Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

elevation height

947 views
5 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    February 2003
  • From: US
  • 59 posts
elevation height
Posted by greatn on Friday, September 9, 2005 6:39 PM
I suppost this would be just another newbe question but here goes.......
When you are constructing a layout from a drawing and the elevation show thing like 1" or 2" does this mean 1" from the plywood top or the from the top the the rails? My 4X8 goes from 0" to 71/2" on the drawing however now that the construction is finished, the rail height is 8&1/4" from plywood top to rail top.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, September 9, 2005 6:54 PM
I believe the height is above whatever serves as the 0" level, which is usually the plywood/base roadbed top. That's why you usually add a 1/2" or so to the heights of tracks that pass over other tracks (in HO) to give enough clearance when the track and roadbed is in place.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, September 9, 2005 6:57 PM
It's all relative, it doesn't matter where you measure from as long as it is always the same. So the difference in height from the lowest rail to the highest rail in your case should be 7.5". Does that make sense?

We were posting at the same time, I disagree a little, in most layout drawings I'd say that we are only talking about track, the top of the road bed is the relevant height. All heights are relative to track position.
  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,325 posts
Posted by selector on Friday, September 9, 2005 7:14 PM
Jeff is correct. The whole idea is to run rolling stock and locos, whichever is the heighest in any one piece that you will have..or that a guest might bring. So elevations are relative to the tracks, unless specified in the plan that it is in reference to a given topography. Clearances, for example, all relate to what will pass under them mobile; not from tunnel portal top, say, to the sub-roadbed, but from rail-top to the apex of the portal, and anything beyond it. Same for overpasses, gantries, etc.
  • Member since
    February 2003
  • From: US
  • 59 posts
Posted by greatn on Friday, September 9, 2005 7:43 PM
Hey thanks guys!! That is what I figured but I wanted to double check.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Saturday, September 10, 2005 2:24 PM
Yea, thanks! Guess I thought wrong about the elevation thing all these years, too. [B)]

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!