I too thought of buying a mobile home after seeing Harry's "Little Colorado". In Part 107 of the Up Clear Creek series, Harry notes the structure weakness when taking walls out of a mobile home. I suggest reading this article before going too far into such plans.
My stub switches are ready for movement.
And I've made a short video from the movement.
Wolfgang
Pueblo & Salt Lake RR
Come to us http://www.westportterminal.de my videos my blog
Hello Wolfgang
It is great to see your progress, looks like you have been very busy. I have gone narrow gauge myself (On30) but so far all I have done is start a gondola kit, I have a long way to go. Can't wait to see something running on those tracks.
Tom
The second bridge is in place, all rails are laid. Now I have to work under the segments.
When wiring is done I can test run - and take more pictures.
Work goes on. The first stub switch is soldered and glued down. I have still to build my usual push-pull-device.
The second the last crossing at Silver Creek is finished. Remember: H0n3 code 55 !!
Tha hardest part were the inner guard rails.
I've - due to my lack of an engine - pushed a car. Great.
Now I have only to wire this piece, but that's no problem.
The second crossing is built in place.
You see, it's next to the segment border. Ties are Kappler ties and PC board ties. Track will be code 55 like the other narrow gauge track. I will cut the rails to separate the segments when the crossing is finished.
Wiring is easy with the segments put on edge.
Now I've cut the rails at the segment border.
And an overview. This type of special turnouts you can't make with jigs. All I need is the NMRA gauge and soldering tools. I made also a drawing with the centerline and tie border line. You can see this revised plan:
Now I can turn the segments on edge and do wiring as well as the mechanical device for the turnouts.
With this curved crossing all elements for the first two segments are finished and ready to glue down.
Trackwork:
The dual gauge track are tie strips from Central Valley. I've glued the third rail onto it.The PC board ties are at the segment border and for safety.
You see the crossing is next to the segment border and its curved.
I've built more turnouts, nos 2, 3, 4 and 5 and the first crossing. Remember, only Turnouts 1 and 2 are dual gauge and code 70, all other trackwork is code 55:
This is the first H0n3 crossing.
Only one crossing more and two stub switches to build. But at first I have to glue these trackwork down and do some wiring.
Still waiting for bridge ties this part of the project has a break.
Now I've started with track work. Here's the first dual gauge code 70 turnout. With my "new" throw bar type. This turnout is made with PC board ties and wooden ties between.
CS_NG_FanLooking good! When it comes to water, I always use black. When I did the rivers and streams on my layout, here is the process I used;
Thank you for the tips. I will see what I can use with my gloss varnish.
But that's for me easy to get at a shop.
Hi Wolfgang,
Looking good! When it comes to water, I always use black. When I did the rivers and streams on my layout, here is the process I used;
Now I've started with water. The first step was a basic layer of gloss varnish. Next step will be some color, black, blue, ...
The crew used some dynamite to get the rock ready for the last bent.
And the other direction with trestle.
The mud sills are fastened to the foundation. I've also used NBWs.
And now the water....
To maintain a consistent level of detail, bolt the trestle to the piers.
markpierceMuch better. Mark
Mark
One picture more.
wedudler Silver Creek update More work with the trestle.
Silver Creek update
More work with the trestle.
Much better.
My son Benjamin suggested to create a hill between the two tracks in the middle of the module. Some rocks there.
What do you think?
I'm still waiting for the 8x8 strip wood to make bridge ties. The bents are now parallel to the flowing water. Like you see, the creek will be only at one side of the valley. I've added a few rocks there, too.
reklein Wolfgang,maybe you were here in another life?? Maybe you were an Apache warrior.Maybe! BILL
Wolfgang,maybe you were here in another life?? Maybe you were an Apache warrior.Maybe! BILL
Nope, probably Navajo, Ute, or Zuni.
markpierce... Strange. Your scene looks similar to my photo of the San Juan River. The river flows along the cliffs on one side of the valley, with the flattish valley extending some distance on the other side. (Note: The San Juan carries very silty water. The river is shallow yet fast-flowing, and is brown in color.) Mark
I've never been to the USA. So this similar look is only incidentally.
Just my but one also has to take into account that in the southwest there might be water in those "washes,gullys, arroyos" only temporarily and in gret quantities only to be gone in as little as a few hours. These gullies can't be filled because of the great amounts of water and debris when they flood. Excellent point Mark. BILL
wedudler Mark, you're right. Thank you for the tip.
Mark, you're right. Thank you for the tip.
You're welcome.
... Strange. Your scene looks similar to my photo of the San Juan River. The river flows along the cliffs on one side of the valley, with the flattish valley extending some distance on the other side. (Note: The San Juan carries very silty water. The river is shallow yet fast-flowing, and is brown in color.)
markpierceIt isn't too late to re-engineer that trestle! Mark
It isn't too late to re-engineer that trestle!
I would be angry for the next years. Knowing better and doing worse.
I rebuild!
wedudler Can you use piles at rocky ground? I think, they wouldn't try to drive the piles into rock. Therefore the square timbers with foundation. Wolfgang
Can you use piles at rocky ground? I think, they wouldn't try to drive the piles into rock. Therefore the square timbers with foundation.
Depends on how deep the silt has built up over the millenia filling in the once-steep valley....And even if the stream "meanders," there would be times of high, fast-moving water. If the water is above the foundations of the square-timber bents, this would be a period of high water and fast flows. That truss bridge looks a lot better off than the poor trestle! It isn't too late to re-engineer that trestle!
Mark, you're right.
But couldn't be the foundation under water?
And the creek meanders.
In any other case I had to build this trestle new.