a while ago a posted about the 4 x 8 layout the red wing. I would like to thank those that gave me some helpful suggestions about making the design a little more suitable for me. AS was suggested I have decided to drop the lead going to the industrial area and will use a curved turnout for that area. Instead of a four track yard/staging area I will go with three. I think with a small area to work with like a 4 x 8 that less is more. My question is do any of you know what size the turnouts are? Are they all small or are the tracks coming off the main large? Am using peco's that I have from previous modules. Thanks to all.
Kirk