Well, maybe the month of weekends...
I finally finished running the plethora of wires from my new staging yards to the back of the control panel. This time I actually followed my own advice and carefully bundled and labeled everything. Still need to connect the panel to the wiring runs though...
Back of panel terminals:
Under layout wiring runs:
Track Connections:
Along the way, I realized just how lax with the organization I had been with the old wiring...So my next project, while I have everything out from under the layout, will be cleaning up the old wiring to reflect my new standards.
Nick
Take a Ride on the Reading with the: Reading Company Technical & Historical Society http://www.readingrailroad.org/
Congratulations, Nick. I hope to be as disciplined for my next layout. I tend to push, push, push so that I can run trains, with the resultant mess.
-Crandell