Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Central control pnael or walk around (or combination)?

1530 views
13 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    May 2003
  • From: US
  • 1,398 posts
Central control pnael or walk around (or combination)?
Posted by fiatfan on Friday, August 20, 2004 10:30 AM
I have a central control panel but I use a tether mounted throttle so I can move with the trains if I am switching in another part of the layout.

Life is simple - eat, drink, play with trains!

Go Big Red!

PA&ERR "If you think you are doing something stupid, you're probably right!"

  • Member since
    January 2002
  • From: Portland, OR
  • 3,119 posts
Posted by jfugate on Friday, August 20, 2004 10:48 AM
The Layout Design Special Interest Group (LD SIG) came up with a distinction that I have always found helpful related to this topic.

It all depends on which you prefer to be: railfan or engineer? If you prefer to be a railfan, you actually enjoy being in one location and watching trains roll by. If you prefer to be an engineer, you want to walk with the train, and follow it as it goes along.

And of course, most of us are not purists. We all tend to be some combination of both, some more railfan and others more engineer.

Not only does this preference influence control preferences, but it can affect the entire layout configuration. If you are mostly railfan, then "spagetti bowl" track plans don't bother you as much, because they are more fun to railfan.

On the other hand, if you are mostly engineer and want to follow the train, then a linear walk around layout design that gives a sense of progressing from point a to point b would be a preference.

Very useful way of looking at things, I have found. Are you more railfan or engineer?

Joe Fugate Modeling the 1980s SP Siskiyou Line in southern Oregon

  • Member since
    April 2001
  • From: Netherlands
  • 226 posts
Posted by Nieuweboer on Friday, August 20, 2004 11:11 AM
I have a central control panel next to that part of the layout where most of the swiching takes -place and a satellite panel at another busy switching area. I have a walk around control for following trains and for setting out en picking up cars away from the control panels. I find it a very satisfying set up.
  • Member since
    January 2001
  • From: SE Minnesota
  • 6,845 posts
Posted by jrbernier on Friday, August 20, 2004 12:08 PM
I had a central panel on my 'first' layout(5x9). My current layout is in a 20x25 ft area, and was built with 3 panels and walk around throttles. To do any switching, or even trying to watch why an engine is derailing, you need to be right up to the action - walk around makes sense. I have since converted to DCC and have radio throttles - never would go back!

Jim Bernier

Modeling BNSF  and Milwaukee Road in SW Wisconsin

  • Member since
    December 2003
  • From: St Paul, MN
  • 6,218 posts
Posted by Big_Boy_4005 on Friday, August 20, 2004 12:38 PM
My layout is designed for walk around, but I will be using a computer to perform CTC functions. There was no plan to have a "central control panel", though now that the subject has come up, it would be cool and easy to add a CTC panel and have the option of using a human dispatcher. There will be local mini panels to control non mainline turnouts.

I like to be engineer. My guests can have their choice of railfan or engineer. Pick up a throttle, and you're engineer!![8D]
  • Member since
    July 2003
  • From: Whitby, ON
  • 2,594 posts
Posted by CP5415 on Friday, August 20, 2004 12:50 PM
Combination of both.
My control panel will consist of two throttle packs but 1 throtlle pack I have has a walk-around hand held throttle so that people that won't be able to crawl under my benchwork will still be able to run trains.

Gordon

Brought to you by the letters C.P.R. as well as D&H!

 K1a - all the way

  • Member since
    June 2001
  • From: Holly, MI
  • 1,269 posts
Posted by ClinchValleySD40 on Friday, August 20, 2004 2:00 PM
A lot depends on the layout. With my layout, plenty of walls dividing the layout into sections, no way a central control panel would work.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, August 20, 2004 2:05 PM
Walk around DCC with plug in jacks on every corner and local switch machine panels for switching districts with plug in jacks.
Suits the engineers just fine. Railfans can pull up a chair at a corner, watch 2 sides of the layout at once![:D]
  • Member since
    August 2003
  • From: Midtown Sacramento
  • 3,340 posts
Posted by Jetrock on Friday, August 20, 2004 6:42 PM
My layout is a six-foot shelf layout, if I walk around I get farther from the layout! I eventually want to get a walkaround cab, though.
  • Member since
    December 2002
  • From: US
  • 665 posts
Posted by darth9x9 on Saturday, August 21, 2004 12:16 PM
Walk around for me. My granfather was one for central control and I did that on my first couple of layouts. But now with layouts growing larger and larger, walk around is the only way you can see what is happening.

Bill Carl (modeling Chessie and predecessors from 1973-1983)
Member of Four County Society of Model Engineers
NCE DCC Master
Visit the FCSME at www.FCSME.org
Modular railroading at its best!
If it has an X in it, it sucks! And yes, I just had my modeler's license renewed last week!

  • Member since
    September 2003
  • From: North Central Illinois
  • 1,458 posts
Posted by CBQ_Guy on Sunday, August 22, 2004 2:18 PM
I voted for "Combination" as that's what I'll be doing, but most of the time I'll be walking around with my train as I switch and "do" operations.
"Paul [Kossart] - The CB&Q Guy" [In Illinois] ~ Modeling the CB&Q and its fictional 'Illiniwek River-Subdivision-Branch Line' in the 1960's. ~
  • Member since
    July 2004
  • From: Carmichael, CA
  • 8,055 posts
Posted by twhite on Sunday, August 22, 2004 2:32 PM
Just got the MRC Controlmaster 20 for my 24x24' garage layout. Had to. Seems when I planned the whole thing, the approach to the Summit of my version of the Sierra Nevada ended up facing out toward the street, and my yard's in the middle of the layout against the garage wall. Glad I got one, now I can play engineer all I want. Still learning that if I have a problem or a minor derailment that I can take the control with me to cure it, instead of running back and forth. Of course at my age, running back and forth can't hurt me a bit, can it?
  • Member since
    January 2002
  • From: Along the old Hannibal & St.Joe
  • 94 posts
Posted by cisco1 on Monday, August 23, 2004 2:53 AM
I've got both. A main panel for yard work and setting routes and two walk-around cabs for the rest of the layout. If I revamp one of these days I'll do away with a main panel and convert to full walk-around with automatic blocking. Chris
  • Member since
    June 2001
  • From: Anderson Indiana
  • 1,301 posts
Posted by rogerhensley on Monday, August 23, 2004 7:06 AM
I have a main control panel and two minor panels for yards and a walk-a-round for switching a grain operation. Yes, I can just sit and watch trains run if I wish (or visitors can) or I can take a hands on approach.

Roger Hensley
= ECI Railroad - http://madisonrails.railfan.net/eci/eci_new.html =
= Railroads of Madison County - http://madisonrails.railfan.net/

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!