QUOTE: Originally posted by Duce My question is should I have all the track layed out (not tacked down) before I start putting in my grades or should I pick a spot and just start building?
QUOTE: I started the yard already. Its finish except for the details ( rock, Grass, ect) Should I just go with it and knock out a section at a time or wait and get all the track layed down?
Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.