Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
QUOTE: Originally posted by Roadtrp I've found EZ track great to work with. Just the track though, not the turnouts. I agree with the above assessment. I only have 6 turnouts on my layout, but I've spend hours and hours getting them all to work reliably. Usually just filing down the points does it, but occasionally I need to work with the frog also. My grade for EZ Track: Track B+ Turnouts D+