skewed plate girder bridge

9203 views
29 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    February 2004
  • From: Batavia, IL
  • 3 posts
Posted by dalemuir on Wednesday, July 25, 2012 11:51 AM
  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Wednesday, February 8, 2012 2:20 PM

hon30critter

Looks good!

Just out of curiousity, is that homasote roadbed?

Thanks

Dave

Yup.  Homabed.  I am a dinosaur....I still hand lay some track.

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,797 posts
Posted by hon30critter on Tuesday, February 7, 2012 9:14 PM

Looks good!

Just out of curiousity, is that homasote roadbed?

Thanks

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Monday, February 6, 2012 2:30 PM

Day job....

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    January 2010
  • From: Denver, CO
  • 3,576 posts
Posted by Motley on Monday, February 6, 2012 11:57 AM

You don't waste any time do ya...LOL

Michael


CEO-
Mile-HI-Railroad
Prototype: D&RGW Moffat Line 1989

  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Monday, February 6, 2012 11:41 AM

A LONG time later...the bridge is finally cut in.

 

 

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Wednesday, June 18, 2008 6:32 AM
 steemtrayn wrote:

How about this:

Thanks!  I think this is what I need to do. 

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Tuesday, June 17, 2008 10:44 PM
 steemtrayn wrote:

Does this pic help?

http://maps.live.com/default.aspx?v=2&FORM=LMLTCC&cp=qs8syp8t8xvt&style=b&lvl=2&tilt=-90&dir=0&alt=-1000&scene=18507461&phx=0&phy=0&phscl=1&encType=1

 

The bridge shown appears to have a ballasted deck, albeit while still retaining the closely-spaced bridge ties.  As I mentioned in my last reply, the bridge ties extend onto and over the abutments, with all ties at right angles to the rails.  I have never seen a bridge where the ties have been intentionally skewed, although I don't get out too much. Whistling [:-^] 

Edit: steemtrayn's latest photos, posted while I was typing, illustrate the make-up of the skewed bridge shown in his original link, and most adequately illustrate what needs to be done.

Wayne 

  • Member since
    July 2002
  • From: Jersey City
  • 1,925 posts
Posted by steemtrayn on Tuesday, June 17, 2008 10:33 PM

How about this:

  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Tuesday, June 17, 2008 8:55 PM
 steemtrayn wrote:

Does this pic help?

http://maps.live.com/default.aspx?v=2&FORM=LMLTCC&cp=qs8syp8t8xvt&style=b&lvl=2&tilt=-90&dir=0&alt=-1000&scene=18507461&phx=0&phy=0&phscl=1&encType=1

 

Yes!  This helps.  Although it's a different approach from what Nick describes.  I think since my skew angle is so high, I should do something like the arial photo.

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    April 2003
  • From: Martinez, CA
  • 5,440 posts
Posted by markpierce on Tuesday, June 17, 2008 5:44 PM

Mark

  • Member since
    April 2006
  • From: THE FAR, FAR REACHES OF THE WILD, WILD WEST!
  • 3,672 posts
Posted by R. T. POTEET on Tuesday, June 17, 2008 5:27 PM
 markpierce wrote:

 R. T. POTEET wrote:

V. S. Roseman had an article on this very subject in this April's issue of the Journal. He has graphics showing how this is done on the prototype. I purchased this issue because if my current plans for a new layout attain fruition I will need a couple of skewed bridges. 

Would it have been difficult for you to have briefly provided the pertinent information from this article that would have addressed the gentleman's question?   Unless it is a lengthy and complex issue, that would have been more helpful, especially if it is inconsistent with the input provided by others on this thread.  I'm interested in the subject but it is often difficult and time-consuming to chase down a particular publication.  Thanks.

Mark



His question was:
Can someone shed some light on this for me?
and my answer was: YES! V. S. ROSEMAN CAN!

. . . . . . . . . . Now that we have all manifested our Rocket Scientist mentality for Tuesday, the 17th day of June in the year of our Lord Two Thousand and Eight . . . . . . . . . .

From the far, far reaches of the wild, wild west I am: rtpoteet

  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Tuesday, June 17, 2008 5:24 PM

I'm not Wayne, but I've got your answer.

The 'rails between the rails' are bridge guard rails, and they are spaced far enough from the running rails that a derailed wheel will drop down between them and ride either on the ties or on the base of the guard rail.  That holds the derailed truck in line, so the derailed car will (hopefully) remain coupled and not get over far enough to damage the bridge structure.

They are frequently smaller than the running rails, always taper together as shown and sometimes are joined at the ends with special, made-for-the-purpose castings similar to frog castings without the guard rails.

Chuck (modeling Central Japan in September, 1964)

  • Member since
    April 2003
  • From: Martinez, CA
  • 5,440 posts
Posted by markpierce on Tuesday, June 17, 2008 5:21 PM
 sfrr wrote:

Wayne, please excuse my ignorance to the world of trains, but what do the rails in the middle of the track on that bridge do?

Thanks,

Mike

The guardrails were there to reduce the effects and possibility of a derailed but moving car hitting the bridge structure or pulling the train into the abyss.  They were sometimes seen in tunnels for similar reasons.  On a curve, sometimes only the inner rail would have a guard rail.

Mark

Mark

  • Member since
    November 2006
  • From: St. Peters, Missouri (USA!)
  • 163 posts
Posted by sfrr on Tuesday, June 17, 2008 5:05 PM

Wayne, please excuse my ignorance to the world of trains, but what do the rails in the middle of the track on that bridge do?

Thanks,

Mike

  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Tuesday, June 17, 2008 4:58 PM

Actually, the OP's use of the word "decking" is confusing the issue:  as I read it now, he's referring to the ties on the bridge.  As others have mentioned, if the bridge has a "floor", then the entire bridge will be ballasted, and the ties will be spaced as with regular track.  If the bridge has an open deck (steel framing only), then the ties will be spaced closer together - it would make sense if the closely spaced ties extended along the track beyond the outer edges of the skewed abutments.  As also mentioned, ballast would be placed between the ties, regardless of the tie  spacing, anywhere that there was something beneath the ties upon which it could rest.  When viewed from above, all of the ties, both on and beyond both ends of the bridge, would be at right angles to the rail, and the end of the ballast would follow a line parallel to the skewed abutments.   As you can see in the photo below, even though the bridge is not skewed, the bridge ties extend beyond the bridge onto the top of the abutment, and are ballasted the same as the regular ties.  Also visible are the guard rails, which extend well beyond the abutments.

Wayne 

  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Tuesday, June 17, 2008 2:34 PM
 nbrodar wrote:

Pulling some info from MR's Bridges, Trestles and Tunnels

  • The end floor beam should be parallel with the abutment.
  • The bridge ties are square to the girders.  Although, they may be cut short and mitered to fit approaching the skewed end.
  • The ties on the approach to the skewed on the bridge, are gradually rotated parallel with the abutment.

Hope this helps.

Nick 

 

Got it!  Thanks, everyone.

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    April 2003
  • From: Martinez, CA
  • 5,440 posts
Posted by markpierce on Tuesday, June 17, 2008 1:23 PM
 jeffers_mz wrote:
[

Clearly, your ballast won't stay between ties over empty space. The last bay between ties, that's over the concrete abutment is the last tie bay that will hold gravel. However, your ties are at an angle to the abutment, so the gravel line, as seen from above, will assume a stairstepped angle pattern. In short, the last ballast will rest on the riverward edge of the abutment.

After the steel and ties are in, you sprinkle, and the same laws of gravity that govern the lay of ballast on the prototype will govern your layout, right down to the overspill down on the river bank, if, of course, your track workers don't sweep it up.

Do what the prototype railroads prefer to do.  Lay a solid deck on top of the bridge girders.  This deck will hold the ballast.  Use regular ties and ballast on the bridge.  (I know I already said that but I'm not sure everyone was listening.)

Mark

  • Member since
    June 2005
  • From: Phoenixville, PA
  • 3,495 posts
Posted by nbrodar on Tuesday, June 17, 2008 1:17 PM

Pulling some info from MR's Bridges, Trestles and Tunnels

  • The end floor beam should be parallel with the abutment.
  • The bridge ties are square to the girders.  Although, they may be cut short and mitered to fit approaching the skewed end.
  • The ties on the approach to the skewed on the bridge, are gradually rotated parallel with the abutment.

Hope this helps.

Nick 

 

Take a Ride on the Reading with the: Reading Company Technical & Historical Society http://www.readingrailroad.org/

  • Member since
    November 2005
  • 1,223 posts
Posted by jeffers_mz on Tuesday, June 17, 2008 1:13 PM
 oltmannd wrote:

I am using a skewed plate girder bridge with a timbered deck on my layout.  That is, the abutments are not at right angles to the bridge.  I am uncertain what the design of the transition from the bridge deck to the balasted right of way looks like.  Since the bridge timbers have to continue the full length of both plate girders, how is the "overhang" handled? 

Can anyone shed some light on this for me?

Picture of bridge resting roughly where it will go in...

 

The abutment carries 4 end to end steel members, the two main plates, and the stringers/bearing beams directly under the rails, The ties then sit atop the stringers, rails atop the ties.

In a skewed bridge, both ends of all four will assume the same angle as the abutment.

The crossmembers running side to side carry the rail load out to the big plates. Since longer beams sag more than shorter ones, the crossmembers always run perpendicular to the plates, and parallel with the ties.

Since you don't want the stringers under the rails to tip over sideways, you'd fix them against rotation, box them off at each end, at the same angle as the abutment, generally flush with the landward edge of each abutment, with material similar in cross section to the cross members.

Clearly, your ballast won't stay between ties over empty space. The last bay between ties, that's over the concrete abutment is the last tie bay that will hold gravel. However, your ties are at an angle to the abutment, so the gravel line, as seen from above, will assume a stairstepped angle pattern. In short, the last ballast will rest on the riverward edge of the abutment.

After the steel and ties are in, you sprinkle, and the same laws of gravity that govern the lay of ballast on the prototype will govern your layout, right down to the overspill down on the river bank, if, of course, your track workers don't sweep it up.

If the river is already poured when you ballast, you'll probably need to protect the surface, or else have access and a method for removing the gravel from floating on the river.

 

 

  • Member since
    April 2006
  • From: THE FAR, FAR REACHES OF THE WILD, WILD WEST!
  • 3,672 posts
Posted by R. T. POTEET on Tuesday, June 17, 2008 1:11 PM
 oltmannd wrote:
. . . . . . . . . . I also can't see them being half on the bridge and half on the ground . . . . . . . . . .
Why not? Roseman's article has a number of overhead shots with skewed sides resting on skewed supports and the ties are full length because the ballast runs completely onto the bridge and supports the ties.

I will presume that it is your intention to use bridge track which, I believe, has closer tie spacing than on other track. Whether it is closer or not shouldn't pose a problem because all you're going to have to do is run the bridge track onto solid ground and at that point resume with regular track.

From the far, far reaches of the wild, wild west I am: rtpoteet

  • Member since
    April 2003
  • From: Martinez, CA
  • 5,440 posts
Posted by markpierce on Tuesday, June 17, 2008 12:59 PM

 R. T. POTEET wrote:

V. S. Roseman had an article on this very subject in this April's issue of the Journal. He has graphics showing how this is done on the prototype. I purchased this issue because if my current plans for a new layout attain fruition I will need a couple of skewed bridges. 

Would it have been difficult for you to have briefly provided the pertinent information from this article that would have addressed the gentleman's question?   Unless it is a lengthy and complex issue, that would have been more helpful, especially if it is inconsistent with the input provided by others on this thread.  I'm interested in the subject but it is often difficult and time-consuming to chase down a particular publication.  Thanks.

Mark

  • Member since
    April 2003
  • From: Martinez, CA
  • 5,440 posts
Posted by markpierce on Tuesday, June 17, 2008 12:40 PM
 oltmannd wrote:

Thanks.  I'll have to try to find a copy...

The part I'm having the most trouble with is understanding the bridge timbers (ties on the bridge).  They must always be perp. to the rail and can't be cut at the abutment.  I also can't see them being half on the bridge and half on the ground, since their spacing is too close to allow a proper amount of ballast.

The girders at the bridge ends need to be modified so they end up parallel (at the same angle) as the abutments.  Also, cement or stone was more common for abutments for steel bridges as opposed to wood timbers, although wood timbers were often used when a wood trestle abutted the steel bridge.

If you used a ballasted deck, you would use normal ties on the bridge.  ("Timber" the bridge floor and add ballast after laying the track.)  Then you wouldn't be concerned with a "half-on-half-off" issue with the heavier bridge ties associated with an open deck.

Both guard rails should extend at least to the maximum abutment length.  It wasn't uncommon (if not the norm) to see the guard rails extended even further.

Mark

  • Member since
    September 2002
  • 7,486 posts
Posted by ndbprr on Tuesday, June 17, 2008 12:36 PM
The horizontal members are skewed so that they join the side members where they end.  Now I have not personaly checked on one but I surmise that they then form a triangle with traditional horizontal members once they can be strung from side to side.  Reason for this is so the engineers can place an "off the shelf" designed bridge with a couple of triangular extenisons in position with minimal additional engineering (if it ain't broke don't fix it).  That would be the most cost effective.  Alternately they may already have plans for skewed bridges in their system they would draw upon but I doubt it.   
  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Tuesday, June 17, 2008 12:20 PM

Thanks.  I'll have to try to find a copy...

The part I'm having the most trouble with is understanding the bridge timbers (ties on the bridge).  They must always be perp. to the rail and can't be cut at the abutment.  I also can't see them being half on the bridge and half on the ground, since their spacing is too close to allow a proper amount of ballast.

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Tuesday, June 17, 2008 11:46 AM

The transverse structural members at both ends would most likely be skewed to reach the opposite girders, with the longitudinal members shortened accordingly. The end transverse members would then be parallel to the abutments, with any decking ending at their outer edges.

Wayne 

  • Member since
    April 2006
  • From: THE FAR, FAR REACHES OF THE WILD, WILD WEST!
  • 3,672 posts
Posted by R. T. POTEET on Tuesday, June 17, 2008 11:35 AM

V. S. Roseman had an article on this very subject in this April's issue of the Journal. He has graphics showing how this is done on the prototype. I purchased this issue because if my current plans for a new layout attain fruition I will need a couple of skewed bridges. 

From the far, far reaches of the wild, wild west I am: rtpoteet

  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Tuesday, June 17, 2008 11:12 AM

I can't say for sure, but the decking would not likely extend beyond the ends of the bridge - in other words, it would be cut at an angle to the track.  Most "deck" girder bridges were open, with no actual wooden decking, while through girder bridges were either open-decked, or ballasted.  Nowadays, ballasted bridges are preferred, as it's easier to maintain the track elevation and alignment.

The only bridge on my layout which is skewed is a ballasted deck girder, and I didn't even install guard rails on it - for the "engineer" on a train, it's hardly noticeable as a bridge.  Most of my other bridges are also deck-types, either girder or truss, with many on curves.  Since I made all of these bridges removable, I extended both the closely-spaced bridge ties and the guard rails beyond the abutments - not strictly prototypical, but convenient for the situation.  I'd suggest that you extend both guard rails at least onto the abutments, if not beyond, though.

Surprisingly, any photos of my bridges showing this detail seem relatively scarce:Smile,Wink, & Grin [swg]

Wayne 

 

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!