Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

How High to make the next track (crossovers) level?

883 views
3 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    April 2003
  • 305,205 posts
How High to make the next track (crossovers) level?
Posted by Anonymous on Saturday, December 10, 2005 12:00 PM
OK, I have had my two cups of coffee, and ready to get to work (it's realy play) again. I am going with HO scale in a 20' x 20' room.
I have built the benchwork and phase #1 and phase #2 (there will be phase #3), The first layer of ridged foam on is completed on phase #1, I am starting on the next layer of track , it may or may not connect to the first layer (not sure yet).
My Question is there a standard height minium between layers of track ? I see some nice bridges on ebay that are like 4" and up. I am just wondering what you guys have set your crossovers and tunnel hights at.
The coffee is kicking in and I want to have some fun.
By the way this topic poster could use a spell checker ! Some people (like me) could realy use it.
Thanks again you guys (and gals) for your great replys.
The tip on using caulk (I had to run [ that coffee is realy kicking in now ] up stairs to train room to make sure of the correct spelling on the bottle, sure could use that spell checker!) to glue down the roadbed and track. It worked out great!

Thanks again, ennout
  • Member since
    December 2005
  • From: Spanaway, WA
  • 787 posts
Posted by SMassey on Saturday, December 10, 2005 1:00 PM
There is no real standard hight for tunnels and crossovers. 4" gives you a good clearance but you should always check it with your tallest car or locomotive that you are plannign on running. Remember ot lay track and roadbed down before measuring cause that will be there when you are done. And if you like Coffee you may want to check out this squirrel after he has had too much coffee.

http://www.illwillpress.com/vault.html and check out the toon called "So I Said to My Doctor."
the other ones are pretty good there too.

good luckwith the track laying

A Veteran, whether active duty, retired, national guard, or reserve, is someone who, at one point in his or her life, wrote a blank check made payable to "The United States of America" for an amount of "up to and including my life."

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Saturday, December 10, 2005 1:24 PM
Man oh man, I did not think that I could laugh so hard. what great link. thanks SMassey
  • Member since
    November 2005
  • From: Utica, OH
  • 4,000 posts
Posted by jecorbett on Saturday, December 10, 2005 1:31 PM
It's very simple. Decide if you want the option to run high level equipment (i.e. Amtrak Superlines, Hi-Cube boxcars etc.). Then measure the height of the tallest equipment you want to run. Then you need to measure from the TOP of the lower rail to the bottom of the bridge. I usually add 1/8" of clearance just to be safe.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!