Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

How Old Is Your Current Layout?

14683 views
50 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    November 2002
  • From: US
  • 4,648 posts
Posted by jacon12 on Thursday, September 3, 2009 2:50 PM

 Thanks George.  I do the same as you though.  I see all the great layouts here and I kick myself for not being out in the trainroom working on the layout.  A couple of years ago I did learn that you CAN start to burn out if you go at it too much.  I backed of for a while and now I enjoy it much better.  Don't want it to get to be a job!

Jarrell

 HO Scale DCC Modeler of 1950, give or take 30 years.
  • Member since
    June 2002
  • From: Michigan
  • 338 posts
Posted by georgev on Thursday, September 3, 2009 2:20 PM

jacon12

 I came to model railroading late in life, after retiring... so my current layout is my first and might very well be my only.  Not having a clue what I was doing when I started approximately 4 years ago it's been a learning experience at every step.  I fully agree with those who say you 'probably' need to build 2 or 3 in your life to get it right.   Smile    (snip......) 

Jarrell

Jarrell,

I would say you are getting it right the first time based on your last picture!  

I obviously spend too much time on dese here forum things and not enough time on the railroad, based on the progress everyone else seems to be making....

George V.

  • Member since
    November 2002
  • From: US
  • 4,648 posts
Posted by jacon12 on Thursday, September 3, 2009 1:55 PM

 I came to model railroading late in life, after retiring... so my current layout is my first and might very well be my only.  Not having a clue what I was doing when I started approximately 4 years ago it's been a learning experience at every step.  I fully agree with those who say you 'probably' need to build 2 or 3 in your life to get it right.   Smile

I was fortunate to have a room roughly 15x21 feet at my disposal and here's a picture of my first attempt(s) at running trains..

and later on building a backdrop from instructions received on the layout forum..

the learning curve was pretty steep.. , and it's still climbing.

though the basic track plan hasn't changed much, there have been quite a few minor and one major adjustment..

Gradually, one step at the time, everything started to come together..

and what seemed like acres of blue foam slowly began to disappear under scenery..


painting the roughly 45 feet of backdrop was a challenge, one I don't want to undertake again any time soon..

and so it continues.  I'm about 1/3rd complete or less, many more years ahead of me..... I hope!

Jarrell

 

 HO Scale DCC Modeler of 1950, give or take 30 years.
  • Member since
    July 2006
  • From: Flushing,Michigan
  • 822 posts
Posted by HaroldA on Thursday, September 3, 2009 12:25 PM

Started this layout 9 years ago in another location but never got beyond wiring because of job pressures and travel.  I retired in 2002 and when I moved to a condo I disassembled the layout and moved it as well,  Not a good idea.  It sat in sections in the garage until last October when I brought it downstairs and reassembled it to a 8X20 G shapped configuration.  Track and wiring are 95% done, DCC conversion is complete, scenery is 5%.  I just work on things as I want and it keeps me interested.

There's never time to do it right, but always time to do it over.....

  • Member since
    April 2003
  • From: Clinton, MO, US
  • 4,261 posts
Posted by Medina1128 on Thursday, September 3, 2009 6:04 AM

I started my current layout in 2000, but there was also a layout move in 2004. Along with the move came a major redesign; it went from 10x12 to 27x18. I lost 10 months of working on it due to health reasons. But the desire for model railroading started in the late 50s, when as a child, my father built a modest layout on a sheet of plywood with an old Marklïn trainset. This was followed by a Lionel set. I built my first permanent layout in the mid 80s when my son was a child.

  • Member since
    April 2006
  • From: THE FAR, FAR REACHES OF THE WILD, WILD WEST!
  • 3,672 posts
Posted by R. T. POTEET on Thursday, September 3, 2009 12:18 AM

MABruce, I like your water, Dude!

From the far, far reaches of the wild, wild west I am: rtpoteet

  • Member since
    April 2006
  • From: THE FAR, FAR REACHES OF THE WILD, WILD WEST!
  • 3,672 posts
Posted by R. T. POTEET on Thursday, September 3, 2009 12:14 AM

Since I am currently without a layout I suppose it would be fair to say that my current layout is ageless!

From the far, far reaches of the wild, wild west I am: rtpoteet

  • Member since
    August 2009
  • From: Vermont, US
  • 86 posts
Posted by Gil Janus on Wednesday, September 2, 2009 11:54 PM

Just a few days ! I've just started building the first 2 shelves of a railroad that should end up going around 2 walls of my bedroom, with 2 removable/storable tables extending into the middle of the room.

To read about it, and see the track plan visit my blog - Gil's Mutterings ...

Gil

Where ever you go, there you are !

  • Member since
    February 2005
  • From: England
  • 1,269 posts
Posted by jon grant on Wednesday, September 2, 2009 5:12 PM

Sweethome Chicago 2004

 

 

2005

 

2006

 

 

2007

 

2008

 

 

2009

(edit) I've just noticed the man in front of Nelson's has been reading that same newspaper for 4 years - must be a good read.

Jon

Sweethome Chicago is now on Facebook

Sweethome Alabama is now on Facebook

Hudson Road is now on Facebook

my videos

my Railimages

  • Member since
    July 2009
  • 236 posts
Posted by Robt. Livingston on Tuesday, September 1, 2009 5:51 PM

The East New York Railroad was constructed 1979, as a two track mainline with a 72" minimum radius.  The track plan was actually more of an egg than a circle, and the minimum radius was about 60" in one spot.  The objective was to model high speed passenger service with electric locomotives and full length passenger cars as used on the NH and PRR, c. 1944, and 50 car freights.  I used live coal loads, which only spilled once due to a derailment. 

The benchwork consisted of 9" wide plywood arcs, 4' long, with a 1x4 reinforcing beam screwed to the underside.  Each section had one leg, with one diagonal brace.  When assembled, it was quite rigid without being braced to the walls of the room.  It was intended to be semi-portable, and was assembled with stove bolts.  When I moved in 1987, the layout had sprouted engine storage tracks and a few sidings and spurs.  

Due to other interests (1/35 WWII armor research, modeling, and war games outdoors), the layout was not reconstructed (beyond the benchwork being reassembled) from 1988-2000. I did build plenty of passenger and freight cars during that time. In 2000, we moved into a new  house we built with a basement designed to house a new, enlarged version of the layout, now with an entire lower deck on L-girder, which was to serve as staging, and a 6x10 peninsula for a freight yard, float bridge, and plenty of open water for the freighter and tugs I had built.  The L-girder and roadbeds for both levels were completed around 2004, the staging track (code 100) in 2008, and the upper level "viewing" track (code 83) is still under construction.  I have no idea when anything will get done. I'm also active in slot car racing (1/32 no-mag) and restoring old plastic models.

 

 

 

       

  • Member since
    December 2002
  • From: Pittsburgh, PA
  • 1,261 posts
Posted by emdgp92 on Tuesday, September 1, 2009 3:55 PM

I started my current layout...way back in 1992 or so. Er, actually, that's when I tore down my first (4x8) layout, and built a small 2x6 section instead. Then I got busy with other things...before I took my trains to college. That would have been around 1995. Since then, it grew to a 10x16 L-shaped layout which runs along two basement walls. Still unfinished though. But, at least I can run some trains, and have fun switching cars. In fact, last month was the first time I'd actually operated it in quite awhile. Before then, most of the rolling stock had been packed away...since the layout room was torn up. When I unpacked the freight cars, I soon found myself with the mother of all switching puzzles Laugh

 

 

  • Member since
    August 2009
  • 5 posts
Posted by ouisconsin223 on Wednesday, August 19, 2009 11:57 PM
to old.
  • Member since
    December 2001
  • From: Smoggy L.A.
  • 10,743 posts
Posted by vsmith on Wednesday, August 19, 2009 5:57 PM

Which part?

I had been over the last 2 years building a 200 square foot 10 x 20 foot layout in my garage (3rd in that spot) but about 4 months ago I had to face the facts that I just didnt have anywhere enough room for the layout, my cars, my bikes, my tools and all the stuff the boss refuses to toss out, so I had to bite the bullet and pull out the layout and switch to a smaller mobile layout (on wheels) that weighs in at a whooping 32 square feet! Thats right, from 10 x 20 to 4.5 x 6.5 feet, but its 3 levels of track! The upper two levels were part of a portable layout and was begun 2 1/2 years ago. Very early this year I added an upper loop to that layout, then when I downsized the fixed layout I built this one so ...the lowest level is 4 months old, the middle is 2 1/2 years old and the upper level is 6 months old.

Now, is that clear Confused 

I thought so....

Oh...Did I mention its G scale? Whistling

Oh well, it will work for now till I have the time to think again about a bigger layout Wink

   Have fun with your trains

  • Member since
    February 2007
  • From: Hershey, Pa.
  • 309 posts
Posted by salt water cowboy on Wednesday, August 19, 2009 10:47 AM

1 1/2 years...

then:

today:

and 10 years to go!!!

Matt

  • Member since
    July 2006
  • From: Bettendorf Iowa
  • 2,173 posts
Posted by Driline on Wednesday, August 19, 2009 10:44 AM

 

3 years old. 11X8 HO shelf layout with NCE DCC control.
Modeling the Davenport Rock Island & Northwestern 1995 in HO
  • Member since
    November 2001
  • From: US
  • 1,720 posts
Posted by MAbruce on Wednesday, August 19, 2009 10:18 AM

1980-1984.  Three attempts at an N-scale layout (in my teens).  Never completed them.  I did find an old test diorama photos of a winter scene I did back then:

 

2001.  Married with kids.  Oldest son finds packed up MRR items.  This inspires me to get back into the hobby.

2002-2003.  After some research and planning, I started and pretty much completed an 11x7 N-scale layout.

2008:  I decide to tear down and re-do the scenery:

 

2009.  Scenery being redone.

Still a lot more to do.... 

  • Member since
    October 2005
  • From: Nashua, NH
  • 430 posts
Posted by Cannoli on Wednesday, August 19, 2009 9:40 AM

 My current 6x8 N scale layout is about 8 months in progress, started shortly after we moved into our current house a year ago. This was my first real entry into the world of N scale, although I've debated the switch several times in the past, even purchasing a few locos and rolling stock in the past, until now I never made the jump from HO.

The layout is in a corner of my basement family room and is being built upon the domino style modules that my HO layout was being built on before we moved.

The is probably the simplest track plan I've designed, I wanted something simple to get up and running and to experiment with different techniques on. The mainline track is done and wired, with the exception of a few bridges that need to be installed. Temporary track and supports have been put into those places to allow for running. The 1 passing siding is in but the spurs still need to be laid.

The track plan also allows for expansion in the future.

View Track Plan

Layout Progress Shots

 

Modeling the fictional B&M Dowe, NH branch in the early 50's.

  • Member since
    January 2004
  • From: Memphis
  • 931 posts
Posted by PASMITH on Tuesday, August 18, 2009 6:41 PM
twenty seven years in two houses. Peter Smith, Memphis
  • Member since
    June 2002
  • From: Michigan
  • 338 posts
Posted by georgev on Tuesday, August 18, 2009 3:14 PM

How about 23 years?  It's still not complete - I have been working my way in sections rather than put up all the benchwork and trying to do all the trackwork at once.  

Many other things happened which is why it’s still under construction - about 70% finished.  Kid’s sports, Boy Scouts, about 5 years of major home renovation when we moved to our current house and some years of constant travel for work all cut into RR time.  

I started in 1986 with a small 5x7 urban area that included a track loop to allow some continuous running for my then 3 year old son.  I was just starting some scenery when we moved to the current house in 1988.  Took about 5 years to finish remodeling -which included turning a dirt crawl space into a finished train room and workshop.  But I got all the carpentry tools now!  Then I got back into the hobby.  I kept my track plan concept (which included the original urban area) but made the RR bigger to fit the new train room (14 x 35).  I have more time to work on the railroad now so it's going a bit quicker, but I do most work in the winter time.  Summer gets spent with yard work, fishing and other stuff outside. 

George V.  

 

  • Member since
    March 2007
  • From: On the Banks of the Great Choptank
  • 2,916 posts
Posted by wm3798 on Tuesday, August 18, 2009 12:07 PM

 

August 2004

September 2004

April 2005

April 2005

April 2005 (Must have been a very productive stretch!)

May, 2005 Installed in the train room.

Lots of evolution since then...

Lee

Route of the Alpha Jets  www.wmrywesternlines.net

  • Member since
    June 2007
  • From: Mankato MN
  • 1,358 posts
Posted by secondhandmodeler on Tuesday, August 18, 2009 10:53 AM

Seeing all of the progress shots helps me more than anything else on this forum.  I love seeing the pulled back shots more than the detail ones.  It gives me ideas for what could fit in a certain area.  Thanks for sharing.  Oh, and I'm a year into my layout with not nearly enough progress!Smile

Corey
  • Member since
    October 2015
  • 163 posts
Posted by Butlerhawk on Tuesday, August 18, 2009 8:53 AM
Started DC layout in 2000 - 4x8; then added a 4x8 to create a L shape but requiring a triangular piece to connect the two pieces to run the trains; over years have added to layout to provide for 2 continuous around the layout tracks, thus necessitating a duckunder (not easy to do at age 79); also have added a few further additions to accommodate a turntable and roundhouse as well a staging yard to handle some of 16 locos and excess rolling on the layout. I have some 40 remote turnouts and 20 blocks. Obviously I had no original plan for my layout and it has grown like topsy, but it does serve my needs and I enjoy working on it. My next project may be to convert my Atlas turntable to a 90' turnout - wish me luck.
  • Member since
    June 2006
  • From: Baltimore, MD
  • 1,726 posts
Posted by CSX_road_slug on Tuesday, August 18, 2009 5:40 AM

BATMAN
...   I guess what I am asking is can any of you offer comments or thoughts of your journey that has become in many cases a masterpiece created by you over the years. Captions to photos are nice but but they don't reflect on how you got to where you are today. Before and after photo's would be great also.  ...

How old is my layout? Hmmm lemme see, I guess it depends on whether you start when I began building benchwork (9 yrs ago), or when I actually laid some track (4 yrs).  Here is a timeline:

August 2000: Benchwork erected

November 2000: Discover that the garage where I'm building my layout can get horribly cold; also learn that I can NOT use the existing physical plant to pipe heat/AC into the garage, the BTU's simply aren't there.  Money is not available for a new heat pump because the wife got laid off from her job.

August 2001: Benchwork awaits track

August 2002: Benchwork has some overflow junk stored on top of it.

August 2003: Benchwork has a huge amount of junk piled on top of it.

August 2004: Wife gets another job, gives ultimatum: Install some track and trains by next summer, or tear out the benchwork so we can park our cars in the garage!

March 2005: 12500-BTU heat Pump/AC unit installed

April 2005: All mainline track laid

May 2005: Leftover Steel Mill modules integrated into layout; yard track laid

August 2005: Track wiring completed for standard DC, trains now operational - YESSS!!

September-December 2005: Laid down some basic scenery/structures

January 2006: Unpacked and reassembled large steel mill structures

February-June 2006: Additional scenery & track ballasting

February 2007: Begin conversion to DCC

December 2007: Final loco in active fleet gets decoder installed

November 2008: First Group Operating Session

April 2009: Commercial District installed

Here are some b4-and-after pix:

 

Yard track obscured by buildings

(Yard track is hidden behind foreground buildings)

-Ken in Maryland  (B&O modeler, former CSX modeler)

  • Member since
    July 2004
  • From: Carmichael, CA
  • 8,055 posts
Posted by twhite on Monday, August 17, 2009 8:45 PM

Brent: 

I had to go back and look up the year I started the current Yuba River Sub because it seems I've been working on it FOREVER, LOL!   Turns out I started it the same year I joined this Forum--2004. 

I'd built another California Basement (garage) empire before that, but it never really worked well, because of simple bad planning.  The current one is far from perfect, but the track plan and construction is much better, and also allows me a lot of leeway for improvement as I work on it.  

I think this will be my final effort (but never say never, right?Tongue) but even the mistakes I have made on this one still allow for additions to it without having to tear the basic one up.  And I've become much better at wiring and semi-'bullet proof' tracklaying this time around.  Not too many derailments, and those that happen usually are the fault of the rolling stock, not the track itself.  It's DC (for personal reasons), routed into blocks and relatively easy to work since I'm what is called a "Lone Wolf", even though it's a relatively large (24x24') layout.  It's got a good control system, I can run several trains at once without having to run around throwing block switches (well, mostly, LOL!).

Barring the addition of a future staging yard, the trackage is complete, and the scenery is about 45% installed.  Lots of work to do there, but it doesn't interfere with my operation. 

Some shots, if you're interested:

Yuba Pass

  

Sierra Buttes:

Bullards Bar:

Yard at Deer Creek:

Lots done so far, and a LOT to do in the future. 

Tom Smile

  • Member since
    July 2006
  • From: 4610 Metre's North of the Fortyninth on the left coast of Canada
  • 9,352 posts
Posted by BATMAN on Monday, August 17, 2009 7:56 PM

 Thanks for all your responses, I enjoyed them all.  Last night I ventured into the trainroom to work on the layout and soon my ten year old son joined me( Mr video games) We spent two hours running trains with no work done. It was the best night i have had in the trainroom. And by the sounds of it, Rome wasn't built in a day and neither are our empires. Thanks again for your stories and if anyone else would like to contribute,please do.Smile

 

                                                                      Brent

Brent

"All of the world's problems are the result of the difference between how we think and how the world works."

  • Member since
    January 2009
  • From: Moline, Illinois
  • 23 posts
Posted by shagspastic on Sunday, August 16, 2009 3:31 PM

My layout is approx. 17 by 23 . It's still in the early stages. Been working on it for 7 months. All the bench work is done and i've got about half of the mainline laid. It will probably be another 6 moths before all track is laid and the wiring is done . It's hard to not start on the scenery yet but I think all trackwork and wiring should be fully functional before any scenery is even thought about. But anyway it's alot of work in progress and I'm loving every minute of it.

  • Member since
    May 2007
  • From: East Haddam, CT
  • 3,272 posts
Posted by CTValleyRR on Sunday, August 16, 2009 1:56 PM

There are structures, locos, and rolling stock on my layout that were built in the early 70's.

The benchwork on the current one was built in 2003.  Some of the terrain contours and trackwork are that old, too, but a lot of it was ripped out and redone in 2004-2005.  Scenery on the older section dates from 2004.  Some newer scenery dates from, let's see, August 15, 2009!

 

Connecticut Valley Railroad A Branch of the New York, New Haven, and Hartford

"If you think you can do a thing or think you can't do a thing, you're right." -- Henry Ford

  • Member since
    July 2006
  • From: Bettendorf Iowa
  • 2,173 posts
Posted by Driline on Saturday, August 15, 2009 5:40 PM

up1853
my layout is only 3years.
Size is 5ft1/3 x 9ft plus wye track and control by Digitrx DCC.
1.      Track plan is as follows
http://blogs.yahoo.co.jp/up1853/38040787.html
2.      photo and movie
thanking you

 

 

Very Nice looking video.

Modeling the Davenport Rock Island & Northwestern 1995 in HO
  • Member since
    July 2006
  • From: Bettendorf Iowa
  • 2,173 posts
Posted by Driline on Saturday, August 15, 2009 5:34 PM

 Current Layout started April 2006

 

70% complete Today....


Modeling the Davenport Rock Island & Northwestern 1995 in HO

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!