Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Greenvale Industrial Area Rebuild - February Update

3548 views
2 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    July 2006
  • From: Chamberlain, ME
  • 5,084 posts
Greenvale Industrial Area Rebuild - February Update
Posted by G Paine on Saturday, January 12, 2013 9:56 AM

There have been a couple of mentions of what people are doing for winter projects (in the Northern Hemisphere, that is Smile, Wink & Grin). I have been considering rebuilding the Greenvale industrial area for some time. This part of my layout started about 15 years and 3 houses ago. I needed a bedrooom sized layout, and found one in "Track Plan to Share a Family Room or Bedroom" in the September 1992 MR. I built it as a mirror image to the article track plan.

Over the years, I never really ran it except for the main line loop. I finaly realized the problem was a switchback getting to the Dragon Products cement plant was causing a bottleneck.

It may have been OK for the rural sawmill in the original plans, but really could not support traffic into a large industry like Dragon. The following photos demonstrate. An RS-11 with 2 cement hoppers foul the points; and a 44 Tonner with 2 hoppers justs fits

 

George In Midcoast Maine, 'bout halfway up the Rockland branch 

  • Member since
    July 2006
  • From: Chamberlain, ME
  • 5,084 posts
Posted by G Paine on Saturday, January 12, 2013 10:17 AM

I had originally thought of switching the locations of Dragon and Suburban Propane, and reworking the track accordingly, but it just did not feel right. I decided that a rework of the track plan and benchwork was needed. I started planning by stitching together about a dozen photos of Greenvale using Photoshop Elements to make an "aerial photo" to help my planning.

Fron this, I used Photoshop Elements  to color code what I was going to do with the layout. The yellow area is the South Greenvale Curve that I rebuilt in 2011, I have removed that intact, and will re-use it somewhere else on the layout. The blue area was removed completely. On the red, I have removed all track, buildings and scenery.

I started the demolition about a week ago

My plan is to connect the Dragon lead to the old high line, and run them out on a pennsula about 8 feet long. It will include a passing siding to better switch Dragon. I have a scale house kit that  I bought and did not have room for; I now can use it. The old branch line will go to staging behind the backdrop, representing Augusta, ME. The pennsula will end with a staging yard

Schematically, this the before and after track plan:

I will post more as the project continues...

George In Midcoast Maine, 'bout halfway up the Rockland branch 

  • Member since
    July 2006
  • From: Chamberlain, ME
  • 5,084 posts
Posted by G Paine on Saturday, February 23, 2013 11:47 AM

For the past month, I have been cleaning up the Dragon Cement yard area, laying out roads and RR ROW, and building a scale house kit

The kit is from Builders in Scale; I have had it for a long time, as it did not fit in the previous Dragon plot plan. I built it with both the rail and truck scale pads. The RR scale had non-working gauntlet tracks.

This is what Dragon looks like now. I need to paint some roads, add approach ramps to the truck scale and lay track to the RR scale.

Also, need to get to the lumber yard and buy a couple of 1x6s to make L-girders

George In Midcoast Maine, 'bout halfway up the Rockland branch 

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!