QUOTE: Originally posted by jshrade So even though 1.5% is considered steep for the prototype, 3% wouldn't be out of the question on an HO layout, right?
I tried to sell my two cents worth, but no one would give me a plug nickel for it.
I don't have a leg to stand on.
Dave H. Painted side goes up. My website : wnbranch.com
Andy Sperandeo MODEL RAILROADER Magazine
QUOTE: Originally posted by jshrade I figure there's a simple formula to it, like 'x' number of feet of rise over every 100 feet of run, thus if the track rose 3 feet over the course of a 100 foot section of track, it would be a 3% grade, is that right? What is the correct way to measure grade percentage?
QUOTE: Originally posted by jshrade Also, in modern railroading terms, what would be considered 'steep' for mainline Class 1 railroads?