Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Turtle Track?

864 views
4 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    October 2004
  • From: Colorful Colorado
  • 8,639 posts
Posted by Texas Zepher on Wednesday, November 8, 2006 12:18 AM
 Metro Red Line wrote:
In my N scale layout plan I have something I call a "Turtle Track." It's a section of track that ... trains go in there and "park" there, out of sight, to give the illusion that the train has gone to some faraway destination.  Anyone have this on their layouts or has seen something like it?
Yes, in my 1980 vintage N-scale Pine Ridge & North River I had three such tracks.  My big mistake was not making them as long as was possible.  Of course they were originally (1974) the "front" of the layout and part of the main yard.  At the time I switched which the "front" of the layout was and put them under the mountains, I just called them hidden sidings.  Since then the term "staging" has come into common useage and I used it on this layout diagram made in 2005 right before it was razed.

  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Tuesday, November 7, 2006 11:35 PM

 larak wrote:
Isn't this commonly called 'hidden staging'? I do it with a set of five full sidings on a double track main.. Bring in one train and bring another out the far end. I think that this is fairly common in either single or double ended form. You do need a way to keep track of what is on the hidden tracks.

Karl

A single short single-ended track sounds like a good spot to park an RDC (aka DMU), which can run either way and still look right.  EMU (rapid transit cars) also work.

The section of layout I'm presently working on will be able to hide up to eleven complete freight trains as well as the EMU cars that generate a substantial portion of my passenger traffic.  What looks like ordinary double track enters two parallel tunnel portals.  If a train enters the down tunnel, the one guarantee is that the same train will NOT reappear from the up tunnel any time soon.  What WILL appear is whatever the timetable says is supposed to run in that time slot: EMU, DMU, through freight, local, empty unit coal train or whatever.

The train that disappeared may (or may not) return in a few full-scale hours, probably the following day.  Of course it could reenter the scene with a different locomotive, or swapped open car loads, or empty cars that were previously loaded with coal - or even at the other end of the mainline, a couple of scale kilometers away on a different peninsula.

Hidden staging provides wings in which our actors can wait out of sight until they get the cue to appear on the visible stage.  The more complex your operating scheme, the more hidden staging you need.

Chuck (whose through trains operate from staging to staging, changing engines enroute.)

  • Member since
    October 2005
  • From: Ulster Co. NY
  • 1,464 posts
Posted by larak on Tuesday, November 7, 2006 9:35 PM
Isn't this commonly called 'hidden staging'? I do it with a set of five full sidings on a double track main.. Bring in one train and bring another out the far end. I think that this is fairly common in either single or double ended form. You do need a way to keep track of what is on the hidden tracks.

Karl

The mind is like a parachute. It works better when it's open.  www.stremy.net

  • Member since
    June 2004
  • From: Orig: Tyler Texas. Lived in seven countries, now live in Sundown, Louisiana
  • 25,640 posts
Posted by jeffrey-wimberly on Tuesday, November 7, 2006 8:38 PM
I had something similar one time. It was a track that led to a hidden yard. I would befuddle other modelers while they were running their trains on my layout by switching their train into the hidden area and watch the puzzled looks on their faces as a different train emerged from the other end.

Running Bear, Sundown, Louisiana
          Joined June, 2004

Dr. Frankendiesel aka Scott Running Bear
Space Mouse for president!
15 year veteran fire fighter
Collector of Apple //e's
Running Bear Enterprises
History Channel Club life member.
beatus homo qui invenit sapientiam


  • Member since
    October 2006
  • From: Under The Streets of Los Angeles
  • 1,150 posts
Turtle Track?
Posted by Metro Red Line on Tuesday, November 7, 2006 8:18 PM
In my N scale layout plan I have something I call a "Turtle Track." It's a section of track that appears to be part of a 2-track main which goes into a tunnel for a few feet but is really just a siding that deadends there. The purpose of it is so I can have trains go in there and "park" there, out of sight, to give the illusion that the train has gone to some faraway destination. Later on I can have the trains come out or back out to also make it look like they came from faw away. Anyone have this on their layouts or has seen something like it?

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!