layout.

Ricky W.

HO scale Proto-freelancer.

My Railroad rules:

1: It's my railroad, my rules.

2: It's for having fun and enjoyment.

3: Any objections, consult above rules.

  • Member since
    January 2017
  • From: Southern Florida Gulf Coast
  • 18,255 posts
Posted by SeeYou190 on Sunday, November 10, 2019 4:47 PM

It has been almost three years since I tore down STRATTON AND GILLETTE number 5 and began the process of getting ready for SGRR #6: The Final Chapter.

.

In that time I have:

.

Built, assembled, and custom painted over 100 freight cars.

Joined this forum and posted over 5,000 comments.

Built a 1:1 cardboard model of my future layout.

Collected all the items I will need to build the future layout.

Travelled as much of our country as I could.

Taken over 300 posed pictues on my 30 by 30 photo diorama studio.

.

-Kevin

.

Living the dream.

  • Member since
    January 2009
  • From: Bakersfield, CA 93308
  • 6,526 posts
Posted by RR_Mel on Sunday, November 10, 2019 4:39 PM

This is something I have to put up with constantly.  I have Rheumatoid Arthritis that intermittently totally dings my ability to work on my layout, often for weeks at a time.
 
We have a bedroom (our hobby room) located just off the door into the garage where my layout is located.  I have a corner computer workstation with a 4’ x 2½’ desk next to it.  While I wait for the pain to subside I work at the workbench on anything that will fit the working space.
 
Just make do with what ever will work with your Train Addiction.
  
 
 
Mel
 
 
My Model Railroad   
 
Bakersfield, California
 
I'm beginning to realize that aging is not for wimps.
 
  • Member since
    October 2001
  • From: OH
  • 17,574 posts
Posted by BRAKIE on Sunday, November 10, 2019 4:05 PM

Easy.

1 Enjoy the layout as long as you can.

2 Detail and weather structures.

3. Weather your rolling stock.

4. Plan your next layout based on your givens and druthers and based good LDEs-Layout Design Elements.. Learn from your mistakes on your currentt layout.

5. Buy the needed track and scenery material.

Options:

Choose a prototype and era.All steam? Transition? Moderern?

Freight and passenger or freight only? 

Main Line? Branch Line? Protolance?

Think about modeling a freelance railroad and develope it..

Think about modeling a short line.

 

Larry

Conductor.

Summerset Ry.


"Stay Alert, Don't get hurt  Safety First!"

  • Member since
    September 2003
  • From: Southeast Texas
  • 5,444 posts
Posted by mobilman44 on Sunday, November 10, 2019 3:40 PM

Hey, you are not alone.  Many of us have been in a similar situation.  

In example, I spent three years in Dallas w/o a layout, and a dozen years here in the Houston area without one as well.  So what did I do?

- I collected and built an awful lot of car kits - ranging from Athearn BB to Silver Streak and Ulrich and Red Caboose, etc.  I would build them, lightly weather, and wrap them in white tissue paper and store them.

- When I moved here in '81, I realized it wouldn't be too long before a room would be available for a layout.  So I spent a lot of time scale drawing layouts.  It really was a great pasttime, especially if you use quadrille paper, and adhere to scale.

- As I got closer to having an empty room to use, I began building structures that I new I would use.  This can really take up time and give you something that will be used when the time comes.

- Lastly, I started to gather "stuff"......stuff that I knew I would use like ballast, ground foam, trees, and so on.  I also picked up flex track if it was a good buy.

Anyway, while I lusted for that layout, the above kept me sane until that time.

ENJOY  !

 

Mobilman44

 

Living in southeast Texas, formerly modeling the "postwar" Santa Fe and Illinois Central 

sol
  • Member since
    January 2007
  • 34 posts
Posted by sol on Sunday, November 10, 2019 3:33 PM

Work on the new plan/plans , then look at the electrical side that will be needed, detail rolling stock, just 3 things to keep the mind & fingers active.

  • Member since
    September 2012
  • From: Fraser Valley, BC
  • 538 posts
What to do when working on the layout isn't an option?
Posted by Rastafarr on Sunday, November 10, 2019 3:30 PM

Okay. So, my current layout is about four years old, still a pinkboard paradise. It's running and running well, but the decision was recently made to undertake a major renovation in a year or two. The space the layout currently occupies will become a bedroom. I've got another larger space picked out for the next layout (score!) but it won't be available for trainification until the renos are done. There aren't any clubs within a feasible distance either; I'm a lone wolf by the circumstances, I'm afraid.

So what to do in the meantime? I'm honestly interested in how people scratch the train itch when working on a layout isn't an option. Hang out by the tracks?

Stu

Streamlined steam, oh, what a dream!!

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!