Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Programming track for Digitrax

1646 views
6 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2006
  • From: North Carolina
  • 758 posts
Programming track for Digitrax
Posted by Aikidomaster on Saturday, January 2, 2010 9:15 AM
I am new at DCC. I have a Digitrax Empire Builder. I have begun wiring the layout (which is in its very early stages) for DCC. I am not certain how to wire a programming track. I have a spur track that I have electrically isolated from the rest of the layout. I have 22 gauge wires connected to this track. Where do I go from here? The manual makes it look like I need to connect these wires to the bus, but that does not make sense. Please help.

Craig North Carolina

  • Member since
    July 2003
  • From: Sierra Vista, Arizona
  • 13,757 posts
Posted by cacole on Saturday, January 2, 2010 9:42 AM

 The safest thing is to wire that stub siding to only the programming track terminals on the DCC system and never use it for anything else.  If you do want to run trains onto or off the programming track, you can wire it through a Double-Pole, Double-Throw toggle switch connected to both the programming track and main track output terminals.

 

  • Member since
    October 2006
  • From: Western, MA
  • 8,571 posts
Posted by richg1998 on Saturday, January 2, 2010 10:32 AM

At a club I belong to, we have the NCE Power Cab which has terminals for the main and program track. When we use the program track, the Power Pro shuts down the main. We also have a program track with dpdt switch.

Rich

If you ever fall over in public, pick yourself up and say “sorry it’s been a while since I inhabited a body.” And just walk away.

  • Member since
    July 2008
  • 1,206 posts
Posted by mfm37 on Saturday, January 2, 2010 10:44 AM

richg1998

 

At a club I belong to, we have the NCE Power Cab which has terminals for the main and program track. When we use the program track, the Power Pro shuts down the main. We also have a program track with dpdt switch.

Rich

 

 

Unfortunately, Empire Builder doesn't work that way. Empire Builder programs at full power through its track outputs. 

There are directions in the Empire builder manual around page 27 for connecting the programming track through a DPDT switch. It cuts power to the main line and connects power only to the program track. The same could be done using a plug on the main track bus and a duplicate plug on the program track leads. Install a socket on the Track A and B output wires and just plug in the appropriate track.

Martin Myers

  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Saturday, January 2, 2010 11:19 AM

I use the DB150 Super Empire Builder with the output bus wires running from the terminals to a DPST.  It has a toggle that permits power thrown one way and turns off power flipped the other way.

The power bus terminates on the middle poles, but also wrapped around those screws are two thinner feeder wires leading directly above to my 24" gapped turntable lead.  On the other two (end) poles of the DPST, heavier bus wires continue their task of running power to the rest of the layout under the main axis of the bench.

When I want to programme an engine, particularly the address, I place it on the programming track only after I have flipped the toggle on the DPST.  When I do that, the rest of the layout, fed from the two end-poles, goes dead.  But remember that I have two sets of wires sharing the center input poles, so those poles are live.  That means my programming track also remains live.  Once I have done my address change, I merely have to reach under the bench once more, flip the toggle, and the rest of the layout comes back to life.  I then run the newly addressed engine off the lead to join the rest of the engines, out onto the main, and continue to alter the behavioural characteristcs in Ops Mode, including tweaking chuff rates, individual volumes, inertia and momentum...the usual.

-Crandell

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!